HomeMy WebLinkAboutMinutes~,: a PROJECT REVIEW COMMITTEE REPORT July 23, .1997 TO: W. C. Scarmardo 2402 Broadmoor, D-1, Suite 102, Bryan, TX FROM: Project Review Committee Jane Kee, City Planner Kent Laza, City Engineer Ron Silvia, P&Z Representativ Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Jon Mies, Fire Marshal Tony Michalsky, Electrical Operations Coordinator Laverne Akin, GTE Representative SUBJECT: Parking Lot Plan - Kapser Office Park; proposed three office buildiings totaling 13,735. square feet to be located at 524 University Drive, south of Audio Video and David Gardner Jewelers. (97-419) A Project Review Committee meeting was held Wednesday, July 23, 1996 to discuss the above mentioned parking lot plan. City Engineer Laza moved to approve. the site plan with the following ordinance requirements and comments. The following is a list of ordinance requirements and comments identified by the Project Review Committee. This list does not relieve the applicant of total compliance with all current ordinance requirements. CONDITIONS OF APPROVAL Ordinance Requirements: Sheet C-1 _ Provide a legend of symbols. Provide utility demands for the new construction. (Include domestic. and irrigation water demands in maximum gallons per minute and sewer demands in average gallons per day.) The existing dumpster ize and location will need to be analyzed for the entire site. Show the fire lane. markings throughout the site. Show existing and proposed utilities and their location. Label the fire hydrants as existing or proposed. Show the location of water meters. Note that the overhang in the fire lane must have a minimum 14' clearance. Sheet ME-L• Show the location of the water. and sanitary sewer service lines. J PRC Report Case #97-419 Page 2 of 2 Ordinance Requirements (cont.):. Sheet C-2: Submit a drainage. report for the site. _ Provide a drainage analysis of the 12" pipe between David Gardner's and building A to ensure capacity. Show where the 6" storm pipe near the front of building A drains. Remove the. following note from sheet C-2 and place on sheet C-1 "This project is not located in a 100 year flood plain". Comments/Concerns: _ Note on the landscape plan that any areas disturbed during construction must be returned to the natural condition. _ Coordinate the electrical service requirements with Electrical Operations .Coordinator Tony Michalsky at (409) 764-3660: _ The developer/owner. is responsible. for providing and placing two 4" conduits with pull string from each building to the existing overhead line along the northwest side of the property. The conduits shall stub up 4' of the outside building location and 6" at the power pole.. The conduits shall have no sharp bends. Outside termination shall be within 20' of power - if not, the owner is responsible for providing and placing a 8' x 5/8" copper ground rod at the base of the outside termination. GTE's termmnation (DMARC) will be on the outside of each building. Coordinate details with Laverne Akin at (409) 821-4723.. _ Gas service is available to all three buildings. Coordinate details with Lone Star Gas Representative Don Fazzino at (409) 776-0627. Planning and Zoning Commission Representative Silvia seconded the motion to approve the site plan with the above mentioned conditions which. passed unopposed (3 - 0). SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN & LANDSCAPE PLAN ONLY TO CONTINUE WITH PHASE II OF THE. BUII,DING PERMIT PROCESS: COORDINATE DETAILS WITH DEVELOPMENT COORDINATOR SHIRLEY VOLK AT (409) 764-3570.. APPEAL PROCESSt An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning Commission within five days after the PRC Committee meeting. Failure to appeal the PRC action shall constitute a contractual .acceptance of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state or federal law.: An applicant. appealing the decision of the PRC shall file ten. copies of the final site. plan as approved by the PRC, showing all changes. and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed: Until said copies are on file, no further development approval shall occur, and no further action by the Commission` shall .take.. place. An applicant may appeal only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed, Coordinate. appeal process through :Development Coordinator Shirley Volk at (409) 764-3741. ~~~pFT «-a ) ~ .2~~ STAFF NOTES ~ ~ ~ ~`2. Kapser Office Park ~~~~~- Case #97-419 1 i ~- Ordinance Requirements: ~ C n ~ `` a- ~~ Sheet C-1 r2~ ~. ~/ Provide a legend of symbols. _ ln~~ ~~ 1~~ Provide utility demands for the new construction. (Include domestic and irrigate n water demands in maximum gallons per minute and sewer demands in average gallons per day.) The exi ing du ps er size and location will need to be anal zed for the entire site. c,~ ~~ Show the fire lane marlcmgs throughout the site. Show existing and proposed utilities and their location. Label the fire hydrants as existing or proposed. Show the location of water meters. pmg is sed ctly ove ater line. Sheet C-2: Submit a drainage report for the site. Provide a drainage analysis of the 12" pipe between David Gardner's and building A to ensure. capacity. Show where the 6" storm pipe near the front of building A drains. Remove the following note from sheet C-2 and place on sheet C-1 "This project is not located in a 100 year flood plain". /~ Sheet ME-1: ~/ Show the location of the water and sanitary sewer service lines. Comments/Concerns: _~ There are several .notes on sheet C-5 and ME-1 that must be addressed. Resubmit the redlined sheet'with the revised drawings. _~ Coordinate the electrical service requirements with Electrical Operations Coordinator Tony Michalsky at (409) 764-3 660: Coordinate necessary easements, conduit placement and t lephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. ~ ~ . _/ Gas service is available to all three buildings. Coordinate details with Lone Star Gas Representative Don. Fazzino at (409) 776-0627. ~ ~ ~~~~ SUBMIT 4 COMPLETE .SETS OF CONSTRUCTION DOCUMENTS WI'~il~-i-i THE REVISED SITE PLAN ATTACHED AND 3 .COPIES OF THE REVISED SITE/PLAN ONLY TO CONTINUE WITH PHASE II OF THE BUII,DING PERMIT PROCESS. COORDINATE DETAILS WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT {409) 764-3570.