f=irst of all ,thank you for your consideration on this project .Hopefully ,you will find our numbers
satisfactory .
After a review of your concept drawings we suggest the following figures be included in your
budget
Site Work (Based on 12,000 SF of Concrete Paving.) $ 24,000,00
Buildings $ 450,000.00
Total Construction Cost 5 474,D00.00
These numbers must be considered preliminary at this point . In order to finalize these figures we
will require the following information
Soils Report
City of College Station Zoning Requirements
Please also understand that the present design is an expensive one . A significant savings could
be experienced by a total redesign of the building and sitework (the building and parking covers
too much site for the actual requirements) . A design that centralizes parking and consolidates all
of the structures under one roof would be the most economical .
Ralph and I both. have concerns about the'`Buidability" of the present design . If we choose to
stay with the present design , we should , at least ,have Ralph Benson "re -engineer" the
structures (the city will require an engineers seal - Mr, Baca's title block does not make refer+?nce
to Architectural or Engineeringcapabilities } . This service will incur more cost .but may be
required ,
Thanks again for your consideration and I hope that we may be of further service .
_ i
._. B . AIA,~
The Coltzer Company ,Inc.
P.O1
`Shirley Volk Re' Shadowrock Pet Resort ----- - - ~ - -~ ~~~ ~~-----~~~~---Pag..~-~~~~
From: Sabine McCully
To: SVOLK~CITY OF COLLEGE STATION:CITY HALL
Date: 3/4/98 4:13PM
Subject: Re: Shadowrock Pet Resort
just got off the phone with her regarding the streetscape along mortier. told her the following:
1. it's ok to switch out tree yaupons and Bradford pear along mortier as long as she turns in an "as built'
plan.
2. from her description, her property line runs closer to mortier than the typical 10'-12' off of the paved
section. it sounds to me then that she has the room to put the streetscaping outside the wood fence and
still be on her property. for the time being,. then, it looks as though no pip will be needed. i told her if it
turns out the fence and streetscape will be within the r.o.w., she can always go through the pip process.
»> Shirley Volk 03/04/98 01:39PM »>
Patricia Rogers came. in this a.m. to tell me they HOPE to be going for a C.O. on Monday, March 9th. I
told her about what we had agreed to regarding landscaping.
Are you ready to issue a C.O.?
Jan, as I recall, Tony M. and Tony H. both said we don't need an easement on this site.
Tony, did you get your 20%?
Pag
:'Shirley Volk -. Re Shadowrock Pet Resort ..._........,...,.,.. .......:::...................: ....
From: Shirley Volk
To: JKEE~CITY OF COLLEGE STATION.CITY HALL
Subject: Re: Shadowrock Pet Resort
Right.. She said she would have not only all the materials on the site, but would give us a detailed paid
invoice for it so we would know she had actually bought it! She said she would like a Z week conditional
c.o., and l said I would rather make it a 4 week conditional c.o. to be sure should would have ample time
to get everything done and we wouldn't have to figure out something again. She was appreciative. Let's
see if she goes. back to the mayor and cm to say "good" things now!
»> Jane Kee 03/05/98 09:59AM »>
What we agreed to is to bond whatever materials are NOT on the site, right??
»> Shirley Volk 03/04/98 01s39PM »>
Patricia Rogers came in this a.m. to telF me they HOPE to be going for a C.O. on Monday, March 9th. I
told her about what we had agreed to regarding_landscaping.
Are you ready to issue a C.O.?
Jan, as I recall, Tony M. and Tony H. both said we don't need an .easement on this site.
Tony, did you get your 20%?
~_ TTY OF O'DLLE~E STATION
i if~i TEXAS: AVENUE S.
COLLEGE STATiC4N, TX 778~D -
C'0ND'IT10NA.L
r: E~ T I F I C: A T E O F O C: C: U F A N C: Y
OWNER'S NAME: -PATRIt~IA PDGERS/IYl]NNA WIhISLDW
ADDRESS: FM .~1',~~, 13~~~ i='ERMIT #: S7C~.~37~
I'f?OJErT: SHADaW ~Q~ :F._ SET F~E~QF:T _
LOT: 1 T3Lfl',~`F::: 1 SU1iI) T t1 I S I ON :EDELWEISS TAUS I NESS. C:ENTE
I HAVE EXAM I NETT THE OFF' I C: I AL ZDN I NG MAF OF THE. ~: I TY DF -1OLLESE STATION
AND DD 1-fEF.'EE~Y ~1Et~T I FY THAT THE AE~DVE DESt~-~: I T~EI) LA1~11) h'IAY I3E aE~C:UF' I ~I) 111
AG't=:DF DANA= E WITH THE P•.E~.aULAT S CIhIS FDA: ZON I N~~ D I STF' I C:T _ _ AS F'EF:
^F:D I NAN~~ E NO. 1 E38 SUE~JEGT TD ,THE FCILLDW i NG UA1*' I ANC:ES`, _EX r~:EF'T I ONS CIF:
SF'EiwIAL REC!UIF'EMENTS AS FDLLDW~: See-condi`ti`.ans listed below,.
/ ., ~ .,
/L~`
DATE ~:ZOhIING n~ ,_ AL:>
,_,,..
I HEREIjY C:ERI' I FY THAT: THIS T3UI LD I fitG HAS . BEEN I NSF'EC:TET) AND THAT I T
rAN T3E tJSEI3 AS f3F<DUF I~ - BLS I NESS GROUP I~ 0~= ~_ OF ANi=:Y
CLASS IF I CAT I DN AS I}EF INEA IjY THE STANDART7 TiU I LI} I NC; C:DDE SUT3JE~:T TD
THE FOLLOWING SF'EC•IFIC: FE~?UIR:Eh1EIVTS:
~^ ,
DATE
CI~UILI?I1'Ji~ t~FI~=:IAL
Cond'Ctions of Approval: The screening fence must be continued along the eastern property
line. because i't ab.uts~ si~gnie family :res.identi~al zoning. The landscaping., Fnclwd~ng the
required landscape buffer a ong tt~e eastern property Tine, must. be completely Cnstalled
as shown on .the approved site plan by Apri_1 8 1998, The ground cover must be established
or installed ('if sod) By April 8, 1998. tf.thesecondit'ions are not-met`6y ~:p.m. on
April 8, 1998, the owner(s) must submit a financial guaran-fi.ee to the City in the amount
of $5000 times the'num6er of required landscapingpoints which have not yet been installed,
plus the dollar value of the fence plus l0 for tine. part which is incomplete;
~1 I TY OF +~ OLLE~~E STATION
i if}1 TEXAS AVENUE S.
~=:OLLE+aE STAT I Oft p T X 7784E +
C Q N D 1 T I 0 N A L
+=: E F. T I F I t:.: A T :E O F fl ~: ~: U E A N + Y
OWNED' S NAh1E: PATP.I+~ IA F~O~EF'SlDONNA WINSLOW
ADDF;ESS e FI"1 .t i ~4, i u.;~.~'O F'EF?I"f I T # . '~7~'+~7~`~
Pf::O.TE~ITA SHADOW F:O+=:w.: F'ET F?ESOF:T
LOT : 1 BLO+ :N:: a i SUBI? i V I S I ON :EDELWEISS BUSINESS E:ENTEF~
I HAVE EXAMINED THE flFFI~.:IAL ZONINS ~1AF` OF .THE s~;ITY C]F +=OLLEsaE STATION.
AND DO HEF'EBY +=Efi~TIFY THAT THE- ABOVE I~ESC:i*:IEiED LAND !°IAY L-+E OC:+=:U1=•iEE? Ih!
A+~ C:DF?DAN+- E .WITH THE ~ Et~ULAT IONS FOF: Z ON I NCB D I STF: I ~':T ~ _ AS F'Et*:
OF:D I iVANr_:E h10. i EQB SUBJE+= T TO THE -FOLLOW I N+~ VAF' I AN~:EB, EXt=:EPT I ONS Ol*:
SF'Es~ I AL F:EG?U I PEhtENTS AS FOT_L.OWS: See ~Qnd i t i onS 1 i ~PCI hel~.4 ,
~! 10! ~
DATE
+:ZONIN+~ OFFIF:IAL?
I HE>*:EBY ~:EI*:T I Fl' THAT THIS E+U I LD I Nt3 1-f`f;S BEEN I NSF'Es=TED AND THAT I T
s AN BE USED AS ~~F:OUP E+ - BUSINESS k ~~F:OUF' B Of:C:UF:AI~IC:Y
+=:LASS I F I L:AT I ON AS DEFINED BY THE Sl"ANDAF~D BU I LD I NCB +~•ODE SUBJE+_.T ' Tfl
THE- FOLLOW INS SPEC I F I C: F EL?U I DEMENTS e
' DATE tBUIL.I}Il~.~ OF~I~~ IAL:~
Conditions of Approval: The screening-fence must be continued along the eastern
;property line because it abuts single family residential zoninga The landscaping, including
,the required landscape buffer along the eastern property line, must be completely installed..
~,as shown on the approved site plan 6y.Apri'1 8, .1gg8, The ground cover. must 6e establis.hed or.
installed (if sod) 6.y Ap.ril $, lgg8, If these conditions are not met by 5 p.m. on April 8, lgg8,
jthe owner(s) must submit a financial guarantee to tine City in the amount of $SoOQ times the
'number of required landscaping points which have no~l yet been nstaTled.p plus th.e dollar value
Hof the fence plus loo for the .part which i`s ncomplefiea
I
Buffer yards shall be designed using one of the choices below:
REQUIRED PLANT UNITS/100'
4 Canopy Trees
16 Understory Trees (~
24 Shrubs €~
Plant Unit
Multplier
1 ~.
18 o.~s
MINIMUM PLANT SIZES
~/ Canopy Trees - 2' Caliper C30 gai.)
(/ Understory Trees - 5'-6' ht. C15 gnL)
~~ Shrubs 2'-3' ht. C5 gnL>
oo'
1.0 ao' '
Note #1: Masonry Wall must be a ®.75
minimum of 8" thick with foundation.
too'
25'
8' MaeonlIyy wall -/
fSeo Nnfn 81\
When .this .district abuts non-residentially zoned or developed property there is no buffer yard
requirement.
In cases where the property does not equal a multiple of 100. feet, the buffer yard planting
shall still be required, based on a percentage of the length present. If the buffer yard azea is
already- heavily wooded then additional .plantings and imgation may not required. Calculations
that result in portions of trees or shrubs (.5 or greater) shall be rounded upward.
1Vlinimum Lot Dimensions: The minimum lot width and depth shall be 100 feet each,
but the minimum lot area shall also be 20,000 square feet.
Impervious Surface: Impervious surface is a measure of land use intensity and is the
pproppoortion of a site' occupied by impervious surfaces including but not limited to,
buildings, sidewalks, drives and parking. No more than 70 % o~ a lot or site in this
zoning. district shall be covered with an impervious surface.
Floor Area Ratio: Floor Area Ratio (FAR) is anon-residential land use intensity
measure analogous to density. It is the sum of the azeas of several floors of a building
compared to the total azea of the site. The maximum FAR in this district shall not
exceed .50.
Buildin Setbacks: The minimum building setback from all roperty lines shall be 30
feet. When abutting non-residentially zoned or used land ~he rear setback may be
reduced to 20 feet.
Zoning Ordinance Page 7 - 39
SaMple Plantings
per 100' Section
05/29/98 FRI 07:41 FAY 409 846 0652 _._BRAZOSLAND REAL
ThePrudential
BrazosLand Realty
4103 S. Texas Ave., SuiEe 100
" Bryan, TX 77802
(409) 846-5735
May 29, 1998
TO: Jane I~ee
FROM: Steve Arden
SUBJECT: Shadow Roclc Pet Resort
IQ] 0 O 1
It appears that the landscaping far the pet resort nay be inadequate. As you recall, there
is to be a buffer zone between the resort and the homes under construction in Edelweiss
Phase 6-Ii. There may be two problems, the back fence is not to the property line which
would prevent a proper screen and no plantings prescribed by the zone are in place. What
would be the correct. way for u to review the original landscape plan and compare it to
the grounds?
Your helpfiilness is appreciated.
. .
. ..........
............... .
...
Page 1 '
::Shirley Volk Re Steve Arden/Shadowrock Pet Resort
From: Sabine McCully
To: JKEE@City of College Station.City Hall
Date: 5/28/98 9:41AM
Subject: Re: Steve Arden/Shadowrock Pet .Resort
great minds think alike) (jape, don't get scared!).
»> Jane Kee. 05/28/98 09:30AM »>
I don't think I'll have. time to deal with this today and 1 won't be here tomorrow. With Lee out l don't know
if you'll have time either. It's probably better if we wait until Monday when Nanette and Lee are back.
Shirley, pleas remind us at staff mtg. Monday.
»> Shirley Volk 05/28/98 09:16AM »>
Got a call from Steve yesterday saying "he was having trouble with the Pet Resort_in that they have not
completed their landscaped buffer area" and he didn't know what to dol
I think this has to go back to you planners. Nanette & Joachin have been. doing the "major" inspections,
and I know there have been some ground coverproblems, but i guess I wasn't aware that the buffer area
hadn't been completed.
Can you all take over on this, and please keep me in the loop, because Patricia calls me about just about
everything. - as does Steve!
The latest thing I had talked to her about was the fact that there are so many weeds in the groundcover
between the sidewalk and the curb and she wondered if she can have a Is company kill what's there and
then sod it. The answer was "yes" because it's'a mess now. But I don't recall any problems noted with
the actual plantings.
Steve's number is 846-8788 Ext 24.
CC: Shirley Volk
Shirley Volk.... Re Shadow Rock Pet Resort .:..:.,.... ..,..:: n. :::;....:..: .:....:...: ..:. :.:.: :::.: .....::.:,-::.::::::::Page:_~.:
From: Shirley Volk
To: LHANKINS~City of College Station.City Hall, Natal...
Subject: Re: Shadow Rock Pet Resort
~ Nanette & Sabine are working with the landscape contractor regarding the landscaping. Once that't
worked out, F guess we'd be ready to issue the full clean C.O. It may be awhile, yet. Nanette & Sabine
will let me know when they are ready to close this one out.
i »> Lisa Hankins 06/09/98 10:24AM »>
a gentleman called earlier (the original contractor) regarding some money owed to him by (i guess)
Patricia and- donna, but they said they won't pay him until they get a clean c.o., i've looked in the files to
make sure we haven't issued clean c.o.'s yet, and we haven't ,anyway... could you put that on your list of
places to check out so we can take care of this. thanks.
CC: Lance Simms, Nanette Manhart, Sabine McCully
I
i
From: Sabine McCully
To: jkee, avolk, nthomas
Date: 2/5/97 12:58pm
Subject: note to file: pet resort
re: buffering zone requirement
i spoke with donna Winslow yesterday to clarify the buffering requirement. i
apologized for the. mistake in interpretation that only the first phase will
need. to include the buffering requirement at this time. this is incorrect
because the condition of the rezoning to c-2 was that the buffer zone be
installed in accordance with the r&d district,. and that requirement means that
the entire extent of a buffer zone must be in place before the zoning takes
effect.
however, i told her that in this particular case, due to the similarities of
the the previous zoning (c-3) and the existin zoning we will go ahead and
consider the c-2 to be in effect, and that we will look for the buffer to be
there at the time of c.o. .this means the building permit will not be held up
for the buffer.. but the buffer will not be eligible for the. 4 month extension
that is available for the rest of the site landscaping/atreetscaping.
i will print out a copy for the file.
R
- ~
Conr~itions of Approval; The scree;~ing fence must be continued along the eastern property
line because it abuts signle family residential zoning, -±he landscaping, including the
re;ui r~:d landscape buffer along the eastern property line, must be completely instal 1c:d
as shown on the approved site plan by .April ~, l~gs3. The ground cover must be established
ur installed of sod) by April 3, 1~J989 if these conditions are not met by ~ p,m, on
April '.3, 1o~gi the owner(s) riust submit a financial guarantee to the City in the amount
of ~S,,OC *.imes the number of required landscaping points which have not yet be°n installed,
plus the dollar value of the fence plus l0.°! for the Dart which is incomplete,
,.
Page 1
Shirley Volk._.Re Shadow Rock Pet Resort .. ::...: ......... ....:..,,,,.,::..._...:: .... ...:...
From: Shirley Volk
To: NMANHART~City of College Station.City Hall, Sabin...
Subject: Re: Shadow Rock Pet Resort
Actually that's what I told the contractor we could do if they didn't make contact with us soon. I explained
.that we had only talked late last week, so I wanted to give them a chance. I commenserated with him
because they are reading a contract'literally, but that's his problem and not ours. He knows that and
simply wondered what we could do, if anything. He really didn't act mad at all when 1 talked with him -
just frustrated!
»> Nanette Manhart 06/10/98 11:16AM »>
My two cents are that If it's a big problem,,) think it's OK to release the CO and go into code
enforcement, if the Pet resort does not finish putting their buffer plants. Most everything else is fine and
they did indeed clean up the front like they promised. bye
»> Sabine McCully 06/10/98 11:O6AM »>
lance just came and talked with me about this -apparently the general contractor called and is mad
about the temporary co. it sounds to me .like he may be expecting us to .resolve a problem tht he has
with the pet resort owners. however, he does seem to have some questions as to how and why we do
this conditional co thing:, so i told lance that i -think perhaps you can talk to him, shirley. if you would like
me #o be in there with you so we can talk to him via speaker phone that's fine -may be good to have nan
in there as well
»> Nanette Manhart 06/09/98 04:12PM »>
As per Shirley.. I am waiting on the landscaper to call me.
»> Sabine McCully 06/09/98 10:52AM »>
i don't know what the latest is on this - do you.,: nan?
»> Shirley Volk U6/09/98 10:29AM »>
Nanette & Sabine are working. with the landscape contractor regarding the landscaping.. Once thatst
worked out, 1 guess we'd be ready to .issue the full clean C.O. It may be awhile, yet. Nanette & Sabine
will'. let me know when they are ready to close this one ouf.
~ »>
»> Lisa Hankins°06/09198 10.24AM
~ a gentleman called earlier (the original contractor) regarding some money owed to him by (i guess)
Patriciaand donna, but theysad they won't pay him until they get a clean c.o,,,i've looked: in the files to
make sure we haven't .issued clean c.o.'s yet, and we haven't ,anyway... could. you .put that on your list of
places to check out so we can take care of this. thanks.
a Hanl~ins ~ Re: as w flocK t~et rcesor< ::.::::~:. :::::::::::::..::::::::::::::-::::::::::::: ;:::::::::::::::::::::::
,~ ~ ~ r
~4
from: ~ ,, `Shirley Volk
To: LHANKINS@City of College Station.City Hall, Natal...
Date: 6/9/98 10;29AM
Subject: Re: Shadow Rock Pet Resort
Nanette & Sabine are working with the landscape contractor regarding the landscaping. Once that't
worked out, I guess we'd be ready to issue the full clean C.O. It may be awhile, yet. Nanette & Sabine
will let me know when they are ready to close this one out.
»> Lisa Hankins 06/09/9810:24AM »>
a gentleman cal ed earlier (the original contractor) regarding some. money owed to him by (i guess)
patricia and donna, but they said they won't. pay him until they get a clean c.o., i've looked in the files to
make sure: we haven't issued clean c.o.'s yet, and we haven't ,anyway... could you put that on your list of
places to check out so we can take care of thin. thanks.
CC: Lance Simms, Nanette Manhart, Sabine McCully
~~r~~ pr i ~~~~ ~~ 1t~re~C~~1'll,C~-orS
n
e
f
~,
From: Natalie Ruiz
To: City of College Station.City Hall(JKee, SHomeyer, ...
Date: 6/5/97 2:51pm
Subject: Shadow Rock Pet Resort -Reply
Well, I don't know anything about the "scapegoat firing"; however, I told
Donna months ago that the total impact fee is $1,448.85 (the 1 1/2" meter
counts as five LUE's at $289.77 each). Anyway, when. it was our legal
department that had not contacted Steve Arden to work out the license to
encraoch, I told Donna that we would not hold up the DDP and building permit
as long as she paid the impact fee. The holding: up of the plat was our fault
and apparantly this was new territory we were establishing requiring a license
to encroach. Since that time,-Donna visited with Roxanne and then decided to
take another approach to that buffer easement. so that the landscaping is not
removed by future repair work in that easement. I understood that Donna was
going to work with Steve & Mike McClure to change the language on the final
plat and bring it back in to file.
I don't know anything about the'guy at the desk-that wouldn't take the impact
fees.
»> Shirley Volk 06/05/97 02:39pm »>
This project is in the sewer impact fee area. Originally that fee was to be
paid with building permits. Now it has been changed to being collected with
the plat. This project has fallen through the cracks because something
happened in the platting process and I don't remember what it was, but the
plat has not been filed yet because of the language of the landscape buffer
and what Steve Arden wanted, what'our Legal dept wanted and what Donna Winslow
wanted. Steve has told me it's in Donna's court now. (I guess she's the
"owner" who will be signing the plat.) Whatever - the point is, it hasn't
been filed yet, and I don't thinklthe impact fees have been paid!. In fact,
that's one of my questions - how much is the impact fee for this project? On
this one, it's like I've been in 'another world!!!
The point is, everyone said they were o.k. with issuing a slab only permit on
it and Lance told the contractor what he needed to bring in .for it. Then the
contractor brought it in but never picked up his permit, so all they really
have is the development permit. We can do whatever. we need to do on this one
right now if we make a decision fast, and then get that decision to Donna.
Unfortunately, I'm the coordinator on this one, so just tell me what I should
be reminding her of, please. Thanks.
Update: I called Donna & left word for her to call me. Then I called the
contractor and he said the title company & bank had shut the project down
because the financing had never. been. approved. That was 3 weeks ago! Now he
says Donna has told him they are to begin again next Thursday (6/12),. so we
need to get a decision made as to what we still need to do. Paul has checked
and they only have a partial d.p. - we never have approved the site plans and
they have all of them back.- including the redlines - so they can make the
corrections as needed. 2nd p.s. The contractor also verified that he had
tried to pay the impact fee but the "man sitting at the desk" said he didn't
know what they were going. to be since this is such a special case.
Jane, when are you going to start processing the "scapegoat firing" ?!?
From: Shirley Volk
To: NRuiz, VMorgan, JKee, SHomeyer
Date: 6/5/97 2:39pm
Subject: Shadow Rock Pet Resort
This project is in the sewer impact fee area. Originally that fee was to be
paid with building permits. Now it has been changed to being collected with
the plat. This project has fallen through the cracks because something
happened in the platting process and I don't remember what it was, but the
plat has not been filed yet because of the language of .the landscape buffer
and ,what Steve. Arden wanted, what our Legal dept wanted and what Donna Winslow
wanted. Steve has told me it's in Donna's court now. (I guess she's the
"owner" who will be signing the plat.) Whatever - the point is, it hasn't
been filed yet, and I don't think the impact fees have been paid!. In fact,
that's .one of my questions - how much is the impact fee for this project? On
this one, it's like I've been in another world!!!
The point is, everyone said they were o.k. with issuing a slab only permit on
it and Lance told the contractor what he needed to bring in for it. Then the
contractor brought it in but never picked up his permit, so all they really
have is the development permit.. 'We can do whatever we need. to do on .this one
right now if we make a decision fast, and then qet that .decision. to Donna.
Unfortunately, I'm the coordinator on this one, so just tell me what I should
be reminding her of, please. Thanks.
Update: I called Donna & left word for her to call me. Then I called the
contractor and he said the title company & bank had shut the project down
because the financing had never been approved. That was 3 weeks ago! Now he
says Donna has told him they are 'to begin again next Thursday (6/12),,' so we
need to get a decision made as to:what we still need to do. Pau has.. checked
and they only have a partial d.p.--- we never have approved the site plans and
they have all of them back - including the redlines - so they can make'the
corrections as needed. 2nd p.s. The contractor also verified that he had
tried to pay the impact fee but the "man sitting at the desk" said he didn't
know what they were going to be since this is such a special case.
Jane, when are you going to startrcprocessing the "scapegoat fining" ?!?
c~~~; ~' ~
~~a~~ ~ ~~
4 ~ ~ ~- CITY OF COLLEGE STATIOI`I
(~®~) ~43~~®
January 28, 1997
Petropolis
16830. Chesterfield Airport Road
Chesterfield, Missouri
~~
VIA FACSIMILE
Dear Sir:
The City of College Station has been approached by a developer who: is desiring to locate
a full service pet center in our area. We are trying to assure that our water system is
adequate to provide their needs and that their water meter is sized correctly. We do not
have any reliable water demand data for this type development and were hoping you might
be able to help us. We are interested in the average daily water demand and the peak day
,water demand for an establishment like yours. It would also help us to know hcw many
runs you have so that we can scale these demands up or down accordingly based on the
College Station.. development's size. The establishment locating in'our area anticipates 51
indoor/outdoor runs and 3 bathing stations. Thank you very much for your help. If I can
ansdver any questions;' I can be reached at (409) 764-3570.
~~ '
..
,~ ;
Asst. City Engineer
DEVELOPMENT PERMIT
PERNIIT N0.452
SHADOW ROCK PET RESORT
.~
SITE LEGAL
Lot 1, Block i°
FOR AREAS OUTSIDE TIC SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY,CODE
Center:.
SITE ADDRESS:.
Not Addressed
Patricia gees, Donna W'
1615 Eme d Lake Ct.,
Houston, Te
409$90-0963
DRAINAGE BASIN:
Hopes. Creek Basin
TYPE OF DEVELOPMENT:
This permit is :valid for site grading.
Upon approval of these details, full
property. No work shall occurwithii
Texas Department of Transportation.
:d by the City.
~daries of this
.pproval by the
The Contractor shall. take all necessary precautions to prevent silt and debris. from leaving the, immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College. Station, measures shall be
taken to insure that debris from construction, erosion, .and sedimentation shall not be deposited in city
streets, or existing drainage facilities.
I hereby grant .this permit for .development of an area outside the special flood hazard area. ;All
development shall "t>z in accordance with the plans and specifications submitted to and approved by the
City Engineer in the development permit application for the above named project and all of the codes and
ordinances of the City of College Station that apply.
/~-3 ~~
Administrator/Renresen ve Date
~~~~~:~ ~ 4 ~ a~~ . g ~
Owner/Agent Date
Contractor
Date
~•- CITY OF COLLEGE STATIOI`I
_ ENGI-~ERING .DIVISION
Post Office. Box 9960. 1101 Texas Avenue
College Station, Texas :77842-0960
(409) 764-3570
MEMORANDUM
DATE: May 2, 1997
TO: Shirley Volk, Development Coordinator
FROM: W. Paul Kaspar, Graduate Civil Engineer
RE: Mortier Drive Construction Standards
The information you requested about Mortier Street is a follows:
39 foot wide, 1.5 inch thick hot mix asphaltic concrete pavement constructed within a 60 foot .right
of-way.
Base. was constructed of 7 inches of crushed limestone compacted to a density of at least 95% of
maximum dry density as determined by modified proctor compaction test ASTM D1557 and within
2% of the optimum moisture content.
Subgrade was constructed of 6 inches of lime stabilized subgrade compacted to a density. of at least
95% of maximum dry density as determined by proctor compaction test ASTM D698 and'within 2%
of ~e optimum moisture content.
The street has typical City of College Station curb. and gutter along both sides.
The street has been constructed to City of College Station... Standards.
Let me know if you have any questions or need additional information.
cc: Kent Laza, City Engineer
05/09/97 FRI 07:51 FAX 281 922 548
--
KINKO°S HOtiSTON #16
B3PROPERTfES,1NC,
P.O. BOX 9252
COLLEGE STATION, TEXAS 77842
Fax # (409) 764-3496
May 9, 1997
City of College Station
Development Services
1101 South Texas Avenue
College Station, TX 77842
RE: Shadaw Rock Pet Resort
ool
Dear Shirley:
Thank you for your response to the paving issue. This letter shall serve as notification that Bs
Properties wishes to withdraw our request for placement on the next P&Z meeting agenda.
I had. spoken to-our contractor, William Coltzer, yesterday and we should start seeing major
progress from him soon and that your. office may expect a visit from him next week for permits.
Again thank you for your time.
Regards,
Patricia K. Rogers
CEO
1VIay 2, 1997
City of College Station
Planning Division
1101 South Texas Avenue
College .Station, TX 77845
RE: Shadow Rock Pet Resort
Dear Shirley:
I wish to request a variance from the Planning & Zoning Commission for the paving
requirements on the above subject project. I shall go through my correspondence files this
weekend, however I did in fact have a dialogue with Ralph Benson last fall regarding the
feasibility of this project with him. Ralph recommended that I contact Bill Coltzer for an
estimate as he is an Architect as well as a General Contractor. At that time his estimates were
high and thus I chose to go back to David Baca for additionat input. and advice.
I shall search for any correspondence regarding this matter and wvill bring to you next week,
If we should have .any problems getting on the next P&Z agenda, please let me know.
Regards,
Patricia K. Rogers
CEO
Shadow'Rock Pet Resort
B3 PROPERTIES, INC.
P.O. BOX 520
WELLBORN; TEXAS 77$81
(409) 690-BARK
March 3, 1998
City of College Station
Code Enforcement
1101 S. Texas
College Station, Texas 77840
RE: Shadow Rock Pet Resort
Bakery Kitchen
Dear Mr. Sims:
In accordance with. our conversation on the above referenced area, Shadow Rock Pet Resort does
not intend to use the cooking surfaces to prepare fried foods for pets. The primary purpose for this
cooktop is to prepare meat-based broths and for obtaining correct melting temperatures for products.
such as carob chips, peanut butter chips and the like. As a protective measure of insurance, we shall
install an appropriately rated fire extinguisher in this area
If you should have any further question or concern related to this matter, please feel free to contact
me at 690- BARK (2275).
Sincerely,
;Li
~~
Patricia K; Rogers, C.P.M.
CEO
c:~Is. Shirley Volk-.Planning Dept
Lt. Raymond Olson -Fire Dept.
~~- C~ -
u~ ~ ~ ,~
'': ~ cti~
~ ~~ - ~r ..~- ~ ~ ~. ,~ ~/ ,J-
~'~~`°/ ~'~ I ICAT~~~~ O CUPAN Y`~HECKLI T
7 CERT
~c Date:- ~ro~ect:
~~
EL CT IC: (Ray 3680, Tony 3438) -- -
I ~ 9~ `~ D ..G~GG• ~L ~~~~ ~O ~O
i~~LG- ~ ~
`Go~
ENGINEERING: Covers Water, Sewer, Drainage, Site Utilities, Impact Fees
(Kent 3581, Veronica 3763, Steve 3592)
(David D. 777-3942, Vern W. 777=0192, Jerry J. 777.-3557, John L. 759-3970)
__. _ lo~S'~~
~-
FIRE: (Jon 3781) _. _,n_ _ __ _f--` ~~ ---
LEGAL: (Jan 3546) ~ ~~~~- ~ ~-
(Easement?) ~-`7i ~-a.L .~C~Cd ~~-~-G'~ ~J
ZONING/PARKLAND/LANDSCAPING/DUMPSTER LOCATION & SCREENING:
Sabin 3782, Joe 3748
h G/.(//,ill /_LEi(,~.. (V~(`/~ V ,(, ~, - `
DU PSTER SERVICE: im ., ally, Freddie -all at 3690)
J a1 _ ~~
~~~
`~i'~ ~ ~- ~" ~ - ~~C~~--,,r.,~ .~~7-~=~ G~~ ~ ~% ~ x. ~ ~ Sit/ `~,c~~ -u'.
~.-''~ i c G~ ~ ~~ '~~~a,zf~ ~J '~E2.~ -~ CL~~ C'`~;t~~c,>-s'3'ze';f: ~~-~~ ~~ ~ GZ-- ~,,..J,Ci ~{,~
` ~ ~J"
~ ~.
~. ~~C
`tkl.C ~.~c .
~,
.QG+~ ~!
. •
~~
~~~
~ - ~ v
~ ~~~
/~ ~~~:~ ~ ~ ~~. rte- `~ ~~, ~ ~~~-, . ~Id
~~ ~
~ ~ ~~~ ~ ~ ,
x~
, "`
~~~~~~.
~~t~~~~a x. ~t~~~~s
Chief Executive Officer
105 Mortier Road
Cotlege Station; Texas 77845 (4Q~~ '~`~°''7~8'~
~ ~ ~~LL COLTER Jt~, AlA
PRI AC ARCHITECT
I ~ _ .. ,
i
i II
COLT / N.
2328 6 AVENUE
(409} 763-0320
',
J ~J ~.
MILTON: ARCHI CT
GALVESTON,TEXAS77550
FAX (409) 763-3023