Loading...
HomeMy WebLinkAboutMinutes~- ~ ~~~. Ordinance Requirements: Site Plan Related STAFF PRC REPORT T~IWM Corporation Office Building Case #97-409. _ The relocation of the. driveway does not work for fire protection or sanitation vehicles. Staff recommends that the driveway be relocated as shown on the previous plan. Show the internal dimensions that were removed including driving aisle width, throat length, typical parking dimensions and the driveway width on Gemstone. ~NI~ASIIfzE F~cE-t -~~~ of c,~~~~p~mi T~e ~~}?~~~nunum radius for the driveway opening on Gemstone Drive is 15', not 5'. _ ~. ¢~NY ~i~EL~~TfI/t~U//1~'- - ~/~'~/ dY~lJ~7' ~r~3'E /~~I/~~~~~~~ o~ vu v a ua~ aacuzaavcslr fj .+=rj....~ I~~'?'aDvE ~ft~ G~ T Fi E ~i~~UM ~-lG tom- -t,~t ~ sue' f~ ~ ~ ~ _ Correct the "curb @ paving" and "curb @ sidewalk" details to current city standards and~T specify the pavement .details for the fire lane. (Non-fire lanes are S" thickness with #4's @ 18" centers and fire lanes are 6" thickness with #4's @ 18" centers.) _ Remove the note along Emerald Parkway concerning the "ambulatory ramp slope @ 1:20". ___-. Show all interior sidewalks including the one that connects the building to Emerald P kway. ~~ Landscape Plan Related _ Screen the parking area from Emerald Parkway through a 3 all berm, wall, landscaping or combination. i~'mDJ~ ua~J~cA r~ /Vow owl ~i~ r~c~./, G~--~]~/ F~ ~,(Jf{~9-T T"iZ~ES f}~~ f3E~nlf e~/~Ot/'.D. Comments/Concerns: _ Coordinate the electrical service .requirements and necessary easements. with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660: _ Coordinate telephone .service details with G.T.E. Representative Laverne Akin at (409) 3 821-4723. ® Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409) 776-0627. .~.~~ ~ ~j ~~>~ v ~~~ PROJECT REVIEW COMMITTEE REPORT May 15, 1997 TO: Chad Grauke, The Arkitex Studio, Inc. 511 University Drive East, Suite 201, College Station, TX 77840 MWM Corporation, JeffMcDowell 2114 Southwood Dnve, College Station,. TX 77845 FROM: Project Review Committ ' Jane Kee, City Pl er Kent Laza, CityEn ` e r Charles Smith; P&Z Re re entative Others Attending • Shirley Volk, Development Coordinator Laverne Akin, GTE Representative Tony Michalsky, Electrical Operations Coordinator SUBJECT: Parking Lot Plan - MWM Corporation Office Building; proposed office building to be located on lot 3, .block 1 of Emerald Park Plaza. subdivision on the .northeast .corner of Gemstone and Emerald Parkway. (97-409) A Project Review Committee (PRC) Meeting was held Wednesday, May 14, 1997 to discuss the above mentioned parking lot plan. City Engmeer Laza moved Yo approve the site plan with the following. ordinance requirements and: comments. (The follovv~ng is a list of ordinance requirements and comments,identified by the PRC. This list does not relieve the applicant of total compliance with all current ordinance requirements.) Ordinance Requirements:. / Site .Plan Related u~ The relocation' of the driveway does not work for fire protection or sanitation vehicles. Staff recommends that the driveway be relocated as shown on the previous plffan. ~~ Show the internal dimensions that were removed including driving aisleYwidth, th~'oat length, typical p 'rig :dimensions and the way width on Gemstone. (Measure face- to-face of curb, 20' .minimum.) Remove the reference to the fine from the handicap parking sign per A1~TSI standards. C~ Any freestanding sign must be permitted separately and meet all current ordinance requirements. 77 Correct the "curb..@ paving" and `curb @ sidewal "details to current city st ndards and specify the pavement details for the re e. '' on-fire lanes are 5" t'with #4's @ 18" centers and fire Ganes are 6" thickness with. 's 18" centers.) PRC Report ' 117GI'M Corp Building Case #97-409 Page 2 of 3 Ordinance Requirements cont.l: Site Plan Related Remove the note .along Emerald Parkway concerning the "ambulatory ramp slope @ 1:20". Show all interior sidewalks including the one that connects the building to Emerald Parkway. p~ What is the dark square located in front of the building? ~ottm Landscape Plan Related ~_ Screen the parking area from Emerald Parkway through a 3 foot tall berm, wall, landscaping or combination. ~~ Remove the landscape note on the site plan. Clarify what trees are being removed. Comments/Concerns: _ Provide a temporary blanket easement for the site for utility installation. Complete and return the attached easement information sheet and service request form. Coordinate the electrical service requirements and necessary easements with Electrical Operations Coordinator Tony: Michalsky at (409) 764-3660: Place two 4" conduits from the outside building termination to the utility easement along Emerald Parkway. The conduit shall. ell up 4' at the outside building location and 6" at the easement. The conduit shall have pull string and be capped. Termination must be within 20' of power; if not, a 8' x 5/8" copper ground rod must be provided and placed by the developer. .:Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. _ The building. will be served by an existing 3" poly gas main stub dividing-lots 3 and 6. The gas service line will be brought to the northwest corner of the site. Show this service route and meter location on the site plan. Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409) 776-0627. P&Z Representative Smith seconded the motion to approve the parking lot plan with the above mentioned conditions which passed unopposed (3 - 0). SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN. ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS AND/OR APPEALS WITH DEVELOPMENT COORDINATOR SHIRLEY VOLK OR PLANNING TECHNICIAN NATA,LIE THOMAS RUIZ AT (409) 764-3570. PRC Report A~IWM Corp Building Case #97-409 Page 2 of 3 APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning. Commission. within five days after the PRC Committee meeting. Failure to appeal the. PRC. action shall constitute a contractual acceptance of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state. or federal law.. An applicant .appealing the :decision ofthe PRC .shall file ten copies of the final site plan as approved by the PRC, showing: all changes and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed. Until said copies are on file, no fi rther development approval shall occur, and no further action by the Commission shall take place. An applicant may appeal. only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice. of appeal shall state with particularity the aspects which are to be appealed.