Loading...
HomeMy WebLinkAboutMinutesPRESUBMISSION CONFERENCE REPORT July 25, 1996 TO: Phyllis Hobson, Nantucket, Ltd. 1502 Nantucket Drive, College Station, TX 77845 Larry Wells, Municipal Development Group 203 Holleman Drive East,. College Station, TX 77840 FROM: Presubmission Confere , I ,~ Jane Kee, City Pl er Kent Laza, City Engin r Ron Silvia, P&Z Repr sen tive Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Tony Michalsky, Electrical Operations Coordinator Laverne Akin, GTE Representative SUBJECT: Master Preliminary Plat -Nantucket & Leisure Island; proposed preliminary plat of Nantucket Phases 6 - 12 and Leisure Island Phases 1 - 3 generally located on the southwest corner of Nantucket Drive and State Highway 6 totaling 65.26 acres divided into 152 residential lots. (97-3I2) A Presubmission, Conference meeting was held Wednesday, July 23, 1996 to discuss the above mentioned preliminary plat.. The following is a list of ordinance requirements identified by the Presubmission Conference. This'lst does not relieve the applicant of total compliance with alY current ordinance requirements. Ordinance Requirements: _ Clearly distinguish the current city limits line. Submit an impact. study for the sanitary sewer oversize participation request. Include a north arrow for the platted area as well as the vicinity map. Indicate the basis of bearing for the survey. _ Approval of the Master Preliminary Plat. will. be conditioned upon successful rezoning. _ Provide sidewalks along one side of all. streets except Mariner's Cove, Wayfarer Lane and Beacon. PRC Report Nantucket Case #97--312 Page 2 of 2 Ordinance Requirements (cont.: How will drainage be handled throughout the subdivision. More specifically: Across lots 8 and 9 of Phase 12. Across lot 15 in Phase 8. Across lots 4 and 5 of Phase 9. _ Note the type of easement proposed between lots 8 and 9 of Phase 10. _ ° Show. the proposed pedestrian access from Sconset Cove to .eventually-allow access to Nantucket Drive. Submit a revised master plan of the Nantucket Subdivision. Comments/Concerns: _ Street lights must be installed to City of College Station :standards. Coordinate street lights and electrical details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT THE MYLAR ORIGINAL AND 15 COPIES BY WEDNESDAY, JULY 30, 1997 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING ON THURSDAY, AUGUST 7, 1997 AT 7:00 P.M. AT THE COLLEGE STATION CONFERENCE CENTER AT 1300 GEORGE BUSH DRIVE. THE -CITY COUNCIL. WILL CONSIDER THE MASTER PRELIlVIINARY PLAT ON THURSDAY, AUGUST 28, :1997 AT 7:00 P.M. AT THE COLLEGGE STATION UTILITY SERVICE CENTER AT 1601 GRAHAM ROAD.