Loading...
HomeMy WebLinkAboutMinutes PROJECT REVIEW COMMITTEE REPORT July 3, 1997 TO: James G. Heflin, College Station Baptist Church 2555 Texas Avenue South, College Station, TX 77840 K.W. Brown Environmental Services 501 Graham Road, College Station, TX 77840 FROM: Project Review Committee: Sabine. McCully,. Senior Planner Kent Laza, City Engineer J~~ James Massey, P&Z Representativ -7~~1 Others Attending Natalie Ruiz, Planning Technician Shirley Volk, Development Coordinator Laverne Akin,. GTE Representative Tony Michalsky, Electrical Operations Coordinator SUBJECT: Parking Lot Plan -College Station. Baptist Church; proposed parking lot addition for the existing church located at 2555 Texas Avenue South just south of Homestead Savings Association. {97-416). A Project Review Committee (PRC) Meeting was held Wednesday,- July 2, 1997 to discuss the above mentioned parking lot plan..: Commissioner Massey moved to approve the site plan with the following ordinance requirements. (The following is a list of ordinance requirements and comments identified by the PRC. This list does not relieve the applicant of total compliance with all current ordinance requirements:.) Ordinance Requirements: Enlarge the text in several areas so that it is egible. (The area between lots 1 and 2 on the "Easements" detail is not legible. The e radii :dimensions :near the front of the building are not legible.) Verify that the berm that runs parallel to Texas Avenue is at least 2' above the Texas Avenue elevation. Note the color of the .decorative pavers. (They must be .earth tones and not gray.) Comments/Concerns: Any relocation of existing telephone facilities will be at the owner's expense. Coordinate service`detailsvth G.T.E. Representative Laverne Akin at (409) 821-4723. City Engineer Laza seconded the motion to approve the parking lot plan with the above mentioned conditions which passed unopposed (3 - 0). PRC Report C.S. Baptist Church Case #97-416 Page 2 of 2 SUBMIT 5 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN ONLY. A DEVELOPMENT PERMIT WII,L BE REQUIRED PRIOR TO CONSTRUCTION. COORDINATE. DETAILS.. WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570. APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning Commission within five days after the PRC Committee meeting. Failure to appeal the PRC action shall constitute a contractual acceptance. of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of the. final site plan as approved by the PRC, showing all changes and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed. Until said copies are on file,. no further development approval -shall occur, and no further action by the Commission shall take .place. An applicant may appeal only .certain aspects of site plan review, and in the absence of discretionary review by .the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed. ~,(~ STAFF NOTES College Station Baptist Church 2 _ Case #97-416 Ordinance Requirements: Enlarge the text in several azeas so that it is legible. (The azea between lots 1 and 2 on the - "Easements" detail is not legible. The radii-dimensions near the front of the building are not legible.) Verify that the .berm that runs parallel to Texas Avenue is at least 2' above the Texas II Avenue elevation. n^~ C~'~ What color are the decorative pavers? They must be earth tones and not gra~~. ~n ~~' ~ Comments/Concerns: `^'' ' ~~ ~,~=AcTdre the re yes on ine sr a uG~~~~1GG1. 1GLU111 c.~ ...•.+ ~ ... _._______~„-® Coordinate the electrical service requirements with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660: ~ Coordinate t ephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. `~°~ ~/ Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409) 776-0627. SUBMIT~OMPLETE SETS OF CONSTRUCTION DOCUMENTS. WITH THE REVISED SI ORPLIN ,~ D TAILS WITH DEVELOPMENT COORDINATOR SHIRLEYAVOLOK AT CO (409) 764-3570. STAFF NOTES College Station Baptist Church Case #97-416 Ordinance Requirements: Enlarge the text in several areas so that it is legible. (The area between lots 1 and 2 on the - "Easements" detail is not legible. The radii dimensions near the front of the building are not legible.) _ Verify that the berm that runs parallel to Texas Avenue is at least 2' above the Texas Avenue elevation. What color are the decorative pavers? They must be earth tones and not gray. Submit a drainage report for the site. Comments/Concerns: _ ...A~s~,~,dlfiies on the. site detaiTs`h~et ~trxrrre~at t'lre`°~RC~l~le~ting:. _ Coordinate the electrical service :requirements with .Electrical Operations Coordinator Tony Michalsky at (409) 764-3660.: _ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. _ Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409) 776-0627. SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN ONLY. COORDINATE DETAILS WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570,