TO DATE L ~~
PROJECT NO.
PROJECT NAME '
I Sf J
ATTENTION REFERENCE
WE TRANSMIT: THE FOLLOWING: FOR:
^ Under Separate Cover ^ Prints ^Your Review. 8~ Approval
L~ Enclosed ^ Copies ^Your Review & Comment
^Originals ^Your Review & Distribution
VIA: ^ Plat ~^Your Review, Revision & Return
^ Mail ^ Field Notes ^Your Signature & Return
D Messenger ^ Plans ^Your File and/or Use
^ Federal Express ^ Report
^ Express Mail ^ Estimate. ^ As Requested By:
^ Special Courier ^ Cut Sheets
^ Picked Up By Your Office ^ Computer Printout ^ Please Acknowledge Receipt of
^ File Enclosures
^ Contract ^ Please Return Enclosures To Us
^ ^ Copies Of This Letter Of Transmittal
Sent To:
cures Are Not As Noted,
Jotify Us At Once.
From: Jim Smith
To: City Hall.Smccully
Date: 9/11/97 1:29pm
Subject: PRC - Wednesday,-September 17,.1997
Master Preliminary Plat -Dartmouth Crossing (97-318): No problem.
Final Plat Wheeler Subdivision Phase I (97-232)s No problem.
Finale Plat- Greensworld Subdivision Phase 3 (97-231): No problem.
Parking Lot Plan - Sevcik Texaco & L.P. Gas Reseller (97®422): No problem.
Thanka!
11/04/97 14:23 4409 846 8252 KLING ENGR -~~-~ COCS VOLK/MORGAN IQJ001
~~-a~-a-~,~
u~
KUNG ENGINEERING & SURVEYING
TELECOpIER COVER SHEET
iEF:raxeav6r)
DATE , ~ ~-~`
Please deliver the following pages~to:
N8171@:
4
Firm
Fax Number
From:
Kling Engineering & Surveying
470 South Texas Ave., Suite 2'12
Bryan, 'Texas 77$02
Phone; {409}848.6292
Fax: (409}$46-$252
We are transmitting Page{S}, including this cover letter fr~,m our
fax number listed above. if any pages are missing or incomplete, please
contact sender,
~. ~ /
~,~ pc.A~nc ur~~
Meeting Memorandum r~L'L
Subject: Wheeler property at`University & Lincoln
Attendees: Stuart I<Ling, Fred Paine, Brett McCully
Date: Friday, June 13, 1997
provided copies of the existing capacities in the 8 and 12 .inch lines from
University to the. Burton Creek :Line. The ,controlling section has. only 22,4 gpm
i available according to the model
also gave them a copy of the calcs done for Steve Homeyer on the first request
showing the combined estimations of the 2 sites.
Based on the information at hand, it appeared that the existing line would handle
the 4 acre A-P tract but not the 8 acre C-B tract as well.
'~ However I showed them a copy of the fax from. Fain McDougal that showed
much larger flows that estimated by the design manual or model either one.
suggested that whey sort. out what the flows would be and let us know.
Stuart also wanted to look through the CDM reports that were prepared for the
Comp plan. I told him I would find them and set them out front to be Looked
through.
end
p.s. I called Fred 6-16-97 and told him the. CDM reports were available at the
reception desk for review.
e
a
Sanitary Sewer Impact Analysis Prepared 5/20/97
Bert Wheeler 8.471 & 4.242 acre tracts Revised 6/12/97
Tract A
Size (ac) 8.471
Zoning C-6
Max use: Hotel
Use. comp: Hilton
Comp ave.. ww flow (gpd/ac) 4,382.
Ave, flow tract A (gpd) 37,120
Ave: flow tract A {gpm) 25.78
j Peak flow tract A (gpm) 116.00
Tract B
Size (ac) 4.242.
Zoning A-P
Max use: Mixed Office
Use comp: French Arbor
Comp ave. ww flow (gpd/ac) 412
Ave, flow tract A (gpd) 1,748
Ave: flow tract A (gpm) 1.21
Peak flow tract A (gpm) 5.46.
~ Peak Combined Flow (gpm) 121.46
~~. Capacity avail. in 8" line 22.4
Proposed flows cannot be accom odated in existing facilities.
~~
Page 1 of 2
Wheeler properties University @ lincoln
Qexist Qfull Qexcess Qexcess
manhole line size slope cfs cfs cfs gpm
03361-M018
8 0.004 0.39 0.77 0.44 197.47
03381-M024
8 0.0039 0.39 0.76 0.43 192.98
03381-M025
8 0.0116 0.39 1.30 1.02 457.78
03361-M029
8 0.0032 0.55 0.69 0.20 89.76
03282-M021 --
8 0.0071 0.55 1.02 0.56 251.33
O32B2-M017
8 .0.004 0.55 0.77 0.28 125.66
03262-M013
8 0.0039 0.55 0.76 0.28 125.66
03262-M010
8 0.0021 0.55 0.56 0.05 22.44
03282-M008
8 0.0074 0.55 1.05 0.58 260.30
03282-M007
12 0.0056 0.55 2.69 2.36 1059.17
O32B2-M005
12 0.0033 0.55 2.07 1.69 758.47
03282-M030
12 0.0018 0.55 1.54 1.12 502.66
03262-M003
12 0.0016 0.55 1.45 1.02 457.78
03262-M001
18 0.002 3.61 4.78 1.56 700.13
Page 2 of Z
'' JUN 06 '97 11 ~ 38AM HOLSTER &~~ ASSOCIATE5~U~1~ fly P. 1
~? Real. Estate
Brokerage Development Inrescrnents
~~.
Fax Message ,
From ~lci ~~~~c~l~ ~--
_..,
Data ~' ~ ~'~
# Pages (including covet shetz) ~
Camments .~ -~. ~ ~sa, v4- ~!iscJ4~ .
~ ~.,
~,.~-~
[f Fax Is Incompicte Plcasc Calt (404) 693-3179
vicDougat Fax Number: {409) b93-3370
x06/03197 12:23 ^C 409 846 8252 KLING ENGR -~-~-~ COCS YOLK/MORGAN X001
g
~®me~lfi~g ~' agnmeere *)i.m~~l ~nnrv~ey~ors
4103 Texas Avenue, suite 212 Post OfRce Box 4234
Bryan, Tcxas 77602
Telephone 4U+~/$46-6212 8r3'an, Texas 77805
Fax 409/846.8252
BJ. K13ng, P.E., R.P.LS.
S.M. 1Ctirtg, RP.L_5.
MEMQ
TO: City of Caliege Station
Development Services
ATTN: Steve Homeyer
FROM: Fred Paine a
June 3, 1997
RE: Sanitary Sewer lmpact Analysis for the 8.471 & 4.242 acre Wheeler
tracts
Last weep we briefly discussed the applied flow rates generated by the subject
tracts. You mentioned the existing 8" line has 22.4 gpm existing in the fine. I am
unclear as to if this is the flow carried by the line currently ar if this is remaining
capacity within the line., if there is capacity not being utilized in this line could you
clarify and notify us of any cirt:umstances that may have allocated sewer usa e
previously, g
l have found out that the proposed develapmen-t of the Q..242 acre tract wil! be
far an office/computing facility. With the City's estimate of usage being 5,46 m
for this tract, would it be possible to sewer to the existing 8" line? gp
The 8.471 acre tract generates 116 gpm according to City estimates. It is my
understanding that a new. line will need to be constructed. by the Owner of the tract
to accommodate this flaw. We are needing to find out the point to which the Owner
will be required to cortistruct this new line, That is, where existing City lines have
enough capacity to accept the flow. We are needing this information as .soon as
possible t4 determine the feasibility of the development of the 8.471 acre tract.
Please call at your earliest convenience to discuss further or notify me if !
should directly consult Brett, Your assistance is greatly appreciated.
10/02/91 11:44
C^409 846 8252 KLING ENGR
-~-~~ COCS VOLK/U~fORGAN I~lj 001
J i~n-~!
111//J , ~G/ ~.
®naultin6 iEngineera •)(raana~ s~aurveyors
4103 Texas Avenue, Suite 212
Bryan, Texas 77802
Telephone 409/846.6212
Fax 409/846-8252
B.J. Kling, P.E., R.P.L.S.
S.M. K1Ing, R.P.L.S.
l
~!
~~ '~'
Post Office Box 4234
Bryan, Texas 77605
October 2, 1997
Td; Veronica Mangan, P.E.
.City. College Station
FROM: S. M. Kli
R~: Conditions for filing final plat of Wh eler Subdivision, Phase one
learned. this morning that a requirement #ar filing the final plat is FEMA
approval of the LOMB. I have several concerns about this requirement:
1 } We have gone through a very long., approval process and the requirement
to secure FEMA aipproval has never been mentioned. The staff report
far the subdivision, dated September 17, 1997, indicated that we submit.
to the city the FEMA application, not that we secure FEMA approval.
~) FEMA is only concerned with insurable structures. iQCated within the
floodplain. The building setback requirements on University .and Lincoln
preclude the placement of a building within.. the majority of the floodplain
shown on the final plat.
31 The site plan which you have art file far the Marriat Suites shows no
insurable structures within or near the flaodplain.
4) The WSEI as shown on the final plat are applicable only to insurable
structures and not site improvements..
In summary, vve see na valid reasons to make the #iing of the plat contingent
on FEMA approval of the MR.
P 1~'
:Shirley Volk Re Development Agreement for Wheeler tract -Reply aged
From: Veronica Morgan
To: JKEE~City of College Station.City Hall, "jonathan~...
bate: 9/26/97 T0:53AM
Subject: Re: Development Agreement for Wheeler tract -Reply
hi john,
this is veronica morgan...i'll be one of the engineer's working on this project. the purpose of the easement
is to cover the creek to allow emergency maintenance access..if you are going to modify the creek, you
can alter the easement with it. i realize timing is probably critical and you dont want to do a bunch of
paperwork that will have to be redone once the development occurs. i just need to assure-that the
drainage way is covered by an easement. if you can give me some better idea of timing perhaps i can
figure out an alternate way to do this so we dont have to' abandon and easement and at the same time
get the right of emergency access that we need.
veronica
»> "Jonathan H. Brinsden" <jonathan~hammcorp.com> 09/26/97 09:16am »>
Jane,
Thanks for the update. I had a quesfion concerning the plat Stewart
Kling has filed. I received. a copy of the Staff Notes and the. only
comment of any concern was the request for a drainage easment for the
existing creek on lot 2 (eastern tract).. My concern is flexibility
again:. If you remember the siteplan, the MicroAge building will back up
to that .creek. We will most likely have to modify the bank of the creek
in order to facilitate that building ..placement.: Also, in the future
they may want the ability to move the flow tine (still on the property)
in order to gain land for expansion.
Please let me know your thoughts: on this issue,l would assume Stewart
has to make those corrections quickly for approval
Thanks,
Jonathan
Jane Kee wrote:
> Haven't forgotten about you. We had major changes in
engineering and they are a little behind. I'll try to have a draft
to you next week.
> Jane
CC: svolk~City of College Station.City Hall,
STAFF NOTES
Wheeler .Subdivision Phase One
Case #97-232
Staff reviewed the above :mentioned final plat and made the following notes:
Ordinance Requirements:.
_ Remove the City Council signature block. (This final plat will only go to the City Council
if the applicant chooses to appeal the Plantung and Zotung Commission's decision.)
Provide a drainage easement for the .existing creek across lot 2, block 1. (The minimum
width for any drainage easement for an open. channel. is the design. top width of the channel
plus 5' from edge of one side plus 15' from the edge of the other side..)
Correct the arrow designations for the 1.00 year. floodplain as it crosses University Drive.
_ Staff had a question regarding the WSEL 287 elevation shown across the floodplain on
Phase Two..
General note #4 should reference the LOMR/LOMA.
_ Provide the LO1VtR/LOMA application to City staff by Wednesday, September 24, 1997.
Once approved by staff, the applicant is responsible for all necessary FEMA application
fees.
Comments/Concerns:
_ Coordinate electrical details. with Electrical Operations. Coordinator .Tony Michalsky at
(409} 764-3660.
Coordinate telephone .service details with G.T.E. Representative Laverne Akin at (409)
- 821-4723.
SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED FINAL PLAT BY
WEDNESDAY, SEPTEMBER 24, 1997 TO BE INCLUDED IN THE PLANNING AND
ZONING C0IVIMISSION PACKETS FOR THE MEETING ON THURSDAY, OCTOBER 2,
1997 AT 7:00 P.M. AT THE CITY HALL COUNCIL, ROOM, 1101 TEXAS AVENUE
SOUTH.
Natalie hornas Ruiz
September 17, 1997
°°~