Submit the $100 application fee.
~'~~ --,_. Show or note the distance to opposite and adjacent drivewaXs along Welsh Avenue.
•,~ ~ ~
- f-wa
' wa width at then ht o y. (~
_~ Dimension the drive y g ~~ r..~,~,~~ v`
'i ~ ~ Dimension the handicap parking. spaces,
Vehicles in the parking row closest to the building cannot overhang or block the walkway.
Depending on the canopy poles, and if there is a landing. in front of the ramps, the length
of the parking spaces may need to be extended.`
Will there be any utility connections on the side of the building facing Welsh Avenue? If
so, they must be adequately screened from the right-of--way.
The water meter for -the building must. be located within. the right-of--way or a public utility
easement.
Add a ,general note that no additional curb cuts. will be allowed for Phase. II of this
development.
Relocate ro osed manhole #1 into a public utility easement for access. ~~-°~ ~~~
~P p
Note the proposed 6" PVC'sanitary sewer line as public or private.
Add a .legend. containing: the minimum,. maximum and average
and sanitary sewer demands. ~''
Landscape Plan Related.•
_, ~r~creen the parking spaces: closest to Welsh Avenue.
Add the street tree requirement to the landscaping le
v (frontage) - 30' (drivewaywidth) / 32 = 4 trees from
Comments/Concerns;.
~f
`~
..~~~
V
~~-
~~
~~
per of street trees = 150'
;art h M imc'p~I~evelopment Group was given. a copy of the redlined
.Paving Details" an "Grading, Drainage & Erosion Control Plan .
oordinate the electrical service re rements w• Elec ricagl C
Tony Michalsky at (409) Z64-366 ~ ~~.~.
Coordinate. telephone service et is with G.T. ,Representative
821-4723.
SUBMIT 3 COMPLETE SETS OF
LANDSCAPE PLAN ATTACHED
PERMIT PROCESS. COORDII
TECHNICIAN NATALIE RUIZ AT
~~~
~~
STAFF PRC REPORT {~~Ll~-, ,~%~a~~~--`~`- ~ ~~-r----
--~~-~
Holleman & Welsh Office Building ~~---
DING F ITH THE REVISED SITE AND
CONTINCTE WITH PHASE II OF THE BUII.,DING
TE ~R~~'T S WITH P
6~4-~~ M
~k?a~+~
V
`GU ~/ v/
STAFF PRC REPORT
Holleman 8~ Welsh Office Building
Case #96-430
Ordinance Reauirements•
Site Plan Related
_. Submit the $100 application fee.
._ Show or note the distance to opposite and adjacent driveways along Welsh Avenue.
- Dimension the driveway width at the right-of way.
- Dimension the handicap parking spaces.
- Vehicles in the parking row closest to the building cannot overhang or block the walkw
Depending on the canopy poles, and if there is a landing in front of the ramps, the len
of the parking spaces. may need to be' extended. ay
~h
- Will there be any utility connections on the side of the building. facing Welsh Avenu ~
so, they must be adequately screened ;from the right-of--way, e ~ If
_ The water meter for the building must be located within the right-of-wa or a
easement. y public utility
- Add a general note that no additional curb cuts will be allowed fo
development. r Phase II of this
Relocated proposed manhole #1 into. a public utility easement for access
Note the proposed 6"PVC sanitary. sewer line as public or private.
® Add a legend containing the minimum, maximum and average domestic wa
and sanitary sewer demands. ter, irrigation
Landscape Plan Related.•
_. Screen the parking spaces closest to Welsh Avenue.
._ Add the street tree: requirement to the landscaping legend. Number of street tr
(frontage) - 30' (driveway width)132 = 4 trees from Plant List B. ees = 150'
Comments/Conc rns•
Greg .Taggart .with.. Municipal Development Group was v
py of the redlined
"Handicap ~ paving Details" and "Grading, Drainage & Ero on Control PI
an".
_.._ Coordinate the. electrical service requirements with Electrical O eration
Tony Michalsky at (409) 764-3660: P s Coordinator
_ Coordinate telephone service details with G.T.E. Representative L
821-4723, averne Akin at (409)
SUBMIT 3 COMPLETE SETS OF BUII-DING PLANS WITH
LANDSCAPE PLAN ATTACHED TO CONT THE WISED SITE AND
PERMIT PROCESS. COORDINATE F ~JE WITH PHASE II OF THE BIJII.,DING
TECI-IlVICIAN NATAI.,IE RUIZ AT (409) 764-35UT7p~ S~MITTALS WITH PLANNIlVG
9. ' S
PROJECT REVIEW COMMITTEE REPORT
October 13, 1997
TO: George. Stuart
209 A University Drive, College Station, TX 77840
Greg Taggart, Municipal Development Group
203 Holleman Drive East,. College Station,. TX 77840
FROM: .Project Review Committee
Jane Kee,. City Planner
Veronica Morgan, Assistant City Engineer
Ron Silvia, P&Z Representative
Others Attending
Natalie Ruiz, Planning Technicia
Jon Mies, Fire Marshal
Tony Michalsky, Electrical Operations Coordinator
SUBJECT: Parking Lot Plan -Holleman & Welsh Office Building; proposed 5200 square
foot office. building on lot 5, block 1 of the Holleman and Welsh Addition along
the east side of Welsh Avenue just south of the Holleman intersection. (97-430)
A Project Review Committee meeting was held Wednesday, October 8,.1997 to discuss the above
mentioned parking lot plan. Assistant City Engineer Morgan moved to approve the site plan with
the following ordinance requirements and comments. (The following is a list of ordinance
requirements and comments identified by the Project Review Committee. This list does not
relieve the .applicant of total compliance with all current. ordinance requirements.)
CONDITIONS OF APPROVAL.
Ordinance Reduirements: --~-
Site Plan Related
Submit the- $100 application fee.
Show or note the distance to opposite: and adjacent driveways along Welsh Avenue.
Dimension the driveway width at the right-of-way.
_ Dimension the handicap parking spaces.
_ Vehicles in he parking row closest to the building cannot overhang or block the walkway.
Depending on the canopy poles, and if there's a landing. in front of the ramps, the length
of the. parking spaces may need to be extended.
_ Will there be any utility- connections on the side of the building facing Welsh Avenue? If
so, they must be adequately screened from the right=of--:way.
PRC Report
Holleman & Welsh
Case #97-430
Page 2 of 3
CONDITIONS OF APPROVAL
Ordinance Requirements (cont.l:
Site Plan Related
_ The water. meter for the building must be located within .the right-of-way or a public utility
easement.
_ Add a general note that no additional curb cuts will be allowed for Phase II of this
development.
_ Relocate proposed manhole #1 into a public utility easement or extend the public utility
easement to cover the manhole..
Note the proposed-6"PVC sanitary sewer line as public or private.
_ Add a legend containing the minimum, maximum and average domestic water, irrigation
and sanitary sewer demands.
Landscape Plan Related.•
_ Screen. the parking spaces closest to Welsh Avenue.
_ Add the. street tree requirement to the landscaping legend,... Number. of street trees = 150'
(frontage) - 30' (driveway width) / 32 ~ 4 trees from Plant List B.
Comments/Concerns:
Greg Taggart with Municipal Development Group was given a copy of the redlined
- "Handicap & Paving Details" and "Grading, Drainage & Erosion Control Plan".
_ .Show and screen the transformer location along Welsh Avenue. The developer is
responsible for conduit installation and 20% of the cost of electrical. service. Coordinate
the electrical service requirements with Electrical Operations Coordinator Tony Michalsky
at (409) 764-3660;
The developer/owner is .responsible for providing and placing two 4" conduits with pull
string: from the outside building location to the. right-of-way of Welsh Street. The conduit
shall ell up 4' on the outside building location and be capped and ell up 6" in the right-of-
way and be capped. The outside building termination shall be within 20' of power - if .not,
the developer is responsible for providing and placing a 8' x 5/8" :copper ground rod at the
:base of the: termination. Coordinate telephone service with G.T.E. Representative
Laverne Akin. at (409) 821-4723,.
P&Z Representative. Silvia seconded the motion to approve the site plan with the above
mentioned conditions which passed unopposed (3 - 0).
PRC Report
Holleman & Welsh
Case #97-430
Page 3 of 3
SUBMIT 3 COMPLETE SETS OF BUII,DING PLANS WITH THE REVISED SITE AND
LANDSCAPE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUII.DING
PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS WITH PLANNING
TECI-INICIAN NATALIE RUIZ AT .(409) 764-3570.:
APPEAL PROCESSz An applicant may appeal the decision of the-Project Review Committee
to the Planning and. Zoning. Commission. wrtlun five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute.. a contractual acceptance of all conditions
imposed, and a waiver and .surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of
the final. site plan as approved by the PRC,. showing all changes and requirements imposed by the
PRC, and accompanied by a written explanation of those items being. appealed.. Until said copies
are on file, no furtherdevelopmentapgroval shall occur, and no further action by the Commission
shall take place. An applicant may appeal only .certain aspects of site plan. review, and in the
absence of discretionary review. by the Commission,. or review-pursuant to a petition, all other
aspects of the site plan shall be final. Any notice of appeal shall .state with particularity the aspects
which are to be appealed.