Loading...
HomeMy WebLinkAboutMinutesAGENDA ITEM N0.3: Consideration of a final resubdivision plat of lot 4 of the Culpepper Plaza Addition Subdivision. (96-213) City Engineer Laza presented the. staff report and stated that the subject property is located between Dominik Drive and Harvey Road on the west side of Kyle Avenue South. The purpose of this plat is to subdivide 10.02 acres into six C-1, General .Commercial lots in order to rectify illegal subdivisions that have taken place since. the property was originally platted in April of 1975. A Presubmission Conference was held on February 12, 1997 and several comments were addressed at that meeting. Staff recommended approval of the final plat with the condition that all Presubmission Conference comments are addressed prior to filing the plat for record. Commissioner Smith moved to approve a final resubdivision plat of lot 4 of the Culpepper Plaza Addition with the staff recommendations. Commissioner Garner seconded the motion which passed unopposed (7 - 0}. AGENDA ITEM NO.4: Consideration of a master preliminary plat of the CSL of Tezas, Inc. .Addition located near the northeast corner of the intersection of Sebesta Road and State Highway 6 Frontage Road. (97-305) City Planner Kee presented the staff report and stated that. the property in this master. plat is currently zoned for C-1 Commercial and M-1 Planned Industrial development. This master preliminary plat is being presented in anticipation of development of 3.5 acres (lot 2). This master plat incorporates what was a platted lot in the adjacent T.J. Addition and includes a large 35.8 acre lot for which there are presently no development plans. Lot 1 is a small 1.1 acre lot. The master plat shows the future location of a new collector roadway that would .extend. from Emerald Parkway to Sebesta as part of lot 3. The idea for this roadway was developed as a' solution to .the cut-through traffic problems Emerald Forest has faced over: the years since the Frontage Road was converted. to one-way. This will allow north- south. movement between Emerald Parkway and Sebesta without traffic traveling through the neighborhood. This roadway will not be built until lot 3 is ready for development. The developer of lot 2 will be asking the Council, through a development agreement, to delay. the construction of any sewer infrastructure through lot 3 to lot 2. The proposed use on lot 2 does not have any significant sewer demand. Staff recommended approval of the plat with presubmission conference notes, with the condition that either a development agreement be approved by_Council addressingthe..timing of sewer extension or the infrastructure'be constructed with the first final plat and with the discretion to apply streetscape'reserved until site plan development. Commissioner Gribou moved to recommend approval of the master preliminary plat of the CSL of Texas,' Inc.. Addition with staff recommendations. Commissioner Lightfoot seconded the motion which passed unopposed (7 - 0). AGENDA ITEM NO. S: Discussion of gated communities. City Planner Kee stated that the purpose of this agenda item is to bring to the City Council's attention what appears to be a significant trend that could impact future development patterns. in our community. The concept of gated communities was discussed a few months. ago in the Sunday magazine that comes with The Eagle. At that same time, staff was discussing the possible gating of a street in a newly developing subdivision with a local developer. P & Z Minutes May 1, 1997 Page 4 of 6 ;,.. w ~, PRESUBMISSION CONFERENCE REPORT April 18, 1997 TO: C.S.L. of Texas, Inc. P. O. Drawer 433; Bryan, TX 77806 Don Garrett, Garrett Engineering 4444 Carter Creek Parkway #108, Bryan, TX 77802 William D. Farrar, United Properties Group, Inc. P. O. Box 10888, College Station, TX 77842 FROM: Project Review Committee ~~ Jane Kee, City Planner Kent Laza, City Engineer Others Attending Natalie Ruiz, Planning Technician Shirley Volk, Development Coordinator Jon Mies, Fire Marshal Tony Michalsky, Electrical: Operations Coordinator Laverne Akin, GTE Representative SUBJECT: Preliminary Plat - C. S. L. of Texas, Inc.. Addition; proposed subdivision totaling 41.81 acres generallq located on the. northeast corner of Sebesta Road and the State Highway 6 Frontage Road divided into three C-1 zoned lots. (97-305) A Presubmisson Conference meeting was. held Wednesday, April 16, 1997 to discuss the above mentioned preliminary. plat. The following is a list of ordinance requirements. identified by the Presubmission Conference: This list does not relieve the applicant of total compliance with all current ordinance .requirements.. Ordinance Requirements: _ Clarify the title block to better describe the property. (Reference the replatting of the lot in the T. J. Addition -not the J. C. Addition as shown on the plat.) _ Modify the title block so that it reads "Master Preliminary Plat Not For Record". _ Show how sanitary sewer will be extended to all lots. Provide a basis of bearing for the survey. _ Does floodplain exist on the property? If so, show the boundary.. If not, provide a general note. _ Clarify what is happening with lots 1 and 2. There are .several lot .lines shown and it is confusing to determine which ones are proposed and existing. 0 PRC Report CSL of Texas Addition Case #97-305. Page 2 of 2 Ordinance Requirements (cont.): Remove the building setback lines. _ Streetscape will be required at the time of site plan review along the East Bypass. The Commission has the discretion to require Streetscape along:. Sebesta Road. _ Show the alignment of the new "AMS" street including the connection to Emerald Parkway.. (This canoe shown. on a separate drawing.) _ Provide a public. utility easement along the north side of Sebesta Road to cover the existing overhead electric lines and: the proposed sanitary sewer line. Comments/Concerns: _ Coordinate electrical service details with Electrical Operations Coordinator Tony Michalsky at {409) 764-3660. _ G.T.E.-has copper and fiber along the Frontage Road in the stateright-of way. Please call 1-800-344-8377 for a locate before any digging. Coordinate telephone service details and necessary easements with G.T.E. Representative Laverne Akin at (409) 821-4723. _ Coordinate gas service details with Lone Star Gas Representative David borough at (409) 776-0627. SUBMIT THE MYLAR ORIGINAL AND 15 COPIES OF THE REVISED PRELIMINARY PLAT BY WEDNESDAY, APRIL 23, 1997 TO BE INCLUDED IN THE .PLANNING & ZONING COMIVIISSION PACKETS FOR THE MEETING OF THURSDAY, MAY 1, 1997. THE CITY COUNCII, WILL CONSIDER THE PRELIMINARY PLAT ON THURSDAY, MAY 22, 1997. BOTH MEETINGS WII.,L BE HELD-AT 7:00 P.M. IN THE CITY HALL COUNCII, ROOM AT 1101 TEXAS AVENUE SOUTH. STAFF PRC REPORT C.S.L. of Texas, Inc. Addition Case #97-305 Ordinance Requirements: _ Clarify the title block to:better describe the property. (Reference the replatting of the lot in the T. 7. Addition-not the 7. C. Addition as shown on the plat.). _ Modify the title block so that it reads "Master Preliminary Plat Not For Record". Show how sanitary sewer will be extended to a111ots. Provide a basis of bearing for the survey. Does floodplain exist on the property? If so, show the boundary. _ Clarify what is happening with lots 1 and 2. There are several lot lines shown and it is confusing to determine which ones are proposed and existing. Remove the building. setback lines. Streetscape requirement? _ Show ..the alignment of the new "AMS" street including the connection to Emerald Parkway. (This can be shown on a separate drawing Is oversize',participationrequested as part of this preliminary plat? Comments/Concerns: _ Coordinate electrical service details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. _ Coordinate telephone service details and necessary easements with G.T.E. Representative Laverne Akin at (409) 821-4723. _ Coordinate gas service details with Lone Star Gas Representative David borough at (409) 776-0627. SUBMIT THE MYLAR ORIGINAL AND 15 COPIES OF THE REVISED PRELIlVIINARY PLAT BY WEDNESDAY, APRIL 23, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMIVIISSION PACKETS FOR THE MEETING OF THURSDAY, MAY 1, 1997. :~ /~~~~~ Regular Item 'Consent Item ® Statutory Item Item-.Submitted By: For .Council Meeting Uf: Director Approvals City Manager Approval• Steve Homeyer. Assistant to the City En>rineer Mav 22 1997 Item: Consideration of a 41.81 acre master preliminary plat (C.S.L. of Texas, Inc. Addition) :dividing the property generally located on .the northeast corner of Sebesta Road and the State Highway 6 Frontage Road into three commercial-lots and Consideration of a Development Agreement delaying the installation of ewer infrastructure. (Planning Case No. 97-305)- Item Summary: Property in this master-.plat is currently zoned for C-1 commercial and M-1 Planned Industrial development. This master preliminary plat is being presented in anticipation of development of 3.5 acres (lot 2). This master plat incorporates what was a platted lot in the adjacent T.J. Addition and-includes a large 35.8 acre lot for which there are presently no development plans. Lot 1- is a small 1.1 acre lot. The master plat shows the future ovation of a new collector xoadway that would extend from Emerald Parkway to Sebesta as part of of 3. The idea:.for this roadway was developed as a solution to the cut-through traffic. problems Emerald Forest has faced over the years since the Frontage Road was :converted to :one-way. This -will allow north-south movement between Emerald Parkway and Sebesta without traffic traveling through the neighborhood. This roadway will not be built until lot 3 is ready for development. The developer of lot 2 will be asking the Council, through a development agreement, to delay the. construction of any sewer infrastructureahrough lot 3 to lot 2: The proposed use on lot 2 does not have any>significant sewer demand. Since this development comprises 3.5 acreswhich;represents approximately nine percent: (9%) of the total area of the preiitninary plat, the developer is unable to financially support the construction of the sewer line in its entirety. For this reason, .the. developer is requesting the opportunity to financially guarantee his portion of the sewer line at this time in the amount of Twelve Thousand One Hundred Thirty Dollars ($12,130.00). The timing of the sewer line construction would be at the City's discretion. The development agreement would allow the developer to install a "private" septic system for this development, but would require him<to connect to a "public" sewer line whenever it becomes available: The agreement would also require o:\group\de~e_ser\cvsht\97=305doc the developer to construct the entire sewer line if there is ever an expansion to or a change in use that would increase the sewer demand beyond that of amini-storage facility. Policy Issue,Statement:- Transpoxtation Mobili - Citizens benefit from the ability to move into, out of, and within Cohege Station in a afe and efficient manner. Civic Pride -Citizens benefit from well-planned, attractive :residential and commercial areas,: and from preserving historic areas, BudgetaryfFinancal Summary: Staff Recommendations:... Approval with presubmission conference- notes, with the condition that either a development agreement be approved by Council: addressing the timing of sewer extension or the infrastructure be constructed with the first final plat andwith-the discretion to apply streetscape reserved until site plan development. City Attorney Recommendation/Comment: Related Advisory. Board :Recommendations: P&Z voted unanimously to recommend approval with the condition that the City either approve a development agreement delaying :sewer infrastructure. construction or that the sewer line be built with this plat, and with the requirement that streetscaping be required along Sebesta as-well as the By-Pass but to defer planting until site .development. Approval was also made with all presubmission conference notes. Council Action Options Approve plat as shown, with-conditions or deny plat: Supporting. Materials:' 1. Location Map 2. Application 3. Engineering Information and Notification Information 4. Presubmission Conference Report 5. P&Z Minutes of 5-1-97 oagroup\deve_ser\evsht\97-305.doc ENGINEERING Water: Water is available through existing lines that will be extended into this property. Sewer: Sewer is available through existing lines that will be extended into this property. However, .the developer of Lot 2, is requesting that he be allowed the option of placing. a financial guarantee withthe City for his portion of the sewer line to service his property. He is proposing to install a "private" septic system on his property until: a sewer line can be constructed to his property. Streets: 't'his preliminary plat indicates the. location of right-of-way for the proposed linkage between Emerald Parkway and' Sebesta Road: The majority of this property will take access from-the frontage road of State Highway 6, but this proposed street will help to reduce the amount of traffic that. would .use residential streets within the Emerald Forest Subdivision. Off-Site Easements: Not applicable. Sidewalks: Notapplicable. Drainage: The drainage requirements for this property will be reviewed for compliance at the time of site>plansubmittal. Flood Plan: According to FEMA Flood Hazard Maps, this-property is not located within the 100-year flood plain. Oversize Request: Even though the developer is requesting to delay the construction of the sewer, he will be requesting oversize participation for the installation of the sanitary sewer line. This is in order for staff to determine the .fair share portion that the developer of lot 2 should pay as part of a development agreement. Any fair share portion has to be determined after oversize is taken out. The City's participation will be determined based upon the ,size of sewer line constructed and the size of line required by the .proposed development: Park band Dedication: Park land dedication is not required for .commercial developments.. Impact Fees: Currently, there are no impact fees associated with-this property. NOTIFICATION: Legal Notice Publication(s); NA Advertised Commission Hearing Dates(s): 5-1-97 Advertised Council Hearing Dates: 5-22-97 Number of Notices Mailed to Property Owners Within 200's NA Response Received: None to date o:\groupldeve_ser~cvsht~97-305.doc