Loading...
HomeMy WebLinkAboutMinutesPROJECT REVIEW. COMMITTEE REPORT July 31, 1997 TO: Callaway Development Company 1250 N.E. Loop 410, Suite 800, San Antonio, Texas 78209 North Barden, Municipal Development .Group 203 Holleman Drive East, C lege Statipn, .Texas 77840 ,~ FROM: Project Review Committe Jane Kee,. City Planne Kent Laza, City Engineer Others Attending Steve Homeyer, Assistant to the City Engineer Debra Charanza, Senior Secretary Tony Michalsky, Electrical Operations Coordinator Shirley Volk, Development. Coordinator Laverne Akin, G.T.E. Representative SUBJECT: Preliminary Plat -Callaway Subdivision; proposed subdivision totaling 3.5 acres divided into one multi family zoned lot on the southwest corner of Marion Pugh and George Bush Drive. (97-313) A Project Review Committee meeting was held on Wednesday,. July 30, 1997 to discuss the above mentioned conditional use permit request. The following is a list of ordinance requirements identified by the Project Review .Committee. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Site Plan Related.• How do you plan to get sewer to the subject property? Provide a metes and bounds description of the property. _ The waterlines shown along Olsen Drive belong to Texas A&M University. Water must be extended along Goerge Bush Drive from an existing City of College Station line to service the property. Show this extension on the preliminary plat. (Clearly designate TAMU water lines.) _ Complete the "SiteBenchmark" general note. _ The developer will be required to analyze .the channel to determine the elevation of the floodplain for the final plat. Verify that. the right-of--way line shown along Marion Pugh Drive is correct. PRC Report Callaway Subdivision Case #97-313 Page 2 of 2 _ Staff had questions concerning the property along Marion Pugh Drive and the .volleyball sand pit. The notes state."apparently". _ The front setback variance. request on the application must be granted. by the Zoning Board of Adjustment... Coordinate. application submittal and scheduling with Development Coordinator Shirley Volk at (409) 764-3570. _ Parkland dedication requirements must be addressed with the site plan Fee will be collected prior to the issuance of a building permit. Comments/Concerns: Coordinate .electrical service details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. _ Coordinate telephone service details with G.T.E. Prepresentative Laverne Akin at (409) 821-4723. SUBMIT THE MYLAR ORIGINAL AND l 5 COPIES BY WEDNESDAY, AUGUST 13,1 997 TO BE-INCLUDED IN THE PLANNING AND ZONING CONMSSION PACKETS FOR THE MEETING ON THURSDAY, AUGUST Z1, 1997 AT 7.:00 P.M. AT THE COLLEGE STATION CONFERENCE CENTER AT 1300 GEORGE BUSH DRIVE.. THE CITY COUNCL WII.,L CONSIDER THE PRELIlV1INARY PLAT ONTHURSDAY, SEPTEMBER 11, 1997 AT 7:00 P.M. AT THE CITYHALL COUNCIL ROOMAT 1101 TEXASAVENUE SOUTH.