PROJECT REVIEW COMMITTEE REPORT
July 3, 1997
TO: James G. Heflin, College Station Baptist Church
2555 Texas Avenue South, College Station, TX 77840
K.W. Brown Environmental Services
501 Graham Road, College Station, TX 77840
FROM: Project Review Committee:
Sabine. McCully,. Senior Planner
Kent Laza, City Engineer J~~
James Massey, P&Z Representativ -7~~1
Others Attending
Natalie Ruiz, Planning Technician
Shirley Volk, Development Coordinator
Laverne Akin,. GTE Representative
Tony Michalsky, Electrical Operations Coordinator
SUBJECT: Parking Lot Plan -College Station. Baptist Church; proposed parking lot addition
for the existing church located at 2555 Texas Avenue South just south of
Homestead Savings Association. {97-416).
A Project Review Committee (PRC) Meeting was held Wednesday,- July 2, 1997 to discuss the
above mentioned parking lot plan..: Commissioner Massey moved to approve the site plan with the
following ordinance requirements. (The following is a list of ordinance requirements and
comments identified by the PRC. This list does not relieve the applicant of total compliance with
all current ordinance requirements:.)
Ordinance Requirements:
Enlarge the text in several areas so that it is egible. (The area between lots 1 and 2 on the
"Easements" detail is not legible. The e radii :dimensions :near the front of the building are
not legible.)
Verify that the berm that runs parallel to Texas Avenue is at least 2' above the Texas
Avenue elevation.
Note the color of the .decorative pavers. (They must be .earth tones and not gray.)
Comments/Concerns:
Any relocation of existing telephone facilities will be at the owner's expense. Coordinate
service`detailsvth G.T.E. Representative Laverne Akin at (409) 821-4723.
City Engineer Laza seconded the motion to approve the parking lot plan with the above
mentioned conditions which passed unopposed (3 - 0).
PRC Report
C.S. Baptist Church
Case #97-416
Page 2 of 2
SUBMIT 5 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN ONLY. A
DEVELOPMENT PERMIT WII,L BE REQUIRED PRIOR TO CONSTRUCTION.
COORDINATE. DETAILS.. WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT
(409) 764-3570.
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual acceptance. of all conditions
imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of
the. final site plan as approved by the PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a written explanation of those items being appealed. Until said copies
are on file,. no further development approval -shall occur, and no further action by the Commission
shall take .place. An applicant may appeal only .certain aspects of site plan review, and in the
absence of discretionary review by .the Commission, or review pursuant to a petition, all other
aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects
which are to be appealed.
~,(~ STAFF NOTES
College Station Baptist Church 2 _
Case #97-416
Ordinance Requirements:
Enlarge the text in several azeas so that it is legible. (The azea between lots 1 and 2 on the
- "Easements" detail is not legible. The radii-dimensions near the front of the building are
not legible.)
Verify that the .berm that runs parallel to Texas Avenue is at least 2' above the Texas
II Avenue elevation. n^~
C~'~
What color are the decorative pavers? They must be earth tones and not gra~~.
~n
~~'
~ Comments/Concerns: `^'' ' ~~
~,~=AcTdre the re yes on ine sr a uG~~~~1GG1. 1GLU111 c.~ ...•.+ ~ ... _._______~„-®
Coordinate the electrical service requirements with Electrical Operations Coordinator
Tony Michalsky at (409) 764-3660:
~ Coordinate t ephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723. `~°~
~/ Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409)
776-0627.
SUBMIT~OMPLETE SETS OF CONSTRUCTION DOCUMENTS. WITH THE REVISED
SI ORPLIN ,~ D TAILS WITH DEVELOPMENT COORDINATOR SHIRLEYAVOLOK AT
CO
(409) 764-3570.
STAFF NOTES
College Station Baptist Church
Case #97-416
Ordinance Requirements:
Enlarge the text in several areas so that it is legible. (The area between lots 1 and 2 on the
- "Easements" detail is not legible. The radii dimensions near the front of the building are
not legible.)
_ Verify that the berm that runs parallel to Texas Avenue is at least 2' above the Texas
Avenue elevation.
What color are the decorative pavers? They must be earth tones and not gray.
Submit a drainage report for the site.
Comments/Concerns:
_ ...A~s~,~,dlfiies on the. site detaiTs`h~et ~trxrrre~at t'lre`°~RC~l~le~ting:.
_ Coordinate the electrical service :requirements with .Electrical Operations Coordinator
Tony Michalsky at (409) 764-3660.:
_ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723.
_ Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409)
776-0627.
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED AND 3 COPIES OF THE REVISED SITE PLAN ONLY.
COORDINATE DETAILS WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT
(409) 764-3570,