HomeMy WebLinkAboutMinutesPROJECT REVIEW COMMITTEE REPORT
September 5,1996.
TO: Victor Drozd, 2-D Homes
2702 Wildflower. Drive, Bryan, TX 77805
Deborah Keating,,Urban Design Group
909 Southwest Parkway East,. Suite E, College Station, TX 77840
FROM: Project Review Committee
Sabine McCully, Senior Pl
Veronica Morgan, Assistan ' y nginee
James Massey,. P&Z Chairman
Others Attending
Natalie'Ruiz, Planning Technici
Shirley Volk, Development Coordinator
Jon Mies,. Fire Marshal
Tony Michalsky, Electrical .Operations Coordinator
Laverne Akin, GTE Representative
ST.TBJECT: Parking Lot Plan -Drozd Site Plan; proposed .commercial office complex to be
located. on lot 1 of the Drozd Subdivision totaling 2.48 acres and generally located
in the southeast quadrant of State Highway 6 and Barron Road. (97-421)
A Project Review Committee meeting was held Wednesday, September 3, 1997 to discuss the
above mentioned parking _ lot plan. .Chairman. Massey moved to ' approve the .plan with the
following ordinance requirements and comments. (The following. is a list of .ordinance
requirements and. comments identified, by the Project Review Comnttee. This. list does not
relieve the applicant of total. compliance with all current ordinance requirements.)
Ordinance Requirements:
Site Plan Related
_ There is not adequate fire protection to building E. This area should be reconfigured so
that a fire lane may.. be extended. to cover .these two buildings with .the .necessary
turnaround .requirements. The fire hydrant could. also be relocated closer to building A as
suggested by Fire Marshal Jon Mies.
_ Dimension the distance between. buildings D and E.
_ Provide a 6' tall wooden fence. along the rear property line to screen the proposed
development from the existing. residential area. Staff .will look into the :possibility of
utilizing the existing fence along the xear of the single family lots that abuts this property.
Are you .asking for approval of the "Future 20' Access Drive" at this time? If so, show
the phase line and the required: curbing. (The connection to Barron Road and the Wilson
Plumbing site will be reviewed in the future before construction of the drive.)
y
PRC Report
Drozd Site Plan
Case #97--421
Page 2 of 3
Ordinance Requirements cont.):
Site Plan Related
_ Curbing must be installed around the perimeter of all paved surfaces. (Show curbing at
the end of all turnaround areas. including the edge of the "Future 20' Access Drive". )
Angle the proposed dumpster pad at 45° so that it can be easily accessed by a front-end
loading sanitation truck. (Clarify the use of the "Heil Trash Containers". These roll-off
containers cannot be accessed given the .proposed locations.) Staff. will work with Jim
Smith to determine ifboth types of trash receptacles are acceptable.
Note that the proposed sanitary sewer line is private.
Verify that there enough room for the .proposed fire .hydrant within the public utility
easement given the close proximity of building A.
Show the fire lanes throughout the site.
_ Correct the total number of handicap parking spaces provided to 5.
Landscape Plan Related
_ Are there any existing trees within the first 24' along the .State Highway 6 Frontage Road?
If not, make a note on the site plan.
_ Provide screening.. for. the parking. lot along the. State Highway 6 Frontage Road in
accordance with he Streetscape requirements.
_ Landscape calculations should be as follows:
_ Streetscape requirement: 185' - 25' = 160' / SA = 3.2 x 300 = 960 points..
_ Streetscape points (960) + Landscape points (3247) =4207 total points.
Trees along Hwy. 6: 160' 125 = 6.4 = 6 street trees..
Drainage PZan Related
Provide a manhole detail.
Note what kind of outlet structures will be used and where.
_ Verify the reference to a 14"RCP just south of the subject property on State Highway 6.
_ On sheet 3 of 4, Waterline Profile, show the flow.analysis for the pipe.
Note where the Cement Stabilization Detail is used.. (Shown as detail #5 on sheet 4 of 4.)
PRC Report
Drozd Site Plan
Case #97-421
Page 3 of 3
Comments/Concerns:.
_ The site .plan shows that wheel stops are being used with a 20' long parking space. Wheel
stops. are not required; however, they can be used with a minimum parking space depth of
20'. If the wheel stops are removed, the parking space depth maybe reduced to 18'.
Submit a TxDOT permit application for the proposed driveway location and. drainage that
will be discharged within the right-of--way.
_ Coordinate the electrical service requirements with Electrical Operations Coordinator
TonyMichalsky at (409) 764-3660.
_ The .developer/owner is responsible for providing. and placing conduit as shown on the
attached site:. plan... The conduit .shall ell up 4' at each outside building location. The
conduit shall have pull: string - no sharp bends in the conduit. The GTE termination
(dmarc) will be on' the outside , of each building.. The termination .must be within 20' of
power - if not, the developer/owner is responsible for providing and placing a 8' x 5/8"
copper .ground rod at the base of each termination. GTE will place two splice boxes
(manholes) in the 10' utility easement to access the° conduit -this is necessary for .cable
splicing. Please, provide telephone requirements for .each .building and the occupancy date.
Coordinate details with GTE Representative Laverne Akin at (409) 821-4723.
Assistant City Engineer Morgan .seconded the motion. to .approve the .site plan with the above
mentioned conditions which passed unopposed (3 - 0).
SUBMIT 3 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN. ONLY TO
CONTINUE WITH PHASE II OF THE BUII,DING .PERMIT PROCESS. COORDINATE
DETAILS WITH DEVELOPMENT COORDINATOR SHIl2LEY VOLK AT (409) 764-3570.
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee
to- the Planning and Zoning. Commission within. five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual. acceptance of all conditions
imposed, and a waiver and surrender of all complaints,. defects, or potential invalidity, whether
under state or federal: law. An applicant appealing the decision of the PRC shall file ten copies of
the final site plan as approved by the PRC, showing. all changes and requirements imposed by the
PRC, ,.and accompanied by a wntten explanation of those items being appealed. Until said copies
are on file, no further: development. approval shall occur, and no further action by the Commission
shall take place. An applicant may appeal only certain. aspects of site plan review, and in the
absence of discretionary review, by the Commission, _ or review, pursuant to a petition, all other
aspects of the site plan shall be final. Any notice of appeal: shall state with particularity the aspects
which are to be appealed. Coordinate appeal process through.. Development .Coordinator Shirley
Volk at (409) 764-3741.
~~
r .~
/'I
l
Ordinance Requirements:
Site Plan Related
Case #97-421
~~-off
There is not adequate fire protection to buildingR '~ and E. This area. should be
..reconfigured so that a fire lane may be extended o cover these.. two buildings with the
necessary turnaround requirements. ~~, ~7" - ~~`a~~~`"~ ~~~ ~,
`~~~
Dimension the distance between buildings D and E:
_~_Provide a 6' tall. wooden fence. along the rear ~r~o~perty line to screen the proposed
development from. the existing residential area.. ~~~ d'~" d~~
Are you asking for approval of the "Future a0'' Access Drive" at this time? If so, show
the necessary„phase line and the required curbing.
Curbing mus~nstalled around the perimeter of all paved surfaces. (Show curbing at the
end of all turnaround areas .including. th, e~edge of the "Futur~A~cc~ess Drive".),
Relocate the proposed ~u`mpst~lu'nd' bur~ld-i- Band .angle i~`so that the front-end
loading truck can easily access it. (Clarify the use of the "Heil Trash Containers". These
.roll-off containers cannot be accessed given the proposed locations) Staff will work with, p
Tim Smith to determine if both types of trash' receptacles are acceptable. (A,,,,.., /~~..~~
Tlie -site plan shows that wheelstops are being used with a 20' to par ng space.
Y
Wheelstops are. note required; however, they can be used with a minimumparking space
depth of 18'.
Show the fire lanes throughout the site.
cam-/~
• ~.. --- ..w ~.w - - • - '
~+G~ ~-
Correct the total number. of handicap parking spaces provided to 5. ~-S~'~'-
Wit ' king lot of i i is the curb at the end of the. urnaround on the
operty line?
Landscape Plan Related
V Are there any existing trees within the first 24' along the State Highway 6 Frontage Road?
If not, make a note on the site plan.
Provide screening for .the parking lot along. the State Highway 6 Frontage Road in
accordance with the Streetscape requirements.
~ i r ~~
STAFF NOTES
~ ~ 2-D Homes
_~ Is theproposed sanitary sewer line private? If not, it must be contained within a public
utility easement. 1!(.~
~- ~
StaffNotes
2-D Homes
Case #97-421
Page 2 of 2
Ordinance Requirements (cont.
Landscape Plan Related
Landscape calculations should be as follows:
Streetscape requirement: 185' - 25' = 160' / 50 = 3.2 x 300 = 960 points.
Streetscape points (960) + Landscape points (3247) = 4207 total points.
Trees along Hwy. 6; 160' / 25 = 6.4 = 6 street trees.
Drainage Plan Related
_ See the drainage report redlines: for comments. •
~~/ ~I
u t t er i 1 an ro t. ~ ~. ~ ~K,~~~~
Y
Note what kind of outlet. structures will be used and where.
`~~^'- 9
~(~frect the reference to a 14" RCP just south of the subject property on State Highway .
On shee-n 3 of 4, Waterline Profile, show the. flow analysis for the pipe.
t~ c~` where the Cement Stabilization Det ' is used. (Shown as detail #5 on sheet 4 of 4.)
- ~-
...
Comments/Concerns: c,,
i
_ Coordinate the electrical service requirements with Electrical Operations Coordinator
Tony Michalsky at (409) 764-3660
_ Coordinate necessary easements, conduit. placement .and telephone service details with
G.T.E. Representative Laverne Akin at (409) 821-4723.
SUBMIT 3 COMPLETE SETS OF CONSTRiJCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN .ONLY TO
CONTINUE. WITH PHASE IL QF THE. BUILDING PERMIT PROCESS. COORDINATE
DETAII,S WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570: