From: Sabine McCully
To: Svolk
Date: 12/15/97 12:55PM
Subject: napa
shirley, muzz went out and looked at the landscaping and we can't release the bond yet. looks like we
don't have enough points out there. if they start to argue with you, have them call me, not muzz. we
may need to work out a schedule for compliance`and they may need to extend their bond (i don't know
when it expires).
~~ on the parking issue, please pass that info on to them and let them know that we are having code
enforcement look at the entire area. napa people may not be the. only ones parking on the grass in that
area - it may be sevcik and the .bank as well. thanks!
i
i,
w
i
I~~
ti
Dec. 15, 1997 ~~
/, ~~
~p ~ ~
Notes RE: Landscape inspection of Napa Auto Part Store ~ O
0
Installed landscaping is not what was approved on plan. a only plant materials installed are along the D
frontage road and consists of 2 existing 6 and 7" CAL ater oaks and 5 newly installed approx. 2" CAL _
oaks. Underneath these trees are approx. 40 boxes (7 - ery tiny plants - am unsure if they are dwarf \
or just too small. Tn any event the required point total i 2084 d they have only installed approx. (if I
am generous with the size. of the installed trees and award em 150 pts. each) 750 point in trees and 400 Q
points in shrubs for a total of 1150 points. Thy are short by 934 points. Also there is no landscaping ~~U p
anywhere else on the property. But most of does appear to be sodded. 1~
Additonally, they are .parking along the south side of the property on the dirt behind the raised curb. And
hence the grass is ruined and the dirt is very rutted.
Also there is considerable mud along the west side that maybe the result of utility construction. It is not
clear, but it is unacceptable to leave it that way.
0R~
So it appears that they have a lot of work to do and do not release the landscape bond. ~~
V
Nanette Manhart ~
y
- A '- CITE OF` ~OI..~C.iE STATIOI`I
..&
{
r r ~ . '~ ~o~ gfae~ x~uc~x ~~~4i 11 ~ A P exams 1~u~.as~ss~
February 21, 1997
Mr. J.B. Goolsby
737 S. Rosemary
Bryan, Texas 77802
RE: Driveway Variance Request for Lot 2R, Block 14C Southwood Valley Section 19
Dear Mr. Goolsby:
I have reviewed the information you submitted with regard to your driveway variance request at the
above referenced location. The Driveway Access Location and Design Policy states "In addition
to ramp spacing, driveways om frontage roads under the jurisdiction of the Texas Department of
Transportation shall also meet the other requirements of this chapter as major arterial streets". As
we discussed in the pre-development meeting on February 18, 1997 the minimum driveway spacing
for adjacent driveways on a major arterial street is 275 feet. In my decision, I took into account
that this property is only 204.38 feet wide and is substantially less than this minimum. However,
this property currently has access by way of the 30 foot access easement located adjacent to Lot 1
(also known as Sevcik's Texaco). For this reason, I have denied your request to deviate from the
minimum driveway spacing. If you choose to pursue this further, you have the option to appeal
this decision to the Planning and Zoning Commission. This commission meets on the first and
third Thursday of every month at 7:00 p.m. in the Council Chambers.. If you select this' option,
please submit a request either in writing or verbally to myself and' I can schedule you for the next
available meeting. If you have.. any questions or comments, I can be contacted at 764-3570.
Sinc rely,
Steve Homeyer
Asst. to the City Engineer
xc: Kent Laza, City Engineer
Natalie Thomas Ruiz, Planning Technician
~re-Development File
February 24, 1997
Natalie Thomas Ruiz
City of College Station
Development Services
College Station, Texas.77840
Re: Curb Cut -Lot 2R block 14C
Southwood Valley Section. l9
Dear Natalie:
Thanks for your assistance. Attached is the resubdivision plat marked for curb cuts along
the 281$ feeder road between Hilltop Drive and Longmire.
As requested weave shown the curb cut locations and distances of existing curb cuts
between Hilltop and access easement behind the Firestone store.
We request a curb cut at the west property line next to the Past Office drainage way. This
leaves 155 feet between requested curb cut and access existing easment behind Firestone.
This business with anticipated start up (first year sales) of $1,OQO,Q00 would represent a
valuable addition to the College Station market and cannot be built without suitable
property. We appreciate your help in this matter.
Thank you,
-' ~ G~-~~,j/~
J.B. Goolsby Gegrge N~ ~ a~lek
'~ ~'7~
~~ fa~~ ~~f~pui~~ ~,
~~~~~
~.
-_.,__ ~.
.,
~~
`_ ~0
.. ._
_-
1
-.
_--
0
)..,
f
_..
g~ c
c -`~
Ordinance Requirements:
Site Plan Related
STAFF NOTES ~ ~-~}- ~
C / ~
~a Aut® Parts Store
Case #97-412
June 2, 1997
Provide a parking le end outlinin ~~num arking spec provided and required.
~0. 8 s aces + warehouse 3.62 spaces = 15 parking. spaces
~Parkm requued p cress to the warehouse area.)
(Note that this. is calculated based on hnuted customer a
Provide a vicinity map on the site plan.
Note on the site plan the existence of floodplain on the subject property.
A sidewalk.. may be required along the F.M. 2818 frontage by the Project Review
Committee.
Show the location of all existing utilities,~sei~ents~ and the location of proposed services.
~,,,~ Provide the following utility demands:
Water:
/l~omestic demands (minimum, maximum & average in gallons per minute).
irrigation demands (minimum, maximum & average in gallons per minute).
Sanitary Sewer:
i~Sewer demands (minimum, maximum ~c average in gallons per day).
~/ There must be a raised, landscaped island at the end of every parking row.
~~Curbing must be installed around the perimeter of the parking lot. (It is difficult to tell
what happens to the curbing at the end ®f the driving aisles and the rear of the building.)
The circulation aisle must be a minimum of 23' in width. (The parking in front of the
building provides for only. a 20' circulation aisle.)
~' The radii on the driveway opening must be a minimum of 15'.
Show the location of all existing and/or proposed fire hydrants.
~^Provide site details including sidewalk, curbing, paving, ramps, etc.
.~
Show the meter locations including irrigation and domestic water meters. _ Oi ~~~~
Coordinate the du ster size and location with staff. Other uses similar to the one u~,`,
proposed require r cubic and front-end loading. du~m suer. If this type of dumpst~r is ,~,u~
required, it must be screened from~a p~u 1ic nghts-o -w~ ay. ~ ~`'~~~
Napa Auto Parts
Page 2 of 2
Ordinance Reauirements (contJ:
Grading Plan Related
The final grading plan needs attention. (There is a 2.5' difference in grades along the
entrance dnve~ (~' /
How will detention handled for-the site? The drainage cannot flow into the Post Office
--drainage facility unless you have permission to do so. A drainage .report will be required
addressing these. items.
Landscape Plan Related
The phase line shown must be placed a minimum of 20' from any developed area.
The 2 he F MC2818 fronts eer Up~o se en parki g spa esOare allowed or 1134 sq t ft of
along t g
pavement is allowed to encroach into this reserve area.
Provide a landscape legend outlining the streetscape and landscape requirements. This
legend should include the types of trees and shrubs with caliper size specified and points
claimed for each. (See the example attached.) The total point requirement should be
.cal/culated as follows:
V Landscape points required based on site area =
/ streetscape points required based on frontage = 1044~oints.
(204' frontage - 30' access drive = 174' frontage / 50 x 300)
_~# of trees required along F.M. 2818 frontage = 174' / 25 = 7 trees.
Landscape Points + Streetscape Points 1044 pts. =TOTAL POINTS
=''(~ Clearly distinguish what areas will. be grassed. (It is difficult to tell what is happening
behind the building.)
[/ Provide a general note that states all disturbed areas within the rights-of--way and adjacent
properties must be seeded or sodded.
Provide an irrigation plan prior to issuance of a certificate of occupancy. Note that an
irrigation system will be mstalled'prior to issuance of a certificate of occupancy.
Comments/Concerns:
_ Coordinate the electrical service requirements with Electrical Operations Coordinator
Tony Michalsky at (409) 764-3660:
The developer is responsible for providing and .placing one 4" conduit with pull string
from the outside building termination to the :edge of the property. The conduit shall ell up
4' at the. outside building termination and 6" at the property. Both. ends of conduit shall
be capped. The termination shall be within 20' of power; if not, the developer is
responsible for providing and placing a 8' x 5/8" copper ground rod at the base of the
termination. Coordinate details witk Laverne Akin at (409) 821®4723.
Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409)
776-0627.
Example Landscape Analysis
Landscape Point Calculation Streetscape Point Calculation
Total Site Area: 43,560 sq. ft (1 acre) Frontage -.drives =120 ft.
Points required = 43,560 / 1000. * 30 = Points required.. = 120 / 50 * 300 =
1307 pts.. 720 pts.
Total -Parking Spaces: No, of trees =120 / 32 (minor arterial or
25 for major arterial) = 4
50 spaces ~ 16 pts. each = 800
40 spaces. @ 12 pts. each = 480
Points required _ 1280 pts.
Landscape Points Required: 1307
Streetscape Points Required: 720
TOTAL POINTS REQUIRED: 2027
Proposed Landscaping
Plants
Caliper/Size Points/Plant Total Points
1 g° 300 300
O Post Oaks Quercus stellata
Unprotected Existin4 Canopy Trees , 35 35
1 2"
®Live Oaks Quercus virginia
2 3" 35 70
~ Water Oaks Quercus nigra
New'Canopy Trees (containerized)
g 2.5" 150 1350
O Cedar Elms U/mus crassifolia
Non-canopy Trees 320
g 5.5' 40
plc .Tree Crepe Myrtles Malus species
Shrubs 100
10 5 gal. 10
CIE Waxleaf Ligustr~um
Ligustrum japonica
Total Landscape Points Proposed
2175
O:IGROUPIDEVE SERV.EE1!-hDSCP.000
~-
~--
STAFF NOTES
Napa Auto Parts Store
Case #97-412
July 2, 1997
Ordinance Requirements:
Site Plan Related
a -~~
_~ Label all curbing. (Curbing must be placed along the perimeter of the parking lot.)
l/ Submit details on what the proposed pavers will look like. ~~ ~
t/ Verify that the two end islands along. the parking row closest to the building are the
minimum 180 square feet each.
Show where the warehouse and retail areas will be in the building. Customer access to the
warehouse area will be limited.
.l r ted~
~~ The proposed domestic and irrigation water meters must be located in a public utility
- easement or right-of--way. (The .City will size the meters based on the utility demand
information.)
Show the distance to the nearest fire hydrant to determine if access is .closer than 300' or
- if one will be required on site.
Fire lanes will be required along both driveways from the access easement since the
building is .more than 15' from the existing access drive. Show the fire lane designation on
the site plan.
~a~~
Comments/Concerns:
_ Modify the pavement detail for fire lanes to include 6" concrete and #4 bars @ 18" O.C..
Coordinate the electrical service requirements wi Electrical Operations Coordinator
Tony Michalsky at (409) 7b4-3660: ~~~,~- -- ~~ p~ UQP~c.~17~~
The developer is responsible for providing and placing one 4 conduit with pull st g
- from the outside building termination to the edge of the property. The conduit shall ell up
4' at the outside building termination and 6" at the property. Both .ends of conduit shall
be capped. The ternnation shall be within 20' of power; if not, the developer is
responsible. for providing and: placing a 8' x 5/8" copper ground. rod at the base of the
termination. Coordinate details with Laverne Akin at (409) 821-4723.
Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409)
- 776-0627.
a~~~~
-~ rEf-~-~~-~
,~'
PROJECT REVIEW COMMITTEE REPORT
July 10, 1997
TO: J. B. Goolsby
737 South Rosemary, Bryan, TX 77802
George Nedbalek
Route 5 Box 360A, Bryan, TX 77807
Greg Taggart, Municipal Development Group
203 Holleman Drive East, College Station, TX 77840
FROM: Project Review Committee:
Jane Kee, City Planner
Steve Homeyer, Assistant to the City E
Larry Lightfoot, P&Z Representative
Others Attending
Shirley Volk, Developme ator'
Natalie. Ruiz, Planning Technic'
Laverne Akin, GTE Representative
Tony Michalsky, Electrical Operations Coordinator
SZJBJECT: Parking Lot Plan -Napa Auto Parts; proposed auto parts facility to be located at
1520 F.M. 2818 on lot 2R, block 14C of Southwood Valley Section 19. (97-412)
A Project Review Committee (PRC) Meeting was held Wednesday, July 10, 1997 to discuss the
above mentioned parking lot plan. Commissioner Lightfoot moved to approve the site plan with
the following ordinance requirements and comments. (The following is a list. of ordinance
requirements and comments- identified by the PRC. This list does not relieve the applicant of total
compliance with all current ordinance. requirements..)
Ordinance Requirements:
Label all curbing. (Curbing must be placed along the perimeter of the parking lot.)
_ Submit details on what the proposed. pavers will look like.. (Color, texture, etc.)
Verify that the two end islands along the parking row closest to the building are the
minimum 180 square feet each.
_ Show where the warehouse and retail areas will be in the building. Customer access to the
warehouse area will be limited.
_ The proposed domestic and irrigation water meters must be located in a public utility
easement or right-of-way. (The City will size the meters based on the utility demand
information.).
Modify the pavement detail. for fire lanes to include 6" concrete and #4 bars @ 18" O.C.
PRC Report
Napa Auto Parts
Case #97-412
Page 2 of 2
Ordinance Requirements (cont.l:
Show the distance to the nearest fire hl aresea~chine the aicfcesslb'lity of the textsting fire
if one will be required on site. (Staff g
hydrant on the Post Office property.)
Fire lanes will be required along both driveways from the access easement since the
building is more than 15' from the existing access drive. Show the fire lane designation. on
the site plan.
Provide flume details on the section that crosses the sidewalk along the F.M. 2818
frontage.
Comments/Concerns:
_ The freestanding sign shown on the site plan must be permitted separately.
_ Coordinate the electrical service requirements, associated costs and utility easements with
Electrical Operations Coordinator Tony Michalsky at (409) 764-3660:
_ The developer is responsible for. providing and placing one 4" conduit with pull string
from the outside building termination to the F.M. 2818 right-of--way. The conduit shall ell
up 4' at the outside building. termination and 6" at the .right-of--way. Both ends of conduit
shall be capped. .The termination shall be within 20' of power; if not, the developer is
responsible for providing and placing a 8' x 5/8" copper ground rod at the base of the
termination. The conduit shall have no sharp bends. If the conduit has sharp bends, the
owner/developer is responsible for providing and placing pull boxes.. Coordinate details
with Laverne Akin at (409) 821-4723.
Coordinate gas service details with Lone Star Gas Rep. David borough at 776-0627.
Assistant to the City Engineer. Homeyer seconded .the.. motion to approve .the parking lot plan with
the above mentioned conditions which passed unopposed {3 - 0).
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED TO .CONTINUE WITH PHASE II OF THE BUILDING PERMIT
PROCESS. COORDINATE FUTURE SUBMITTALS AND/OR APPEALS WITH
DEVELOPMENT COORDINATOR SHIRLEY YOLK OR PLANNING TECHNICIAN
NATALIE THOMAS RUIZ AT (409) 764-3570.
APPEAL PROCESS:. An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions
imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of
the final site plan as approved by the PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a written explanation of those items being appealed. Until said copies
are on file, no further development approval shall. occur, and. no further action by the Commission
shall take. place. An applicant may appeal only certain aspects of site plan review, and in the
absence of .discretionary review by the Commission, or review pursuant. to a petition, all other
aspects of the site plan shall be final. Any' notice of appeal shall state with particularity the aspects
which are to be appealed.
From: Shirley Volk
To: Smccully~CJTY OF COLLEGE STATION.CITY HALL
Subject: Re: naps
I just talked to both Mr. Goolsby & Mr. Nedbelek. Mr. N. worked with Sabine to change the planand he
e wrote: I asked him to bring it in sometime. BUT at any rate, this is what I
has a copy of what sh
decided after hearing all the pertinent facts:
We will give them 300 points each for the existing trees, per the converation with SM. ,
We will only give them 150 points for each confainerized tree they had planted by the Greenery because
that's what they paid for. If they aren't that big, The Greenery will have to replace them.
They will get the 400 points for the shrubs planted.
That makes a total of 1750 they have planted and they need 2084 according to Muzzy's calculations.
~ They will make up the apx: 300 points.. I am releasing their financial guarantee based on a general and
rather widespread misunderstanding! ):
»> Sabine McCully 12/15/97 12:55PM »>
shirley, muzz went out and looked at the landscaping and. we can't release the .bond yet. looks like we
don't have enough points out there. if they start to argue with you, have them call me, not muzz. we
may need to work out a schedule for compliance and they may need to extend their bond (i don't know
when it expires)_
on the parking issue, please pass that info on to them and let them know that we are having code
enforcementlook at the entire area. papa people may not be the only ones parking on the grass in that
area - it may be sevcik and the bank as well. thanks!
CC: Jane Kee, Nanette Manhart, Natalie Ruiz