HomeMy WebLinkAboutMiscellaneousMcCLURE ENGINEERING, INC.
May 28, 1997
Mrs. Shirley Volk
Development Coordinator
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: EDELWEISS ESTATES, PHASE 4-B
FINAL PLAT SUBMITTAL
Dear Shirley:
Attached please find the. following items on the above referenced project:
1. Application Form
2. Filing Fee of $200.00
3. Sixteen (16) folded blueline prints of final plat
4. Drainage Study Addendum (2 sets)
5. Copy of Faid Tax Certificate
6. Two (2) sets of Construciton Drawings
Please notify me of the date and time for PRC discussion of this project. As always, I will
submit the signed mylar original as soon as all staff requested revisions have been completed and the
street light easements have been added.
Should you have any questions, please advise:
Very truly yours,
w I,
chael R. McClu e, P.E., R.P.L.S.
1~IlZM/rnlm
attachments
c:\wpdocs\correspond\ede14-b.fnl
1722 Broadmoor, Suite 210 Bryan, Texas 77802 {409} 776-6700 FAX (409) 776-6699
PAGE 2 -JUNE 4, 1997 -10:00 AM
FINAL PLAT -THE BUSINESS CENTER AT COLLEGE STATIC7N PHASE li;
PROPOSED SUBDIVISION .TOTALING 34.7 ACRES, DIVIDED
INTO 1 M-1 ZONED LOT GENERALLYLOGATED SOUTH OF
PHASE I ®N THE SE CORNER OF GATEWAY BCiULEVARD AND.
STATE HIGHWAY ~. (97-214)
COMMENTS: GTE HAS NO PROBLEM WITH THE PLAT - IF THERE ARE ANY
QUESTIONS -PLEASE CONTACT LAVERNE AKIN WITH GTE
AT 409!821-4723.
FINAL PLAT -EDELWEISS ESTATES PHASE 4-B; PROPOSED SUBDIVISIt3N
TOTALING 2.77 ACRES DIVIDED INTO 50 SINGLE FAMILY LtJTS
LOCATED SOUTHWEST OF PHASE 4 ~ BETWEEN NORTH
_GRAHAM ROAD AND MORTIER DRIVE. {97-215)
COMMENTS: 10 FOOT UTILITY EASEMENT ALONG THE REAR LOT UNE OF
LOTS 11 THRU 17 (THE LOTS THAT BACKUP TO THE
ABANDt3NED .NORTH GRAHAM R4AD)1F THERE ARE ANY
QUESTIONS CONTACT LAVERNE AKIN WITH GTE AT 409/
821-4723.
.STAFF NOTES
Edelweiss Estates Phase 4-B
. Case #97-215
Ordinance Requirements:
Is the signature blank for Mayor Lynn McIlhaney for the abandonment of North Graham?
If so, the abandonment of the North Graham right-of--.way must be requested in its
entirety, not piecemeal. ` {The ROW does :not have to be abandoned with this particular
phase; however, it must be abandoned in one piece.) This entire right-of--.way cannot be
abandoned until Rock Prairie, Road is completed and accepted by the City. Coordinate
details with Assistant to the City Engineer Steve Homeyer at (409) 764-3570.
Streetscape may be an issue along Edelweiss Avenue. The Commission. has the discretion
to require Streetscaping as they.did in phase eight. Coordinate Streetscape-requirements
for the. entire Edelweiss Subdivision with Senior Planner Sabine McCully at (409) 764-
3570.
Comments/Concerns:
Construction documents .have not been reviewed at the time of these comments.
Coordinate electrical service details with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
Provide. a 10' public utility easement along the rear lot lines oflots 11 through 17 (the lots
that back up to North Graham Road). _Coordinate telephone service details with G.T.E.
Representative. Laverne Akin at (409) 821-4723.
Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409)
776-0627.
SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED FINAL PLAT BY
WEDNESDAY, JUNE. 1-1, 1997 TO BE INCLUDED IN THE PLANNING & ZONING
COMMISSION PACKETS FOR THE MEETING OF THURSDAY, JUNE 19, 1997 AT 7:00
P.M. IN THE CITY HALL COUNCIL. CHAMBERS,
From: Kent Laza
To: SHOMEYER
Date: 6/13/97 1:47pm
Subject: Eidelweiss Sidewalks
Mike McClure called me Friday to say that-Steve Arden is considering moving
the sidewalks from their currently planned location next to the curb on
Eidelweiss Ave. to b ft. behind the. curb. Steve is .struggling with how to
meet the streetscape requirements. Mike is trying to talk him out of making
the change.
Mike's question was how to go about making that change and getting it approved
if Steve decides to do that. I told him a letter proposal would be good
enough for approval purposes, but I failed to tell him we would need as-builts
with them shown (although I assume he knows this).
I also suggested Steve Arden get with Jane to discuss. the problems he is
having with streetscape. Maybe there are other alternatives. He'll probably
be calling next week.
CC: JKEE, SVOLK
~'
~.
~~
~~
n ~ ~ ~• ® ~•
`°°' `"
~ ~ ~~ ~ ~ 1t3 ~.
.rto ~~®•.
~ ~ ~ ~
-~! "`~
.-~
~d
y