PROJECT REVIEW COMMITTEE REPORT
Apri128, 1997
TO: Deborah Keating, Urban Design Group
P. O. Box 10153,. college Station, Texas 77842
Thomas Kirkland, Spirit Development
5949 Sherry Lane, Suite 1700, Dallas, Texas 75225
T. W. Mohle, 3+ Partners
24 Greenway Plaza, Suite 9~5, Houston,: TX 77046
FROM: Project Review Commi
Jane.Kee, CityPl 'er
Steve Homeyer, Assis ant to the City Engineer
James Massey, P&Z a esentative
Others Attending
Natalie Ruiz, Planning Technician
Tony Michalsky, Electrical Operations Coordinator
Laverne Akin, GTE Representative
Shirley. Volk, Development Coordinator
Graduate Civil Engineer, Paul Kasper
David Durough, Long. Star Gas Representative
SUBJECT: Parking Lot Plan -Quality Suites Hotel; proposed .hotel facility to be located
along the south side of University Drive in .front of Cedar Creek Condominiums,
lot 3 of the. One Lincoln' Place. Subdivision totaling 2.88- acres. (97-406)
A Project Review Committee meeting was held Wednesday, April 23, 1997 to discuss the above
mentioned parking lot plan. Commissioner Massey moved to approve the site plan .with the
following ordinance requirements and comments. The following is a list of ordinance
requirements and comments identified by the Project Review Committee. This list does not
relieve the applicant of total compliance .with all current ordinance requirements.
Ordinance. Requirements:
Site Plan Related
_ Provide adequate screening of the parking area that is parallel to University Drive within
the Overlay. District. The screening should be at least 3' tall and consist of a berm, wall,
plant material or a combination of the three.
_ There is a portion of .the building. that is unprotected given the location of the fire
hydrants. All portions of he building :must be within 3:00' of a hydrant, as the hose lays.
_ Show the building setbacks on all sides.
Show the proposed phasing of .the property and area calculations for landscaping
requirements.
R
PRC Report
.Quality Suites Hotel
Case #97--406
Page 2 of 3
Ordinance Requirements (cont.)
Site Plan Related
_ The proposed driveway location along University Drive is acceptable with a raised median
and pavement markings to clearly distinguish the "right in/rght out" movement. Make
sure that grading in this area does not interfere with the existing inlet to the east. (There is
also a curb that is discontinued in this location. Show how the driveway entrance will
connect to the 21' wide pavement section.. The driveway. entrance may be reduced to 24'
in width.)
_ The proposed fire hydrant mustbe located in a publiautility easement.
_ Show the fire lane markings along the curbs located within the fire lane.
_ The proposed gates along the rear of the building must have a knox box for emergency
vehicle access. Show the location of the box.
_ The dumpster .pad must be slanted towards the access drive for accessibility. The
screening. fence around the dumpster must be 8' in height. There should be an end island
between the dumpster and parking spaces.
_ Show the fire department connection.
_ In the parking legend, show how the number of parking spaces were calculated.
_ Provide the. irrigation demands. for each meter.
Landscape Plan Related
Specify the caliper size on .the canopy trees: (100 points is claimed for each tree;
however, the point value is based on the caliper. size.)
Correct the legend to reflect the points required per space: "50 @ 16 pts. per space ° 800
points + S lb points = 13116 total points per space. The total number of points per site area
could change based on the location of the phase line.
Staff will return the redlined grading & drainage sheet and the details sheet at the PRC
meeting.
Comments/Concerns:
_ Coordinate the electrical. service .requirements and necessary easements with Electrical
Operations Coordinator Tony Michalsky at (409)764-3660:
Coordinate,telephone service details with G.T.E. Rep. Laverne Akin at (409) 821-4723.
Coordinate gas service details with L. S. G. Rep. Don Fazzino at (409) 776-0627.
Assistant to the City Engineer Homeyer seconded the motion to approve the site plan with the
above mentioned conditions which passed unopposed (3 - 0).
PRC Report
Quality Suites Hotel
Case #97--406
Page 3 of 3
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED TO CONTINUE WITH "PHASE II OF THE BUII,DING PERMIT
PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT
COORDINATOR SHIRLEY VOLK OR PLANNING TECHNICIAN NATALIE THOMAS
RUIZ AT (409) 764-3:570.
APPEAL PROCESS: An applicant may appeal the. decision of the Project Review Committee
to the Planning and Zoning Commission within. five days after the PRC Committee meeting.
Failure to appear. the PRC action shall constitute a contractual acceptance of all conditions
imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law.. An applicant appealing the decision of the PRC shall file ten copies of
the final site plan as approved by the PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a wntten explanation of those items being appealed. Until said copies
are on file,. no further development approval shall occur, and- no further action by the Commission
shall take place.. An applicant may appeal only. certain aspects of site plan review, and in the
absence of discretionary review by the Commission, or review pursuant to a petition, all other
aspects of the site,plan shall be final. Any notice of appeal shall state with particularity the aspects
which are to be .appealed. Coordinate appeal process through Development Coordinator Shirley
Volk at {409) 764-3741.
.. ~
~ ~~~~~c,;~--~ i C~-r-~--STAFF PRC REPORT
~~~ ~ ~(
Quality Suites Hotel -~
~. -~ ~~~
_ ~ Case #97-406 , ~~,._~-;~
.. (~
1-
,.
e
,:
~, Ordinance Requirements. ~ ~ ~;.~ `._-~'- _~ -~~~!
e ~ ~ ~_C~~l t,
Sate Plan Related "~ ~~~~ ~ ~-~-', ~~-- ~`'~.. ~` ~~~-~_ ,
`I `' ~ ~%T~ ~_
Show the building. setbacks on all sides. (k~ ~„ ~ ~G" ~ ~_~ ~ ~`~`~ _ F
~ / ,i,~ _ ~ ~ ~ C.E~ ~-~L , .
~!' Show .the proposed phasing of the property and area calculations for Iandscapiilg
j requirements.
The proposed fire hydrant must be located in a public utility easement.
l~ Show the fire lane markings along the curbs located within the fire lane.
The proposed gates along the rear of the building must have a knox box.. for emergency
vehicle access. ~ ~ ~{--,,~~n, ~.~ ~-,,.- G'~~.~,~'~ ~~N ~~`~~` • (j ~~
The dumpster pad must be slanted towards the. access drive for accessibility. The
screening fence around the dumpster must be 8' in height.
Show the fire department connection.
;/~ In thee... parking legend, show how the number of parking spaces were calculated.
,Prq, ' e the imgation demands for each meter.
~~~ R ted
Specify the caliper size on the canopy trees. (100 points is claimed for each .tree;
however, the point value is based on the caliper size.)
Correct the legend to reflect the points. required per space: "50 @ 16 pts. per space = 800
points + 51.6 points = 1316 total points per space. The total number of points per site area
could' change based on the location of the phase line.
Staff will return the redlined grading & drainage sheet and the details sheet at the PRC
meeting.
Comments/Concerns: ~~-- c,-:~f' ~i~-~~~`~~
Coordinate the electrical service requirements and necessary easements with Electrical
Operations Coordinator Tony Michalsky at (409) 764-3660.
Coordinate telephone service details with G.T.E. Rep. Laverne Akin at (409) 821-4723.
Coordinate gas service details with L. S: G. Rep. at (409) 776-0627.
The proposed driveway location along University Drive is acceptable with a raised median
and pavement. markings to clearly distinguish the "right in/right out" movement. Make
sure that grading in this area does not interfere with the existing inlet to the east. (There is
also a curb !that is discontinued in this location. Show how the driveway entrance will
_ ~ ~~.r
connect to the 21' wide pavement section.) " ~~~~_~ ~`sy ~, ~', '