Cheatham & Associates
Engineers • Planners • Surveyors
DATE:
TO:
COMPANY:.
P.O1
~,~/e
q~
Phone No. 817/548-0696
Fax No. 817/265-$532
>~Ax No: C~toa} 7~~~3~r9~
FROM: ~r..a.~ Tvc.ker
C&A JOB NO: tOtQ- ZD7, ZD~~ Z04
1\I~UMBER OF PAGES INCLUDING CQVI/R SHEET: 3
MESSAGE {IF ANY): ~e~.a_,
Messenger
YLL'ASE NOTE: tfyou did not receive all of the pages, please contact the sender at 817154&-0696 as soon as
possible-
Cheatham .4: Associates
1601 E, Lamar Blvd., #200
Arlington, TX 7661 1
tD~g~4~1
wv ~_t~~y w r C)11vw (;er[ittcd Mai l
Hard Copy to Fcallc~w via First Class Mail Overnight I~elivcry
Oct-08-97 09:55A
P_02
CHEATHAM
AND
ASSQCIATES
October 7, 1997
City of College Station
Development Services
1101 Texas Avenue
College Station, T7i 77842
Attn: Veronica J.B. Morgan,. P.E., Assistant City Engineer
lte: Pre-Development Meeting Resolutions Concerning
Graham Road New intermediate Schoot,
Willow Branch & Oakwood Additions and Renovations
.Project No. I019-207, 208, 2U9
Ms. Morgan:
It was a pleasure to meet and talk with you at the meetin ~*. yesterday. David and I are both pleased to
be working cooperative)y~ with both the City of C'~llege Station and College Station LS.1}. We Ioc~k
forward. to the successful completion of these pr~lects. 'T'his letter is to confirm and request items
discussed at the pre-development meeting.
Graham Road New Intemmedate School
1.. '~ Per our discussion with yc~u, we will locate the future thoroughfare for the soLith-east
side of the property so that it will work with the existing grades and creek location.
2. ~ We will prepare a right-of-way stri .map along Graham Rt}ad to assist uy in determining;
the proper nght-of-way dedication~or our site.
3, / We will revise the driveway/parking layout per the requirements listed in the driveway
ordinance.
4. ,~We are requesting that C~,llege Station LSa. have a traffic study performed along our
portion. of Graham Rc}ad.
5. '~ We would like to request a flow test for this school at a location deemed acceptable by
v ~"'~ the City.
6. / We will continue to pursue options with Ji~hn Szabunicwicz in regards to the sanitazy
sewer line along. the south fork of Lick Creek. If these. negotiations fail, we have
advised College Station I.S.D, to pursue aDeveloper's Agreement with~the t:ity to
ensure the sewer hncs construction.
7. ~ We will obtain written confirmation, as to the current usage, size and cotrtcnts of the
existing oillgas pipeline on our property.
8. ~ until a re istcred trallic engineer studies our Site, we arc reluctant to choose which
thoroughfgare cross-section wtll apply to C'rraham )toad I:rc~nting the school site.
9. .~ We request that the C~rraham Road improvements project time schedule be mowed up to
meet the School Distriet's time constraints. Please coordinate with Kcnt La7a.
~~t~ ~ ~ cslso ~
~ ~. (.~~.
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
8171548-0696 • Metro 255-8836 • Fax 817/265-8532
Oct-08-97 09:55A P_03
,y
Veronica J.B. Morgan, P.E. October 7, 1997
City of College Station page 2
Willow L3ranch Intermediate School
] . it is our understanding that the City of College Static}n would prefer that the section uF
Wolf Pen Creek can the school site a dedicated as a re Tonal detention facility. It is also
cur understanding that, if dedicated, Cone e Station I.~.D. would not have to do any
construction or'improvement to this arca:,.}Q,;,s iSA~l~s ~'_ (.e .-.
2. / We wish to confirm that it is acceptable to the City that-any floodway/detention area in
~~' Wglf Pen Creek lost due o building addition side l;rading, can he replaced by
/ excavating an equal area un the opposite bank.
3. /We would like to request a flow test for this school at a location deemed acceptable by
the City.
4. +1~,. We would like to request that the Cityy field locate all existing utilities on thissite (i.e.
~~,,~ wafer, sanitary sewer and electric.. Telephone cable location will be coordinated with
GT'E. We would,prcfer that this field location be done with our surveyor on-site. The
Schoo! District will have him coordinate with you and G'1'L.
S. We will confirm the right-of=way along Anderson Drive.
6. ~ Please confirm that all previous prelitinary plats l~rtliis site will suffce and we can
'~~ submit as a final plat can nctober 29`h.
Oakwood Intermediate School
1. ,~ We understand that the 0.3 acre piece of land, sold.by Colle a Station LS.1). to Dr. Aric
.~ L. Darien, must be shown on the final plat with a signature bock for Dr. Uancn. Bill
Savage with Collele Station 1.5.1). will coordinate this.
2. / e would like to request allow test for this school at a location. deemed acceptable by
~ ~n Cit
3J ~ We w ul~ to request that the (;ity field locate all existin ~ utilities on this site i.e.
~ water, sanitary Sewer and electric). Telephone cable location wilt be coordinated with
1 ~ CrTF. We would prefer that this field Ic~cation be done with our surveyor can-site. "The
~ School District will have him cc}ordinate with you and GTE.
4. ,~ Please cim(irm that all. previous preliminary plats for this site will suffice and we can
~~ submit as a final plat on October 29'h.
Enclosed you will find the requested copies of maps with color coordinated existing utilities for field
locations.
We luck forward to working with the City cif College Station and are prepared to assist with lthese
requests in any way possible. If you have any additional questii~ns or comments, please call roe.
Siney, ~`
_.~-~
liry I"uc cry-~,J~
- - b':~WC't~~LGG120T1 re.dcvlo .mt ~:resoLMor ~~ Lw ai
D P b b f
Enclosures
ce: Steve AluwaYY, VI,K Architects
Lull Savage, P E., Cone re Station I.S.D.
Tun Michalskyy, Cityy o~ C'olle~c Station
Shirley Volk, CitY cif College Station
Laverne Akin, C'rTE Telephone
!)avid Mayes, Cheatham & Associates
Brad Kerr, Kcrr Surveying
~~~'" ~~~
CHEATHAM
AND ,.
ASSOCIATES \'~
October 7, 1997
City of College Station
Development Services
1101 Texas Avenue.
College Station, TX 77842
Attn: Veronica J.B. Morgan, P.E., Assistant City Engineer
Re: Pre-Development Meeting Resolutions Concerning
Graham Road New Intermediate School,
Willow Branch& Oakwood Additions and'. Renovations
Pro,~ect No_ 1_019-2,07, ?.08.,209.:....
Ms. Morgan:
It was a pleasure to meet and talk with. you at the meeting yesterday. David and I are both pleased to
be working cooperatively with both the City of Collcge tation and College Station LS.D. We look
forward to the successful completion of these projects. This letter is to confirm and request items
discussed. at the pre-development meeting.
Graham Road NewTntermediate School
1. Per our discussion with you, we will locate the future thoroughfare forthe south-east
side of the property so that it will work with the existing grades. and creek location.
2. We will prepare aright-of--way strip map;along Graham Road to assist us in determining
the proper right-of--way dedication for our site.
3. We will revise the driveway/parking layout per the requirements listed in the dlriveway
ordinance.
4. We are requesting that College Station I.S.D. have a traffic study performed along our
portion of Graham'Road
5. We would like to request a flow test for this school at a location. deemed acceptable by
the City.
6. We wiii continue to pursue optior_s ~,%ii'r..iolul SZdeaYrewicz ~rl regards to file sailltafy~
sewer line along the south fork of Lick Creek. If these negotiations fail, we have
advised College Station LS.D. to pursue a Developer's Agreement with the City to
ensure the sewer lines construction.
7. We will obtain written confirmation as to the current usage, size and contents of the
existing oil/gas pipeline `on our property.
8. Until a re istered traffic engineer studies our site, we are reluctant to choose which
thoroughfare cross-section will apply to Graham Road fronting the school site„
9. We request that the Uraham Road improvements project time schedule be moved up to
-meet'the School District's time constraints. Please coordinate with Kent Laza~
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc..
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
~~~~~
Veronica J.B. Morgan, P.E. October 7, 1997
City of College Station Page 2
Willow Branch Intermediate School
1. It is our understanding that the City of College Station would prefer that the section of
Wolf Pen Creek on the school site be dedicated as a reggional detention facility„ It is also
our understanding that, if dedicated; College Station I.S.D. would not have to do any
construction or improvement to this area.
2. We wish to confirm that it is acceptable to the City. that any floodway/detention area in
Wolf Pen Creeklost due to building addition site grading,. can be replaced by
excavating an equal. area on the opposite bank:
3. We would like to request a flow. test for this school at a location deemed acceptable by
the City.
4. We would like to request that the Cityy field locate all existing utilities on this situ (i.e.
water, sanitary. sewer and electric. Telephone cable location will be coordinated with
v~TE. ~'~~e vv oCild Mrefer tha~a.+i~ t1ii.~i. 1.1e1d lo~.a l~nbe ~aoi e' .vlth 'v'ui~ :~.f'ilil~v'i'.yviLil~'.~Sitv:. Ti1~'i
School District wi~l have. him coordinate. with you and GTE.
5. We will confirm-the right-of-way-along Anderson Drive.
6. Please confirm that all previous preliminary plats for this site will suffice and we can
submit as a final plat on October 29t"
Oakwood Intermediate School
1. We understand that the 0.3 acre piece of land, sold by College Station I.S.D. tc- Dr. Aric
L. Dancn,, must. be shown on the final lat with asignature -block for Dr. Danen. Bill
Savage with College Station LS.D. will coordinate this.
2. We would like to request a flow test for this school at a location deemed acceptable by
the City.
3. We would like to request that the City field. locate all existing: utilities on this site (i.e.
water, sanitary sewer and electric)). Telephone cable location will be coordinated with
GTE. We would prefer that this ~icld location be done with our surveyor on-site. The
School District will have him coordinate with ou and GTE.
Y
4. ' Please confirm that all previous preliminary plats for this site will suffice and we can
submit as a final plat on October 29t"
Enclosed you will f nd the requested copies of maps with color coordinated existing utilities for field
locations.
We look forward to working with the City of College. Station and are,prepared to assist with these
requests in any way possible. If you have any additional questions or comments, please call me.
Sincerely,
~_~
Bry ,. ,,.~._Tuc er.~..._
.......... _._...h ....~.
`" F:\WO COLLEGE\207\pre.devlop.mtgresol.Morgan.wpd
Enclosures
cc: Steve Alowayy, VLK Architects
Bill Savagge, P E., Colle e Station LS.D.
Tony Michalskyy, City o~ Colle e Station
Shirley Volk, C;ity of College ~tation
Laverne Akin, GTE Telephone
David Mayes, Cheatham & Associates
Brad Kerr, Kerr Surveying
Jct-15-97 03:27P
Cheatham & Associates
Engineers • Manners • Surveyors
P.Ol
~`~/~uIJU
Phone No. S 17/5480696
Fax Nc~. K.17/265-8532
DATE:
a.o.
COMPANY:
rAx No:
FROM: ~ n ru r_ K c >r'
C&A JOB NO: t D19- Zo7
NUMBER OF PAGES INCLUDING COVER SHE~>/'i': dZ
MESSAGE (IF ANY}: ~~ ~~-~- ~+:~~ ~2
_~ No Copy to Follow C=ertified Mail
Hard Copy to Follow via First Class Mail Overnight Delivery
Messenger
PLEASE NOTE: if you did not receive all of the pages, please contact the sender at $17548-0696 as soon as
possible.
~/
Cheatham & Associates
1G01 E. Lamar Blvd., #200
Arlington, TX 76011
lo~i~/9 7
Oct-15-97 03:27P P.02
., ~
'C°.
~~ r ~ V
~ ,, ~ ~ ,.
~ (~~ s~13 µ~,l( 5~tv~Gi~ ~ ~t t~Jitl b.G. P~ttc~
~ • , ....
.~..
_.Y .
..:,~
..
-.
._
!_
__: ...
_. .. .I _ _ - _- -- _.
. _._.
-~
,~ ..
v '\~I +~ ..r ~ ~ New ~ '~O f e~•~ ~C 0. T ~~~
_ ~ ~ ~ '~ . ~' ~rIM ~'~'f s d r;J~ S a,re~ ~~ cccsf
!~, ~~
lip ~ ,~ :~ : ,
~ f 1 ~ j ; 1 ~ ~ ~ ~ ~ EIERCEJ~
;;,..::1. i~1 ,:
+. ,- ,v.,
_; ~ ~',:
; I ~j ~TCieurE eC ~,.., ~ w+~TE au ~ r
i «~ ~
it ~ j :;~..) ~ f 14~ ~ ~ ~ , ,r.:
s I i ~ I ~ ~ ~ + ! xTERMAtE ~• ~ A~TEAM/-tE 1Q %,~
1
,~ + ~
` 1 r
,~ I I ~ +
f i ~~~ ~ !
,~ 1 $
j.~ ~
! ~`~ ~ , `
I'~ ~ I' r `ti~~~~Q~ ; I t
i ~ ~' ~ ! i
~~ f
! ~ ;: 1111 fI
' I ~ ~ ~ 1 ~~ I ' ~ ~ !~ i+ ~E~r gTEiIiEOU-7E
i +~+~ ~~, Iiil
~ ,~
~~
i r i l ~ s ~,
' a ~ ~ , t cove
it ~ ~ ~ ~ ! ~; ~ , ~t 1 ~ , ,..ao s
'i, + ' ~ si ~ '~ 't t '
_J
_~_..... _ _ i I ~' ~
( ,,` ~
~} ~ ~ ! ! ,
t ~~ ~`t 4~ TNRtJ T C ~
„ } ~~ 1
i. i i.ia ~
of
:.. ~ ,_, .
~: `r~ ~ : • ~ , ~ ~' , E z ~' ,! ~ F ~ ~, a- Boa PNOCa~Ia ~~~
~1 I, ~~ 1~ ~~ ~1 ~ ~~ ~ I ~ I ~ I ~~ ~ ~ i i
~,~~
~ ~~
~~, ~ ~,
~' , ' .l
~' ~y
M ~
i~
,r`. ~',
_~..._
Rork
l~
' ~ ~ lll(l'i~1i1111NlIIII~~,~.dII
~// '~ ~ _ ~
~ ~ ~~..
t:}
-~ `• -~ oft r„aa ..~ ',\ -~ '`~
~,
.~
,,
1 ,4
~~~
;~
,; ~
~~
:;
~~
!;
~:
;:
,~ ~
,i
i~ ,i
~f
rf
7 6~;.~
t-is PQrk~~ 't~ ~`ts
~,.
,~tt^ar,ea~, pleo.sc ~'i~wort.
~~'~ ~ av f ~ ~ 1 ~, ~i ~~
~Da'i ~, t t e '~i a,r-e° , is 7
October 13, 1997 ~ ~ `~
~ ~"
~'
s~ ~
~'. ~
VLK Architects ~~" ~' ~ ~ ~:
~, ~ ~~
1.161 Corporate Dr. West,#300 ~~ '~, ~ ~' t~~ ~ ~ ,~
Arlington, TX 76006 ~~. ~? s'~ , ~ ~ ~~' ~ ~ ti
Attn: Steve Aloway ~ ~ ' ~``~" ~ ~~ ~~~~
~~ ., ~
Re: Pipeline Running Along Graham Road-and ~;~ . ,~ ~'
down line Tvortheast rroperty it,ine of the ~ .
New Intermediate School Site ~
~kT' ~`l~
~~~ Project No. 1019-207
Steve:
~ I have contacted Bud Ray with Aquila Pipeline Company in regards to the above mentioned
~, pipeline. Mr. Ray stated that the pipeline is a 6 inch gas transmission line, running of an
intermediate pressure of 500-600 p.s.i. He also stated that hus pipeline is approximately three (3)
~`~;, feet deep at all locations.
n~ _ ,..
~ Mr. Ray,;further stated that the pipeline :running from the well head towards .Lick. Creek belongs
°-y to Southwest Pipeline Company.. Mr: Ray said that Aquila and Southwest work together and
transport each others gas from time to time. Each of these gas lines begin at the well :head
location on the. School District's property. The contact for Southwest Pipeline Company is Paul
Nicholson. I am in the process of contacting him to obtain easement information.
In`regards to the Aquila pipeline easement being overlapped by the City.. of Bryan's electrical
easement, Mr.`Ray stated that since their easement document was.. filed before the City of
`Bryan's document, theirs is the legally binding easement. However, Mr. Ray then said. that
Aquila would not make an issue of this matter with the City of Bryan. Mr. Ray also said. that
Aquila would be willing to vaork with the School District in anyway possible.
Please inform Mr. Kalsta of the depth of the pipeline, as it will affect his preliminary site
grading plan. If you. have any questions regarding this matter, please -call me.
Sincerely,
~~ _
Bry .Tucker
F:\WORD\COLLEGE\207\pipeline.graham. VLK.wpd
cc: Bill Savage, P.E., College. Station ISD
Veronica J.B. Morgan, P.E., City of College Station
David Mayes, Cheatham & Associates
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar' Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
October 27, 1997
City of College Station
P.O. Box 960
College Station, TX 77842
Attn:. Mr. Ed Hard, Transportation Planner
Re: College Station Independent School District
Graham Road Site Platting
Project No, 1019-207
In accordance with therequest of the City, we re-evaluated the alignment of the future "Street A"
connecting the future streets, Southern Plantation and Eagle .Avenue. The route proposed is based on
the following:
1. Mutual participation of the property owners involved in the dedication of required R.O.W.
2. Minimum conflict with the 100 year flood plain and. utilization of existing topography to its
maximum benefit.
3. Keeping the length of the creekcrossing to an absolute minimum. Minor realignment of the
drainage way can easily be accomplished and possibly facilitate the use of box culverts in lieu
of a bridge section..
4. The proposed route has minimum negative impact to all the properties involved. Tract BS and
GI have somewhat of a unique planning problem that.. will have to be addressed. to
accommodate the proposed alignment. Traditionally tracts Ghat are "out" have been rezoned to
office or commercial tracts to obtain the best use available with no financial. impact to the
owner of the property.
We feel the alignment proposed will. best accommodate all properties involved and give the City the
most economical route from a cost point of view.
If you have any additional questions or comments, please call me.
I/
David E. ayes
F:\W OR-~\COLLEGE\207\Hard.platting.wpd
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
J. R (Dick) Birdwell
Consulting Engineer
# 3 Forest
College Station, Texas 7784
(409) 20"0 2076 (800) 294 047b
FAX~409) 2601288
Jan 28, 1998
Mayor and Council
.copy: Skip Noe
Re: New School Site on Graham Road
i~
~, ~'
~``
;'
I will be out of town Feb. 12, 98 and will miss the Council Meeting on that day.
Approval of the plat for the new school on Graham road will be on the agenda.
I encourage -you to reject the proposed plat and to ask Staff and the. Planning Board to
reconsidered this plat requiring the. development to have anorth-south street on either the
west or east side. of this tract.
The plat as proposed has three curb cuts on Graham Road. The plan calls for a future
additional .grade school on the same track with no consideration of the traffic going to that
school from the north. The two schools on this track will be significant traffic generators
and the tree curb cuts will become bottlenecks on Graham Road in the future. Aside
street with curb cuts on the. side street is a major improvement at minimal cost as
compared to the total school budget for this tract.
The arguments by the CSISD official for the proposal as laid out are specious and self
serving. The City manager admitted tome that the staff agreed to this layout only because
they had concerns about the City requiring -the street. I say if we do not have the guts to
require the street we need to get out of the planning business.
Lets. not make another mistake that will cost a bunch of dollars to fix in the future. (Bryan
just approved half a million to fix a similar problem.)
Thanks for your time.
Dick Birdwell
j N E -~ (n
~~~
~
j D
~
~
m1 ~. E
~
p , ._ _.__
_.._.
f ~ ~. ~!
rn ~~ r~~rw.i ~'~, ~-
_
~ ~ l 10'Olf fASE1ENT
,~,
~
~ ~ ~ I
~ -- OIV~ WAY PARENT LOOP --
~ ¢ Q
a a a a o 0
1 --- -
m
~
I I ~ ~ ~~ _
m
( I z
I
I ~
D ~ ~
D I ~ ~ D I I J m
m
N
p
~ ~ ~ (
n
m
r
to
~ ~
II
m
~
~ o ~ -, -
~
~
I o
z
~ r
1 ~
- J
o n
r~ Z
r ~ m
~m~
m
N
o
~
~N~
yc
m ~
rs
g ~^ ~ ~ n
~~ m
~N~ °
g ~ =
D O
~r O
;Zy
x
~
~~
T
V ~' •'
O ~ O~
ii
C
N
~ _ ~
~ ~
O m ~
~ ~ Z
D = rn
p ~ ~
m ~ p
n ~ D
~ N ~
~ m m
Z p
J
q ~;
1~~
U I~, ~ 0~ WAYPARENT LOOP ~ I
~ ~ ~~ ~~ I
~I ~ ~ L I ~ I
_~ I
~ ~ °v ~~
_1
I
~ ~ I
-.-.-.-.-. _..-.-.-.~-.._'_' I
~~'~ I.
AAy 2 ~ I 's
c SD p ~ I
~ I~
~ ~ ~ 0 I
- O =
g ~ I
m
~ I
m o ~ I
~ O p I
p Vf
z o m I
I
n
n
ii
U o
f'
'--_~/
iJ ~mmy.
~ / / ~~
// o
esa /
// o
~, / /
mZ2 ~"`~ // ~ ~
c~ rr7 / /
~mD ~ ~ /
~v,~ z 2 ~,
mA O
oomQ~ N ~ e
~ C1 s
o D °<
~~~ ~ ~°
g ~ N 3
e
o D~ ~~ ~° m
? Z n '°m a~ e <~
mZD ~.
°', `"g
t ~ ---I g
oNN
GTE COMMENTS
NOVEMBER 5, .1997
PRELIlVIINARY PLAT -COLLEGE STATION ISD, GRAHAM ROAD SCHOOL SITE;
PROPOSED PRELIlVIINARY PLAT TOTALING 49 ACRES INTO TWO A 0 ZONED LOTS
LOCATED ON THE SOUTHEAST SIDE OF THE INTERSECTION OF SOUTH GRAHAM
ROAD .WITH SCRAPPER ROAD (97-322)
GTE COMMENTS: REQUIRE A l0 FOOT PUBLIC UTILITY EASEMENT ALONG
GRAHAM ROAD.
IF YOU HAVE ANY QUESTIONS, .PLEASE CONTACT LAVERNE AKIN WITH .GTE
AT 409/821-4723.
APPLICATION FOR REVIEW. AND APPROVAL
PRELIMINARY PLAT
Master Preliminary Plat & Master Plan X Preliminary Plat-
Name of Subdivision College Station I . S. D. Graham Road School Site
***SUBMISSION OF THIS APPLICATION. IS NOT COMPLETE UNTIL
PLA1"I~ING FEES ARE PAID `AND ALL` REQUIREMENTS OF CHAPTER 9 OF
..THE CODE OF ORDINANCES (ORDINANCE #690) HAVE $EEN MET.* * *.
MINIMUM REQUIREMENTS:
L Filing.Fee of $200.00 _
2. Application completed in full.
3. Fourteen (14) folded copies of plat plus film positive of same drawn to a
scale: of not less. than 100 feet per inch. The words "PRELIMINARY
PLAT-NOT FOR RECORD" shall appear on the plat in letters 1/2" high.
Date of plat and dates of any revisions shall legibly appear on plat.
4, Master Development Plan
DEADLINE: Received in the. Planning Division bynoon 22 days prior to a Planning &
Zoning Commission .meeting held the first and third- Thursday of each month. Contact
Development Coordinator, Shirley Volk at .(409) 764-3570 for details.
***fee subject to change without notice***
O-~formslPlan~PRELAPP.DOC
'~ ,
P&Z Case No.
Date Received /O
Date Received
STAFF REVIEW NOTES
Graham Road School Site Preliminary Plat
Case #97-322
Ordinance Requirements:
_ Staff is currently scheduling a meeting with surrounding property owners in the area to
discuss future thoroughfare locations. The preliminary plat must address and comply with
the City's Thoroughfare Plan.
_ Staff recommends the applicant pursuing alternate plans. for sanitary sewer service to this
lot in addition to continuing discussions with the adjacent land owner. This would allow
the school district to continue with development .plans in case there is a delay with
negotiations with the adjacent developer and the deletion of the Graham Road Phase III
impact fee line.
_ Provide dimensions for each lot 1 and lot 2. (Provide a dimension and bearing for the lot
line between lots. l and 2.)
_ Show the approximate floodway limits of Lick Creek.
Note the right-of--way width ofGraham Road.
How will. public. utilities and public/ private access be provided to lot 2?
Comments/Concerns:
_ Coordinate the electrical service requirements with Electrical Operations Coordinator
Tony Mchalsky at (409) 764-3660:
_ Provide a 10' public utility easement along Graham Road for telephone .service.
Coordinate ..telephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723.
SUBMIT A MYLAR ORIGINAL AND 15 COPIES OF THE REVISED PRELIlVIINARY
PLAT BY WEDNESDAY, DECEMBER 10, 1997 TO BE INCLUDED IN THE PLANNING
AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY,
DECEMBER 18, 1997. THE CITY COUNCIL WII,L CONSIDER THE PLAT ON
THURSDAY,. JANUARY 8, 1997. BOTH MEETINGS WILL BE HELD AT 7:00 P.M. IN
THE CIT~iALL COUNCIL CHAMBERS AT `110.1 TEXAS AVENUE SOUTH..
cc: Bill Savage, CSISD
Bryan Tucker, .Cheatham & Associates
Planning Technician
November 7, .199?
, MIN__IMUM REQUIREMENTS FOR PRELIMINARY PLATS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED fi0 THE FOLLOWING:
1. Name & address of subdivider, recorded owner, planner, engineer and surveyor.
~r ^ 2.
,^/ 3.
~.
~ ,.
.Name. & address of all lenders on the property.
Name & address of all easement holders.
.Proposed -name of subdivision. (not spelled or pronounced similarly to any other subdivision
in Brazos County, Texas). '
Total area intended to be developed,
a. key map (vicinity map) not necessarily to scale.
® 6. Number of lots.
C9~ a.
~,
tea.
~9
~~~ ^ 10.
b.
number of lots by Zoning District.
average acreage: of each residential lot by Zoning District.
/~~~
t~ ~/~
Approximate area of street right-of--way.
Proposed.parkland.. dedication.
Requested oversize participation items, if any.
Proposed MASTER DEVELOPMENT PLAN which includes:
^ a. proposed land-.uses, including.: but: not limited. to street rights-of--way;
^ b. proposed zoning changes;
^ c. proposed drainage development;
^ d. proposed public improvements; including but not limtedto parks, schools, and
other publicfacilities;
^ e. proposed utility services (water and sanitary sewer).
~l~ ^ 11. IlVIPACT STUDIES (traffic, electric, water, sewer and drainage) quantifying :the increased
demands that will be placed on the system as a result of the proposed development, including
areas not designated for immediate development.
~~^ / 12. Application fee.
4d" 13. Preliminary plat drawn on 24" x36" sheets at a scale of not less than n 100 feet per inch. and
including the words "PRELIlvIINARY PLAT -NOT FOR RECORD" in letters ll/2" :high.:.
(When more thanone sheet is necessary to accommodate the entire area, an index sheet at
appropriate scale showing the'entire area shall be attached. (Il~CLUDE DATE THE PEAT
WAS SUBMITTED AND THE DATES OF ANY REVISIONS ONTHE PLA=I~.
14. Name of contiguous subdivisions and names of owners of contiguous parcels of a~nsubdivided
- / land, and an indication whether or not contiguous properties are platted.
(9" 15. Descriptions by metes and bounds of the subdivision which shall close within accepted land-
survey standards. .
o~
d
~/~ o
~(k
16. Primary control points or descriptions and ties to such control point, to which, all dimensions,
angles bearings, block numbers, and similar. data shall be referred (later). The plat shall be
located with respect to a corner of the survey or tract, or an original corner of the ®riginal
survey of which it is apart.
17. .Subdivision boundary lines indicated by heavy lines.
18. Location of the One Hundred Year Floodplain according to the most recent available
information.
19. Date of preparation, scale in feet and north. arrow.
20. Topographical information, including contours at 2 foot intervals, flow line elevation of
streams, and wooded areas.
21. Location, approximate dimensions, descriptions and name of alL proposed streets, alleys,
drainage structures, parks or other.public areas, reservations,. easements or other nghts-of-
way, blocks, lots and other sites. within he subdivision..-
22. Proposed .drainage channel cross sections, if any.
23. Exisfing and/or. proposed. well site locations.
24. A number or letter to identify which lot or site and each block.
25. Location of current city limits line and current zoning district boundary.
26. Ultimate. primary system destination of storm water fora distance. of at least one quarter.
mile down stream and possible storm sewer, water, gas, telephone,-cable televisi®n, and
electric. and. sanitary sewer connections.
27. All treets must be continuous or end in a cul-de-sac.
28. Indicate any variances requested and reasons. for same.
;~-~~-
~,~~~-~
E ~~
____
___
___ ~~_
_. ~ 4
L~
J
`~
°i
I
CHEA`I`HAM
AND
ASSOCIATES
November 17, 1997
College Station LS.D.
Construction. Services
.Attn: Mr. Bill Savage, P.E., Construction Mgr.
1812 Welsh Street
College Station, TX 77840
Re: Proposed Sanitary Sewer Line for Graham Road
New Intermediate School Along the South Fork of Lick Creek
Mr. Savage:
We are please with the prospect of providing engineering services for the sanitary sewer line
coordination between the School-District and. the City of College Station. We are currently
.preparing a proposal :for these services and wish to clarify and confirm the following from the
meeting on November 12~':
1. We understand that we are to act as a liaison between the School District and the
City in regards to adjustment of the Graham Road impact fee area.
2. We understand that we are to assist in the coordination of a developer's agreement
between the School-District and the City for the upsizing of the sanitary sewer lme.
3. We understand that we are to design the sanitary sewer from the Spring Brook
Subdivision, hrough the .School District's property, and then onto Mr.
Szabuniewicz's property,:and then up tp Graham RRoad, per Mr.-Szabuniewicz's
preliminary alignment.
4. We understand that our proposal is to be based on the figures provided by Mr.
Szabuniewicz at the meetmg on November 12tH
5. We understand-that you will pursue negotiations -with the City in regards to .
payment for.additional excavation due to the_upsizing of the sanitary sewer lme.
6. We will also coordinate with the City as to which lift station services .our basin, and
if any upgrades of that lift station will be necessary.:
W;; v~ill av~ait your v.~ritten confirtnati;<r. to Proceed since it apre~red ut:at l~~Ir. Szwbare:~.~icz
authorized his engineer. to .proceed.. at the November' 12t'' meeting.. If Mr. Szabuniewicz s plan fails
to materialize, we stand ready to assist the School District.' Please call us if you have any
questions.
Sincerely
B C. Tucker
F:\W ORD\COLLEGE\207\ss.line.wpd
cc: Mr. Jeff Kalista, VLK Architects
Mr. Steve Aloway,-VLK Architects
Mr. Kent Laza, P.E., City of C~lle~e Station ,
Ms. Veronioa J.13. I~norgan. P.I?., Clt~ cif College Station
Dawia I~layes, Cllcathaan cS~. AsSOCiatcs
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836• Fax 817/265-8532
CHEATHAM
AND. ~,
ASSOCIATES
.November 17, 1997
College Station LS.D.
Construction Services
Attn: Mr: Bi11 Savage, P.E., Construction Mgr.
1812. Welsh
College Station, TX 77840
Re: Research-of the.Potential Benefits of a
Drainage Detention Facility forth raham Road
School Site as proposed by John S eveloper
Project No. 1019-207
Mr. Savage:
It is our pleasure to provide the School District with the information it-needs to ascertain the
potential benefits of a privately constructed and maintained drainage detention facility located on
the School District's Graham Road New School Site. For the purposes of our. research, we wish
to confirm the following:
1. We understand that Mr. John Szabuniewicz, a developer of the adjacent property
south of the Graham Road Site, has agreed to sign an agreement with the School
District stating that he and his engineer will design, construct and maintain a
detention pond if the School District donates the land.
2. We understand that, for the purposes of our research, the size and capacity of this
detention ppond is to be based on Mr. Szabuniewicz's detention needs. as well as
the school sites ultimate developed condition (i.e. including the future school).
3. We again wish to relayy that per Ms. Veronica Morgan, P.E., assistant city
engineer, the City of Colle e Station has no interest m maintaining a dedicated
regional :detention facility for this site at this time.
4: We also understand that this issue must be discussed and approved by the school
board before any formal agreements or proposals are drafted.
Upon receipt of written confirmation regardingg the above mentioned statements, we will proceed
with the determination of the. sizing needs of the detention pond. Please call us if you have any
comments or questions.
Sincerely,
Brya :Tucker
F:\WORD\COLLEGE\207\Drainage Facility.wpd
cc: David Mayes, Cheatham & Associates
Jeff Kalista, VLK Architects
Steve Alowav. VLK Architects
Vcroni~a J.13. i~~or~~~iu, P.L., Cit_~ of C~~11egeStation
J~lui Szab~uiic~~~icz, Licl; Crceh Develupers,-Inc:
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
.1601 E. Lamar. Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
Oct-2c^.-97 02:40P
.~
Pe01
Cheatham 8~ Associates
Engineers • Planners • Surveyors
Phone Noo 817/548-0696
Fax No. 8171265-8532
DATE:
TO:
COMPANY:
FAX NO: (1-(04) ~7~ ~ - 3 ~ Q o -
rROM: ~rvart luc.~Ce/'`
C&A JOB NO: ! o q - ZD ~7 ~Z 2~. ~ a-+n boa c~ ~ ~A 1~ ~
NUMBER OF PAGES INCLUDING COVER SHEET: -~
/1 _ /1 ,. n
No Copy to Follow Certified Mail
I~ard Copy to F~ ollow via First Class Mail Uverni~ht llelivery
Messenger
PLEASE NUPE: If you did not receive all of the pages, please contact the sender at 8171548-0b9b as soon as
possible.
Cheatham & Associates
Ib01 E. Lamar Blvd., #2t)0
Arlington, TX 7b011
MESSAGE (IF ANA):
oct-2~-9~ oz:4oP P.oz
°~- ~~
~~
~'
,~
4 ~;
~~ ,
I:: .....
,:,
tti
ti ~ h f , ~ ~ ~' ~~ t ~ ~ _
h _ ~ t: ~ ~ 1~:..
t ~ ' ,~ _ Q
rr + ~ `~
l t
l ~ "'
f im,i
LL,~-,,,. i l~' .. ~ -
i
i `\\ ~ ~` 1 'r r , ` ~ i ~ iI `J ~ 1 l
~ ._
l t ' ~
.~
~ v) ti ~~~ ;~, ¢
t
~ ti
t ~n
`~ , f
O ~ t tL ~ • ;.,t, 5 ~ l
} `i.
~ ~i
.. ; ,
', :.; ,..
~ ~~
+ ~ l ~ ~ ,
• ~ J /
i 1 1
~ 1, ,.. l ~ ~'~.
o a ~ - ~.~
.• ~ _ • ~. ji1l • I ` ~ •
u,
~'
I'.
'~/ 4
i
•
I
~,
i
t
~1
~' ~ t
--~ ` ' ° $ _
\-` \~; ~ cn --
~~ ~ t
~ < < _.~..~......... t ,iE,
~ t
~ ~ ...~
J l
Oct~21-97 11:02A ~
~~ ~
~~
~ ~
'~, ~
~ ~~ ~~
o
~ ~, ~
~~ ~~~~'
4: /~ ~~
C!~' .~.
~ -: ~}
`~ ~ -
~ ~'~ ,:,
,i
~ ( •~
t ~
_ ~
0 ~ ~ ~ N 4~ I ` q t ~~
'• Q •
;'i•
1 ~ i-~'a
~ /'
i rr- ~ /~
_ ~ ` • .i
~C/ ~ ~i'.
YY •`C/ ~I ti
~ ~. ~ ~ ~ •
S .. \ .,
• ` N. 1 ~~ ;
~ ~ s Q '..,
~. ~ ~' _ •-
,~"";~.
~•~~ U ~
• I=
• ,• ~ , i ~ i
l ` j e ~` 4
CHEATHAM
AND
ASSOCIATES
October 15, 1997
~I~ 3~`~
College. Station LS.D.
1812 Welsh Street
College Station, TX 77840 ~
Attn: Mr. Bill Savage, P.E., Construction
Re: Graham Road New Irate ediate School Propos
Regional Detention F cility
Project No. 1019-207
Mr. Savage:
This letter is to advise you of the City of College Station's opinion regarding the above
mentioned detention facility. In a telecom with Veronica Morgan, P.E., I was told that a city
maintained detention facility was not vital at the new school site. However, Ms. Morgan stated
that it might be beneficiaLfor the local;landowners. She wished to express that, at this-point in
time, the. City would not be interested in maintaining such a facility. She stated. that the
maintenance and upkeep of such a site would be the responsibility of either College Station
I.S.D. or the people who build it.
I wish to .confirm whether the donation of land for such a facility on the Graham Road site is, or
is not, the course of action the School.District wishes to pursue. Please call me and advise.
Sincerely,
Bry .Tucker
F:\WORD\COLLEGE\207\prop:regional.detention.facility.wpd
cc: Steve Aloway, VLK Architects
Veronica J.B. Morgan, P.E., City of College Station
John Szabuniewicz, ..Developer
.David Mayes, Cheatham & Associates
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm. of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite- 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
October 8, 1997
College Station LS.D.
Construction'Services
1812 Welsh Street ~~
College Station, TX .77840
Attn: Bill. Savage, P.E., Construction Manager
Re: Graham Road New Intermediate School ~Q.,1•,,
Sanitary Sewer and Dedication of a Regional.Detention Facility ~^ ^^ ~` S ~ -J~'~'
Project. No. 1019-207 'vX ~ ~, ~.
Mr. Savage:. -/
J` ~"`~ ~
Upon consulting with John Szabuniewicz and Martin Riley, P.E. regarding the. above mentioned T
issues, we wish to confirm our course. of action with College Station I:S.D. Mr. Szabuniewicz J
stated that, upon consultation with the City of :College Station, he is prepared to move forward ~
with the design of the sewer line.. He stated that the City has agreed to pursue a Developer's ~
.Agreement wherein they will only pay :the cost of upsizing the sanitary. sewer line from an 8 inch.
line to a 12 inch or 15 inch line. ` At this ime, this resolution appears to be acceptable to Mr.
Szabuniewicz. We have consulted with Martin Riley, PE., who is contracted by Mr.
'Szabunewicz to design the sewer ine, to coordinate our projects.
In regards to a regional detention facility possibly being constructed on the Graham Rd. School
tract, Mr. Szabuniewcz stated that, upon consultation with you and`the City, it would be
agreeable to him that he pay for and have Riley Engineering Co. design the re tonal detention
facility if the land was donated by College Station LS.D:~ t CCU ~''~~"
If these courses of actionare acceptable to College Station LS.D:,_please pursue the relevant W,ts`~.~
agreements between-the School District, developer and the City. We also wish to request written c
confirmation that these courses cif action are vnrrect: WP are availahlQ to ~~ssist :=rith t?~ese sssues Q
in any way possible. Please callus ifyou have any questions or comments.
Sincerely,
Bry C. Tucker
F:\WORD\COLLEGE\207\ss.dedication.wpd
cc: Steve Aloway, VLK Architects
Veronica J:B. Morgan, P`:E., City of College ..Station
John Szabuniewicz; Developer
Martia Riley,' P.E., Riley Engineering Co,
David Mayes, Cheatham & Associates.
ENGINEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696.• Metro 265-8836.• Fax 817/265-8532