From: Jane Kee
To: SVOLK@CITY OF COLLEGE STATION.CITY HALL,
Date: 8/21/97 3:59PM
Subject: Wheeler plat & zoning -Reply
I would agree with you except there. will need to be some cross parking agreemnt or something since
there 'are 2 separate lots involved. So we_don't end up with a motel that doesn't have sufficient parking
or vice versa. I think the configuration can change slightly as long as the 2.5 acres. stays the same.
That's what CC was told.
»> Shirley Volk 08/2.1/97 02:42pm »>
Steward called me today and asked how important it is for them to have exactly the area zoned C-B that
they showed on the site plan. at Council. I said they couldn't change it by much for sure, and I'm not sure
they can change it at aII. Then while we talked, it appeared they might want to reconfigure their site plan
slightly and if they do, they won't be able to get all the building. and required parking in the 2.S acres they
asked to be rezoned. 1 told him. that lof lines don't necessarily have to #ollow zoning lines, and since the
office building and the motel buildings will all be sharing parking, some,of the required parking can be on
the office building site. He thought that would work. I told him that t would run this by you to make sure
it will be o.k. You might want to talk to him personally because sometimes meanings change "with the
telling! Stewart's number is 846-6212.
Shirley.Volk -.Water lme extension as a part of the Wheelerreserve on the West side of Gncoln at Urnversity . ..... ....... r: ___: Page 1
~~~
~~
From: Paul Kaspar ~~~ ~/~~/~~Q_s-
To: Bill Riley ~y/ ~~~ , /~
Date: 1/29/98 247PM /~' N
Subject: Water line extension as a part of the Wheeler reserve on the West side of Lincoln at
University
Bill,
We want to keep you up to date with decisions .like these.
Veronica and I have taken a nook at the water system in the general vicinity of the property and there
appears to be na need of any further looping of our distribution system. (The existing system is looped
with a combination. of 12 thru 20 inch lines.:) At this point, Kling engineering is proposing to extend water
service .along the frontage pf University from the .east side of Lincoln. When they preliminary plat that
8 acre reserve tract, they will probably be asking for a variance o not extend the water .line all the way to
Quality Suites' property since QS already. has water service from an existing 12" line along the access
easement that_serves Cedar Creek Condos.
FYl from Stewart.Kling:
The preliminary. plan at this point for that particular property is to split it in half (perpendicular to
University). with an access.. easement that will continue thru to Lincoln. Then the western most half will be
divided such that a 2 acre lot (Hotel) will be along the frontage of University and the remainder extending
back to Lincoln.