Loading...
HomeMy WebLinkAboutMinutesPRESUBMISSION CONFERENCE REPORT August 8, 1997 TO: Michael K. Davis, Regency Parkway 1005 East. Bypass, College Station, TX 77840 Stewart Kling, Kling Engineering 4103 Texas Avenue, Suite 212, Bryan, X 7780: FROM: Presubmisson Conference Jane Kee, Senior Planner .Kent Laza, City Engineer l -'~ James Massey, P&Z Chairman ~~ Others. Attending Natalie. Thomas, Planning Technician Shirley Volk, 'Development Coordinator Ray Havens, Electrical Superintendent Laverne Akin, GTE Representative SUBJECT: Master .Plan. & Preliminary Plat of Greensworld .Subdivision; proposed master plan: of approximately 110 acres divided into two commercial lots located on the southeast corner: of the East Bypass and University Drive. There is also a preliminary--plat of Phase Three' of the Greensworld Subdivision that includes 2.94 -acres and one commercial. lot. (97-310 & 97-314) A Presubmission Conference meeting was held Wednesday, August 6, 1997 to discuss the above mentioned master plan and preliminary. plat. The following is a list of ordinance requirements .identified by the Presubmission Conference. This list does not. relieve the applicant of total compliance with all eurrent ordinance requirements. MASTER PLAN (109. S ACRES) Ordinance .Requirements: Correct the zoning note pertaining to lot 1, -block 1 of Greensworld Phase Three. _ Change "Farm to Market Road No. 30" to "State Highway No. 30". Comments/Concerns: _ Coordinate electrical details with. Electrical. Operations Coordinator Tony Michalsky at (409) 764-3660. _ Coordinate telephone service. details with G.T.E. Representative Laverne Akin at (409) 821-4723. PRC Report Greensworld Case #97-31 D & 314 Page 2 of 2 PHASE THREE (2.94 ACRES) Ordinance Requirements: _ Correct the floodplain and floodway locations. (The floodplain cannot cross over the floodway.) Show the distance to the State Highway 6 gore for driveway location deternunation for lot 1 Make the following changes to the proposed 18" waterline: Note that a new blow-off will be required at the northernmost point of the line. Show anew 18" valve where it connects to the existing line. Comments/Concerns: _ Coordinate. electrical details with Electrical Operations Coordinator Tony Michalsky at (409}.764-3660. Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT THE MYLAR ORIGINAL. AND 1O COPIES OF THE REVISED MASTER PLAN AND PRELIIVIINARY PLAT BY WEDNESDAY,. AUGUST. 13, 1997 TO BE INCLUDED IN THE PLANl~TING `AND ZONING- COMNIISSION PACKETS. FOR THE MEETING ON THURSDAY,. AUGUST 21, 1997 AT` 7:00. P.M. AT THE COLLEGE STATION CONFERENCE CENTERAT 1300 GEORGEBUSH~RIVE.