HomeMy WebLinkAboutMinutesPRESUBMISSION CONFERENCE REPORT
August 8, 1997
TO: Michael K. Davis, Regency Parkway
1005 East. Bypass, College Station, TX 77840
Stewart Kling, Kling Engineering
4103 Texas Avenue, Suite 212, Bryan, X 7780:
FROM: Presubmisson Conference
Jane Kee, Senior Planner
.Kent Laza, City Engineer l -'~
James Massey, P&Z Chairman ~~
Others. Attending
Natalie. Thomas, Planning Technician
Shirley Volk, 'Development Coordinator
Ray Havens, Electrical Superintendent
Laverne Akin, GTE Representative
SUBJECT: Master .Plan. & Preliminary Plat of Greensworld .Subdivision; proposed master
plan: of approximately 110 acres divided into two commercial lots located on the
southeast corner: of the East Bypass and University Drive. There is also a
preliminary--plat of Phase Three' of the Greensworld Subdivision that includes 2.94
-acres and one commercial. lot. (97-310 & 97-314)
A Presubmission Conference meeting was held Wednesday, August 6, 1997 to discuss the above
mentioned master plan and preliminary. plat. The following is a list of ordinance requirements
.identified by the Presubmission Conference. This list does not. relieve the applicant of total
compliance with all eurrent ordinance requirements.
MASTER PLAN (109. S ACRES)
Ordinance .Requirements:
Correct the zoning note pertaining to lot 1, -block 1 of Greensworld Phase Three.
_ Change "Farm to Market Road No. 30" to "State Highway No. 30".
Comments/Concerns:
_ Coordinate electrical details with. Electrical. Operations Coordinator Tony Michalsky at
(409) 764-3660.
_ Coordinate telephone service. details with G.T.E. Representative Laverne Akin at (409)
821-4723.
PRC Report
Greensworld
Case #97-31 D & 314
Page 2 of 2
PHASE THREE (2.94 ACRES)
Ordinance Requirements:
_ Correct the floodplain and floodway locations. (The floodplain cannot cross over the
floodway.)
Show the distance to the State Highway 6 gore for driveway location deternunation for lot
1
Make the following changes to the proposed 18" waterline:
Note that a new blow-off will be required at the northernmost point of the line.
Show anew 18" valve where it connects to the existing line.
Comments/Concerns:
_ Coordinate. electrical details with Electrical Operations Coordinator Tony Michalsky at
(409}.764-3660.
Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723.
SUBMIT THE MYLAR ORIGINAL. AND 1O COPIES OF THE REVISED MASTER PLAN
AND PRELIIVIINARY PLAT BY WEDNESDAY,. AUGUST. 13, 1997 TO BE INCLUDED IN
THE PLANl~TING `AND ZONING- COMNIISSION PACKETS. FOR THE MEETING ON
THURSDAY,. AUGUST 21, 1997 AT` 7:00. P.M. AT THE COLLEGE STATION
CONFERENCE CENTERAT 1300 GEORGEBUSH~RIVE.