From: Veronica Morgan
70: Jim Callaway,. Paul Kaspar
date: 5/12/98 4:09PM
Subject: Fwd: TxDIGITAL Galindo plans
fyi -this is from our conversation with Chris about deleting the storm sewer in the street and instead use
"diverter swales" to keep the stormwater from getting to the street so it can function per our ordinance.
looks like mr. bowers cant get the easements necessary to construct these channels. if they dont get us
those easements and construction drawings the street will need to be constructed as originally designed
with the storm sewer.
just fyi....dont issue any permits until this issue is cleared up. thanks
CC: Natalie Ruiz, Shirley Volk
~~
'. GALI'ND 4 EN~.IN~L~R,S ~tND ~F.~411111T,L~1~S
3833 South Texas Ave'., Sutte 213 Bryan, Texas 77802 :(409) 846-8868
L (O ~~
June 3, 1888 oC
Ma Jim Callaway, D[ractor ~~
T Development Services
City of College Station
1101 Texas, Ave.
College Station. TX 77840 ~~' ,
Subject: •~ Addendum to Revised Drainage Report d fed April 6, 1898
Technology Parkway.. Stormwater Runo
Technology Business Park. 'Phase 1
College Station, TX
Dear Jirrr
following the'meeting held in your. office yesterday i to submit for your review and approval the foliowing
changes to the referenced report.
1. Construct berms on either side of Yechnology Parkway Instead of the originally proposed channels.
:These berms wilt prevent ad joining areas runoff water from. reaching the road. They are designed to
handle a 1 t>D-yr rain.
2. Construct relieve channels on behind the curb on either side of Technology Parkway. These channels
- witl collect runoff from upstream road surface through at least one 4'-wide curb cut on both sides of -the
;road as defined to the origins! report.
tJ0 ,~}~,,,_
~. _~._"_
cross~sectton of the road surface and, para~el channels and berms is given beiow.
`~~O c~. s~o~t~r, t~~O J-~~-
ANNS'L ~ ~ tJ~t~_ ~ n ®C.~'J~Q .
I~2.0~ ESFRM . RDaD ~_~~~ Z.O~
__.g.Q._^~: ~O~ 1~.0~ f 25.D~ .
i
Sincerely,
~/f.LINDO ENGINEERS AND PLriNNERS, INC.
.~
`a
-'~ ~~~ ~~ . P.E. # 53425, R.P.t.S # 4473.
-' C rlsttan A. Galindo,
President
cc. Robert t' Bower, Jt, Ph.D., P.Ee
W: C. Scatmardo Architect
0~~~~ .~
TATION
OLLEGE S
C
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
May 6, 1999.
C.F. Jordan Construction
Attn: Paul Harris
Via Fax (409) 696-0601
Ize: Water meter at 40S Technology Parkway, .Texas Digital.
Dear Paul,
Per our telephone conversation today, the .original 3" water meter that you purchased in July of
1998 for 405 Technology Parkway may be reduced to a 2" water meter per the revised demands
provided by Bi11 Scarnmardo. As we discussed, we'will forward a work orderto our Water/Waste
Water Division to install the 2" tap`prior to receiving the $200 fee. 'Please submit the additional
$200 tap fee no later-than Monday, May 10, 1999.
If you have any questions or need additional :information, please contact me at (409) 764-3570
Sincerely,
Development Coordinator
Cc: Lance Simms, Building Official
Home of Texas A&M University
Sent by:WC 450e
Jan-06-98 04:18am from 82„2_740 3625409 764 3496] Pa4e 1~ 2
_, ~ r ~;
t~ .C. Scarmardo
~~ ~.~a architects ^ interiors
F ~~~~~ ~~E~'
D,AT.F,c May ~,199~ 1`I3U1,P: 1:04 PM
TO: City of College Station FROM: vVCS architects
Attn: Veronica lvlcargan Bill Scarmardo
PHONE: PHONE: (409) 776 6373
I'AX: 364-3496 >'AX: (409) '774-4616
RE: T)~.XAS DIGITAL SYSTEMS INC,.
STZING 1~7ATER NITER
Number of Pales IncXuding Cover Sheet: Z
Comments:
Veronica,
See attached information from Area Wide Mechartieal, Inc.
Based on the mc~difiCati01?s that the plumber made ixc the f~~1d, this is the zet~iscd ~a~p
required.
~-
o- ~ ~ ~
VI~1~Ild1?? C. SG~2ardc~. ~tTA, ~ ~~~~~ti
If you had trouble z~eceiving this t:ix, or did not receive the nutnl~er. of pages indicated, please
call and let us know.
Sent by:WC 450e
m
Jan.-06-98 04:19am from
82 2 740 3625409 764 3496
Page 2i 2
Received Jan-06-9$ 02.16Sm from 409 693 6436 -~ WG ~150C Page 2
_ ~R~-CJ-~~~8 ~~D 11'04 R{~ RRER WIDE E~ECHR]~ICRL rA~ ~d0. aog 89~ 6~3~ F. ~?
170 p£31*iDE=ROSA Phony. ~4D9) 754-7648
CC~LL~Gf ~Tfi.±'1~23~., ~~ '?~~~ ~a~' (~Ci~j ~~s-~3c
TA~I,A9Q3~
~ i4ill•Y 1~'~3
Tv, Gyt~ of Coilagc $~atien,
~ra;n: Aim Ac~nson
Pts,~bin~ Diui~tbt4
Aran ~Vidc Mech~niC~l
LiCCti~4C ~# i~t-! 7~G)
Rn~ ~irtn~'iVetgs M~toifor T~rt6l3igitat Systasms
~3s~d vn 3~v ~ti~~ oC flush-valve l t4il~t~ ~~ this ~yst~m ~d ~ field ~di~tme~!t~ ~.~9ck to curry cwt
such. r~wi~i6llffi, I do trot believe t3~ ~ 1LLi12" meter re~ontly ~ra~userf wit satisi~ thc~ dcrnanst that ~ ~~°~
calculated.
adQed ~ d~~ mast rail altti~~~-~ht dr~~~.y fa1at frain Eh~ nit rg. 'I'h4 y td liot~a~e 2 h ~er~
3`itiia detttur7d 4e G~~ to appraxim$t~ly ane•k~undr~l~ve €1a5.~ j Q.~,M.
I St[Ongly lCCbn~st~insu ~~ ~~$ ~•~f`J 4ii~eiLi FCtiv'"%~°. ~3i~ a6r~~i~1:3l3.
~,CB~ llyt
~~p~'..~tiw-..
~O~.Tt g9i' ~~1tlt~y) 1~tlQllSL~fl
.::~
.~
FILE NOTE
1998
ON FRIDAY, MAY 1, WE RECEIVED A COMPLAINT FROM A MR CHARLES KNIKER, OWNER
OF LOT 13 ON BROOKWATER, WHICH IMI~~DIATELY BACKS UP TO THE TDS PROPERTY.
HE SAID THAT THE TDS OWNERS WERE ERECTING A SECOND BARBED WIRE FENCE, THUS
CREATING A 40'-50' STRIP. THE WORKMEN INFORMED MR KNIKER THAT THE INTENT
WAS TO RUN CATTLE ON THIS AREA. MR. KNIKER QUESTIONED WHETHER THE CITY
WOULD ALLOW SUCH ACTIVITY, TAKING INTO CONSIDERATION THAT THE AREA WAS
DESIGNATED AS A BUFFER AS AGREED TO IN THE ORIGINAL REZONING TO M-1 WITH
DEED RESTRICTIONS AND THEN'.REQUIRED BY THE FINAL R&D ZONING THAT REPLACED
THE M-1 ON THE TDS PROPERTY.
WE RESEARCHED BOTH REZONING FILES, THE PRELIIvIINARY AND FINAL PLAT FII.ES, THE
SITE PLAN FII,E, AND THE R&D BUFFER RESTRICTIONS. LEE WENT OUT TO LOOK AT THE
AREA, AND JANE SPOKE WITH BOB BOWERS. BOWERS TOLD JANE THAT THE AREA HAD
ALWAYS HAD SOME CATTLE ON IT, AND THAT HE HAS PROVIDED A PASSAGE BETWEEN
TWO PASTURES FOR 4-6 COWS TO ACCESS. HE ADDED THAT THE INTENTION IS STII.L TO
MAKE THE LOTS THAT MAKE UP THE BUFFER ZONE AVAILABLE FOR SALE TO THE
ADJACENT PROPERTY OWNERS IN ,THE FUTURE, AND THAT THE PASSAGE AREA IS
TEMPORARY.
WE HAVE MADE THE FOLLOWING FINDINGS:
1. THE WRITTEN REFERENCES TO THE BUFFER AREA IN THE FILES STATE THAT
THE AREA IS TO BE MAINTAINED IN ITS "NATURAL" STATE AND THAT THE LOTS
IlVIlv1EDIATELY ADJACENT TO THE R-1 AREA ARE TO CONSTITUTE THE BUFFER
2. THE R&D RESTRICTS 'ACTIVITIES WITHIN A BUFFER AREA TO PASSIVE
RECREATION, INCLUDING EQUESTRIAN TRAILS. FROM A LAND USE STANDPOINT,
PROVII;ING A PASSAGE FOR CATTLE IS SIIvIILAR TO EQUESTRIAN TRAIL.
PROVIDED THAT THE ANIMAL DENSITY REMAINS LOW.
3. JANE AND I WERE INVOLVED IN ALL OF THE MEETINGS THAT TOOK PLACE
BETWEEN BOWERS AND THE NEIGHBORHOOD GROUPS. OUR RECOLLECTION IS
THAT THE .BUFFER AREA ' WAS TO REMAIN NATURAL, IlvIPLYING THAT NO
ADDITIONAL PLANTINGS Olt IRRIGATION WOULD BE REQUIRED. IN EXCHANGE
i
FOR RELIEF FROM THE ADDITIONAL COST OF PLANTINGS AND IRRIGATION,
BOWERS AGREED TO A LARGER BUFFER AREA THAN WOULD BE REQUIRED
UNDER R&D REQUIltEMENTS. BOWERS ESSENTIALLY AGREED TO SUPPLYING 4.1
ACRES RATHER THAN THE 1.4 ACRES THAT WOULD HAVE BEEN THE r~III~TIMUM
REQUIRED UNDER THE MA~QMUM R&D BUFFER STRII'.
THEREFORE, STAFF HAS REACHED THE FOLLOWING CONCLUSION:
BOWERS IS PERMITTED TO RUNA REASONABLEAMOUNT OF CATTLE THROUGH THE
BUFFER AREA AS LONG AS THE PROPERTY REMAINS UNDER HIS OWNERSHIP AND
WITH THE CONDITION THAT A SUBSTANTIAL AMOUNT OF THE NATURAL VEGETATION
REMAINSINTACT.
;Shirley Volk - Re Texas Digital Systems., ._ Page.1.
From: Paul Kaspar
To: SVOLKLCity of College Station.City Hall
Date: 2/1.7/98 8:56AM
Subject: Re: Texas Digital Systems
I think we can review this via .redlines. The concept is the. same, they apparently have changed their
mind regarding building locations and phasing.. 1 am handling this as a first review for engineering since:
1. We do not have any engineering redlines except for the PRC comments.
2. There have been enough changes (details and site layout) that we just can not review from redlines.
»> Shirley Volk 02/17/98 08:48AM »>
Do you think there are enough changes that we need to do like a staff PRC again, or can the review be
simply handled thru making additional redlines and requiring additional revisions„if necessary?
»> Paul Kaspar 02/16/98 05:23PM »>
I started to take a look at them and they have redesigned the site a bit. What used to be phase II is now
part of this phase.:and they have omitted the building: at the end of the street where the flagpole is
proposed. Some. of the redlines we made. still apply, but others will not.
»> Shirley Volk-02!16/98 11:03AM »>
Last week construction documents came in for the Texas. Digital Systems project. They are in the plans
check room. These. plans include-the site plan revisions. Please check these plans so I can return them
to the architectural firm. I have placed the-planning. case file in the plans check room foryour use while
reviewing these: plans. I know we are running .late on checking these plans, and I will call Bill Scarmardo
and explain since today is actually the 5th day we've had #hem.
CC: Jim Callaway,. Natalie. Ruiz,. Sabine McCully,. Ver...
age
;.Shirley Volk -.Re Texas Digital Systems .::....:.::...r.
From: Shirley Volk
To: Karl Goldapp, SVOLK@CITY OF COLLEGE STATION,CITY ...
Subject: Re: Texas Digital Systems
Karl, I just talked. to Bill Scarmardo who is the architect for this project, and he says that Texas. Digital
Systems will not be manufacturing boards at this facility so there will be no acid wash at this operation.
They buy the manufactured boards from somewhere else. They will be soldering on the .boards here,
and they have a shakedown room, but none of this waste will be going into the sewer system. He says
the only things going into the wastewater system will be from the bathrooms and then the stormwater
system wilF handle the runoff.
»> Shirley Volk 02/18/98 08:27AM »>
Karl, thanks for the heads-up on this. I have checked with both engineering and building, and have
determined that under the plumbing code (building) we have the ordinance authority to require whatever
is necessary. I will contact the architect and ask the questions. you asked. me. I will put a copy of your
e-mail in the other computer case file to help me remember to ask them that question, too, but you'll
need to help me remember! Thanks again.
»> Kari Goldapp 02/17/98 D7:41 AM »>
Shiny,
I was wondering if Texas Digital Systems has a voiced how they wilt be handling their wash material that
they. wash their boards with? Will they recycle a separate "none water" liquid to wash the boards or will
they be directly disposing of all waters down the drain?
I need to ask the same question of the other computer company coming into town.
Thanks,
Karl
»> Shirley Volk 02/16/98 11:03AM »>
Last week construction documents came in for the. Texas. Digital Systems project. They are in the plans
check room. These plans include the site. plan revisions. Please check these plans-so I can return them
to the architectural firm. I have placed the plannngcase file in the plans check room for your use while
reviewing these. plans.: L know we are running late on checking these plans,_and I wil}call $ill Scarmardo
and explain since today is actually he 5th day we've had them.
Volk - Re: Texas Digital Systems
~v~~M,
From: Shiriey Volk
To: Karl Goldapp, SVOLK dLiCITY OF COLLEGE STATION.CITY ...
Subject: Re: Texas Digital Systems
Karl,. I just talked to Bill Scarmardo who is the architect for this project, and he says that Texas Digital
Systems will not be manufacturing boards at this facility so there will fie no acid wash at this operation.
They buy the manufactured boards from somewhere else. They will be soldering on the boards here,
and they have a shakedown room, but none of this waste will be going into the sewer system. He says
the only things going into the wastewater system will be from the bathrooms and then the stormwater
system wih handle the runoff.
»> Shirley Volk 02/18/98 08:27AM »>
Kari, thanks for the heads-up on this.. I have checked with both engineering and building, and have
determined that under the plumbing code (building) we have the ordinance authority to require whatever
is necessary. I will contact the architect and ask the questions you asked me. I will put a copy of your
e-mail in the other computer case file to help me remember to ask them that question, too, but you'll
need to help me remember! Thanks again.
»> Kari Goldapp 02/17/98 07:41AM »>
Shirty,
I was wondering if Texas Digital Systems has a voiced how they will be handling their wash material that
they wash their boards with? III they recycle a separate "none water" liquid to wash the boards or will
they be directly disposing of all waters down the drain?
I need to ask the same question of the other computer company coming into town.
Thanks,
Karl
»> Shirley Votk 02/16/98 11:03AM »>
last week construction documents came in for the Texas Digi#al Systems project. They are in the plans
check room. These plans include the site plan revisions. Please check these. plans so I can return them
to the architectural firm. I have placed the planning case file in the plans check room for your use while
reviewing these plans. I know we are running late on checking these plans, and I will call Bill Scarmardo
and explain since today is actually the 5th day we've had them.
'~.,
~~
;~
-~~ -~
~c~ S~~e ~a115c~~r~~c~c
~;- i~n~ m I~b~c~ C.
l~~ S~ n 1'~l~es
~~
~-~~~
~ ~ _~
..
~_
~a~
.J
~-` .~---
~~ ~~~~ c~ ~~~ ~~ ~ ~ ~~~ ~~~ e
~~
n
i ~ ~ ~^~ ~ r ~ -% -- I ~~ - t
x
~ ~ ~ \~
_~~ iii
~~
Ii
i
~ ~~
~-~,~ (~
• ~.
.~.
-,
~~
~L~~~
~~,I ~ _g
.._~i~.-~`~ ~ rte--, C1 CSC ~~-~~ ~'G~ _
~ __G ~
~~v~Q ~ ~-
._
.y
~1~.<
~:~
..
~~~ ~~z~
~ ~
~-
~_
~`~ ~~ ~ ~
!,
~,
i
~~
FROM WCS architects FR?C NO 409 774 4616
«. _._ '
~[._...:.....J~~~
~~~~~'~:~.~'f ~ 1~C 5
APR 30,1997 01=44 PM P 1
FqX CQVER SHEET
L)ATt;; llpril 3U, 19.j7 '1'LME:
'rp; t'FI'Y Ur' C:C?LLEt~E STATION FRONT:
Atin: NA'L`ALIE
PHONE: PHONE
F'AX: 764-3406. FAX:
~};; TEXAS DIGITAL. SYSTEMS
cc:
Number of Pages Including C:ovcr Sheet: 2
2:4 Ei PM
WCS architects
Uanicl McGuire
(4(19) 776 6373
(409) 774-4616
Comments:
HERE !S TIiF INFORMATTON YOU ltli(~Ut:S't't;i1. THIS SitFF,T IS'1'YFICAL FOR AI,,1,'I'HKEE
BEIILI?1NGS.
if you had trouble receiving this fay, or dici not receive the n.urntx:r Uf pa~c~ i.ndica.teci, please
call ~~nd !ct u9 lrnaw,
J ..
O
c,~
V
i
n ~
r
~~
~_ TTa~~
~~K
3 ~
S
u ~~
d~
6
1
r
ft
m
l1J
'~
F
~ .~
~.
;~
.~. wow .~~. ~....1}'J
•U
From: Shirley Volk
To: JSCHWARTZ@CITY OF COLLEGE STATION.CITY HALL,
Date: 2/6/98 2:13pm
Subject: Re: Ledbetter easement
I will be out of the office until February 11, 1.998.. Should you
need immediate assistance please contact Natalie Ruiz. Thank
you.
»> JSCHWARTZ 02/06/98 14:11 »>
I received the executed easement from Letbetter in the mail
today.
»> Shirley Volk 02/02/98 01:09PM »>
I had a call from Bill Scarmardo this a.m. telling me that he has
made contact with the Ledbetters, and they tell him that they
have returned the signed easement to the city. I don't know who
to or when, so thought I'd send this to everyone who might have
anything to do with it to see if the easement is sitting on
someone's desk somewhere!- Since I have not been involved in this
for a long time I'm not real sure. what it's for, :but I think it's
an easement to cover an off-site extension of either a drainage
system or a sewer system (I think really it's sewer) for thee.
Texas Digital System development along the east side of the BP,
south of Sebesta Road. Mark, I think Kent worked on this, so I
included you in this memo.
Please look to see if .you have the easement, and if so, let me
know,. but get the easement to either Jan or Lisa in Legal asap.
Thanks.
y~~g4vr*~, tta' ~v°;,
c
~n.~ ~ y o dad ~'~d
/O~~
J. _ _ . _._•._
-~ -
Shirley,Uolk-.Fwd TxDIGITAL Galindo plans ..:........... .....:............:~--- -------.:.:............---... ... ..... - - ........r~z
_. __-- -
_ _ ~ From: Veronica Morgan -
To: Jim Callaway, Paul Kaspar
.Date: 5/12198 409PM I
Subject: `Fwd: TxDIGITAL Galindo plans
fyi -this is from :our co;iversation with Chris about deleting the storm sewer in the street and .instead+use
"diverter swales"-to keep the stormwater from. getting to the street so if can function per our ordinance.
looks like mr. bowers cant get the easements necessary to constructthese channels. if they dont get us
those easements and construction drawings the street will need to be constructed as originally designed
with the storm sewer.
just fyi....dont issue any permits until this issue is cleared up. thanks
CC: Natalie Ruiz, Shirley Volk
CERTIFICATE OF OCCUPANCY CHECKLIST
Project :Name:
~ ~,
Address:. ~~`~ _ _~
Electrical: (Tony X-3438) ~'~ ~--pe„~, ~ ~,~,®~~-~- J
Engineering: (Mark X-3690, Jerry 777-4594, Vern 777-0292, John 229-5873)
Development Engineering: (Veronica X-3763, Jeff 3756)
Fire; (Jon X-.3781., Raymond X-3709)
a : an X-3546
Leg. 1 U ) ~
Planning: ESabne X-3782, Lee X-374$, Jane 3757)
Sanitation: (Jirn, Wally, or Freddie X-3690)
Conditions of C.O.;
Date Project Manager