Loading...
HomeMy WebLinkAboutMinutesNORTIiGATE REVITALIZATION BOARD SUBCOMMITTEE REPORT July 11, 1997 TO: Kent Laza, City Engineer City of College Station FROM: Northgate Revitalizatio Jane Kee, City Pl er Steve. Homeyer, As ' t t e ty r Julius Crribou, NRB Chai an Tara Sopasakis, NRB Member Cheryl Anz, NRB Member Richard Benning, NRB Member Others Attending Shirley Volk, Development Coordinator Todd McDaniel, Sr. Economic Dev'1 Analyst Paul Kaspar, Graduate Civil Engineer SUBJECT: Temporary Construction Parking Lot;. proposed Northgate construction related parking lot to be located on lots 8-11, block 11 of the Boyett Subdivision on the southeast corner of the Wellborn Road and Louise Street intersection. A Northgate Revitalization Board Subcommittee (NRBS) meeting was held Wednesday, July 9, 1997 to discuss the above mentioned .parking lot. Richard Benrung made. a motion which was seconded by Jane Kee to approve the parking lot .plan for the above mentioned parking lot with the following conditions: CONDITIONS OF APPROVAL: • Time limit for this temporary lot is 2 years, after which time the lot will be re- evaluated for its use. • A 6 foot solid wood screening. fence. is located along the eastern property line. • A combination of 3 foot high berm and landscaping to screen and provide a barrier to vehicle traffic should be located along. the southern property line. (There were discussions with the owners of .Cafe Eccel concerning joint participation in this screen. The City will install the berm and landscaping.. Cafe Eccel will maintain that landscaping • Landscape screening (3 foot .high) should be included along Wellborn Road and Louise Street. • Sleeves for irrigation and electricity should be installed with the parking lot. • Security lights should be installed on .the existing utility poles and the monthly bill should be sent. to the Northgate Merchants Association: • The parking lot shall be built to all City construction: standards, including base materials and depth, curb; gutter, with exception of the surface, which can consist of seal coat to allow for easy asphalt overlay in the future if the .lot becomes permanent. The motion with the above conditions was approved unanimously, (6 - 0). NRBS Report City Construction Lot Page 2 of 2 APPEAL PROCESS: An applicant may appeal the decision of the NRBS to the Planning and Zoning Commission. Failure to appeal the NRBS action shall constitute a contractual acceptance of all conditions imposed, and a waiver and surrender of .all complaints, defects, or potential invalidity, whether under state or federal law. An applicant appealing the decision of the NRBS shall file ten copies of the final site .plan as approved by the NRBS, showing all changes and requirements imposed by the NRBS, and accompanied by a written explanation of those items being appealed. Until said copies. are on file, no .further development approval shall occur, and no further action by the Commission shall take place. An applicant may appeal only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other .aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed.