Loading...
HomeMy WebLinkAboutMinutesRepresentative of the applicant Mike Hester approached the Commission and offered to answer any questions pertaining to the plat. Commissioner Massey moved to recommend approval of the preliminary plat of the Pleasant Forest Subdivision with the staff recommendations. Commissioner Parker seconded the motion which passed unopposed (5 - 0). AGENDA ITEM N0.4: Consideration of a preliminary plat of the Brazos Village Section II Subdivision totaling 17.3 acres located along State Highway 6 between Graham and Birmingham. (97-304) City Planner Kee presented the staff report and stated that this. property has had A-O, Agricultural zoning on it since annexation. The intended uses for lots in the subdivision are for commerciaVindustrial uses like those found in the C-2 zoning district. There are to be 6 lots ranging in size from 2.12 acres to 3.45 acres. The plat shows the extension of Longmire Drive through the property as a minor arterial. The property is bound by Birmingham on the north (collector) and Graham on the south (minor arterial). The zoning ordinance grants the Commission .discretion to require streetscaping along collector roadways. The presubmission conference staff recommends requiring streetscaping on Birmingham along with the other two arterials, with installation any plantings along roadways to be with the development of each .lot rather than at the time of plat filing. Staff recommended approval with the comments in the presubmission conference report, includeing streetscaping along Birmingham which is in keeping with policy regarding streetscaping of commercial collector roadways. A rezoning request will follow in the near future and any approval of this preliminary plat'should be made contingent upon a successful rezoning as well. Representative of the applicant, Kevin Schauer approached the Commission and offered to answer any questions pertaining to the plat. Commissioner Garner moved to recommend approval of the preliminary plat of Brazos Village Section II with the staff recommendations.. Commissioner Massey seconded the motion which passed unopposed (5 - 0). AGENDA ITEM NO. S: Consideration of a preliminary plat of the Edelweiss Business Center totaling 38.4 acres located along the east side of Wellborn Road between Rock Prairie and Monier Drive. (97-302) Assistant to the City Engineer Homeyer presented the. staff report and stated that the. purpose of this plat is to subdivide 38.35 acres into thirty (30) lots with the C-1, C-2, C-3 and A-P zonings. The report of the Presubmission Conference which was held on February 12, 1997 is attached as supporting material. Staff recommends that building plots for the purposes of signage should be determined with the preliminary plat.. The recommendations for signage is as follows: • Lots 1-5, Block 4 can each have a sign that meets the low profile standards or one consolidated freestanding sign for a1151ots. • Lots 1-6, Block 3 can each have a sign that meets the low profile standards or one consolidated freestanding sign for a1161ots. • Lot 1, Block 1 is allowed a freestanding sign.. • Lots 2 and 3, Block 1 can have 1 consolidated freestanding sign for both lots. • Lots 4, 5, and 6, Block 1 can have 1 consolidated freestanding sign for all 3 lots. • Lots 7, 8, and 9, Block 1 can have 1 consolidated freestanding sign for x113 lots. • .Lots 1, 2, and 3, Block 2 can have 1 consolidated freestanding sign for a1131ots. • Lots 4, 5, and 6, Block 2 can have 1 consolidated freestanding sign for all 31ots. • The following lots axe each allowed 1 freestanding sign per lot: Lots 1 and 2, Block 5 and Lots 7 and 8, Block 2. Assistant to the City Engineer Homeyer stated that the staff report and Presubmission Conference report mistakenly state that lot 1, block 1 is restricted to a low profile sign. Staff recommends that the lot be allowed a freestanding sign due to the size and orientation of the lot. Staff recommends approval of this plat with all Presubmission Conference conditions. PRESUBMISSION CONFERENCE REPORT February 21, 1997 TO: Kenneth D. Carr, Trustee 3600 Bee Caves Road, Austin, TX 78746 J. Keith Schauer, Doucet & Associates 1301 Capital of Texas Highway South, B- 25, Austin, TX 78746 FROM: Project Review Committee Jane Kee, City Planner Kent Laza, City Engineer Winnie Garner, P&Z Representati e Others Attending Natalie. Thomas, Planning Technician Tony Michalsky, Electrical Operations Coordinator Laverne .Akin, GTE Representative Don Fazzino, Lone Star Gas Representative David Durough, Lone Star Gas Representative SUBJECT: .Preliminary Plat -Brazos Village Section II,• proposed subdivision totaling 17.26 acres divided into six proposed M-1 Planned Industrial lots located along State Highway 6 South between Graham Road and Birmingham Road. (97-304) A Presubmission Conference meeting was held Wednesday, February 19, 1997 to discuss the above mentioned preliminary plat. The following is a list of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements. Discretionary Items: _ The Conference recommended that Streetscape be required along the Longmire extension, Graham Road and Birmingham Road. However, the plantings will not be required with the final plat but with the site plan',of each individual lot. Ordinance Requirements: _ Correct the vicinity map to show the location of the subject property. _ Provide a basis of bearing for the survey. _ Submit a rezoning application to be reviewed and considered by the Planning and Zoning Commission and City Council. (The final plat may be considered and approved conditioned upon the zoning.) _ Clarify the "proposed" dedication of the off-site 60' access .easement along the existing gravel road. _ Reference Brazos Village Subdivision (Section One) on the preliminary plat. } PRC Report Brazos Village II Case #97-304 Page 2 of 2 Comments/Concerns: Coordinate electrical service details with .Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. Easements will be required as each lot develops. Coordinate telephone service details and necessary easements with G.T.E. Representative Laverne Akin at (409) 821-4723. Coordinate gas service details with Lone Star Gas Representative David borough at (409) 776-0627. SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED PRELIMINARY PLAT BY WEDNESDAY, FEBRUARY 26, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, .MARCH 6, 1997. THE .CITY COUNCIL WILL CONSIDER THE PRELIlVIINARY PLAT ON THURSDAY, MARCH 27, 1997. BOTH MEETINGS WILL BE HELD AT 7:00 P.M. IN THE CITY HALL COUNCIL ROOM AT 1101 TEXAS AVENUE SOUTH. ~/ STAFF PRC REPORT Brazos Village Subdivision Section II Case #97-304 Di cretion Items: ~ ~~/v s ary ~~~~ The Conference reco ended that Streetscape be required along the Longmire extension and Birmingham Road. However, the plantings will not be required with the final plat but with the site plan of each. individual lot. ~~ Ordinance Requirements: ~ ` ~y~~ i~ Correct the vicinity map to show the location of the subject property. ~ Provide a basis ofbearing for the survey. / Submit a rezoning application to be reviewed and considered by the Planning and Zoning ® Commission and City Council. The rezoning must be approved prior to the approval of the final plat. (The final plat may be considered and approved conditioned upon the zoning. ) ! _~i'~1 the e ' mg ' City o ryan p erline a ment reloc o, s~~ Is the off-site 60' access easement along the existing gravel road "proposed"? Or will it be dedicated by separate instrument with the final plat? C~? ~-- Reference Brazos Village Subdivision (Section One) on the preliminary plat. Comments/Concerns: Coordinate electrical service details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. Easements will be required as each lot develops: Coordinate telephone service„details and ® necessary easements with G.T.E. Representative Laverne Akin at (409) 821-47L3: SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED PRELIlVIINARY PLAT BY WEDNESDAY, FEBRUARY 26, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, MARCH 6, 1997.