Loading...
HomeMy WebLinkAboutMiscellaneous06 May-97 Date Submitted: 3/12/97 Case #: 97-212 Final Plat: Pleasant Forest Phase One Engineering Firm/Surveyor: .Hester Engineering Owner: Dean Scheffer PRC: Yes PRC Date: 3!19/97 Staff Approval: Yes Date of Staff Approval: 4/3/97 Planning and Zoning Consideration:. Yes Date of Planning and Zoning Meeting: Approved by Planning. and Zoning: N/A Conditions: PRC Comments including the 2ndpedestrian access to the common area. Water Plans Approved: N/A Sewer Plans Approved: N/A Street Plans Approved:. N/A Sidewalk Plans Approved: N/A Drainage Plans Approved: N/A Electrical Plans Approved: N/A Letter of Guarantee/Credit: Utilities Constructed and Approved: Letter of Acceptance -submitted by Contractor: Plat Signed by Planning and Zoning: Plat .Signed by City Planner: Plat Signed by City Engineer: Filed at County Clerk's Officer Date Filed: Copies distributed: Microfilmed: Impact Fee:. $0.00 Streetscape Fee: $0.00 Parkland: $0.00 Fee Comments: 1 (409) 764-3500 Apri121, 1997 Texas Departrnent of Transportation 4 ATIN: Mr. Patrick Williams, P.E. 1300 N. Texas Avenue Bryan, Texas 77803 ~~ f RE: Driveway Permit for Pleasant Forest Subdivision ~j f Dear Mr. Williams: Attached are 3 copies of a Driveway Permit Application for the above referenced development on '~'~ the West Frontage Road. of State Highway 6 (East ByPass). This: site is .located between the Crystal Park Plaza. and Mile Drive. The _apphcant is proposing to construct a 28 foot wide street I, and install an 18 inch culvert. Also included are 3 copies of construction details and a copy of the plat for reference. Please review at your earliest convenience and if you have any questions feel ~ free to contact me at 764-3570. ~'i 1 re Y Ali 'Steve H m yer Asst.. to the City Engineer ~I xc: ' ~ Volk, Development Coordinator :Michael Hester, Hester. Engineering Company TxDOT Dnveway Permit File ,~, ~I i ~~ ~! ~. ~" ~~ ~; Home of Texas A6M ^niversity ~,~ ~•~ `CITY OF' COLLEGE STATIOI`I Post Office Sox 9960.. 1101 Texas Avenue College Station, Texas 77842-9960 s City of College Station 1101 South Texas Avenue P.O. Box 9960 College Station, Texas 77842 CITY OF COLLEGE STATION f DEVELOPMENT SERVICES To: Phone: Fax phone' CC: i REMARKS: ^ Urgent For your review ^ Reply ASAP ^ Please comment ff you did not receive a complete fax, please call our office immediately for a new transmittal. Date: /,CU l ( O Number of pages including cover sheet: F / ~! ` Phone: ' 409-764-3570 Fax phone: 409=764-3496 JAN-27-199E 16 31 FROM NESTER ENGINEERING CO. TO CS ENGR. P.01 u ~~ " RESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-8 COLLEGE STA710N, TEXAS 77840 Ph: (409} _ 693-1100 fx:t409}693-1075 email: hec2000@aol.com (~ ~_~ ***** CONFIDENTIAL NOTE ****** The documents accompanying this telecopy transmission contain information from the firm o Hester Engineering Company which ~s confidential. The information is intended only for the us~ of the individual or entity named on this transmittal sheet. If you are not the intended reclpienl you are hereby notified that ahy disclosure, capYing, distribution or the taking of any action i reliance of the contents of this telecopy information is strictly prohibited, and that th+ documents should be returned to this firm Immediately. In this regard if you have received th! telecopy in error, .please notify us by telephone immediately so that we can arrange for th return of the original documents to us at no cost to you. Date: ~ .2~ .Gj gj from: Michael G . Hester, P . E . 70~~ ~!N['~-t.i. ~ w t'~ _E~Q ~°~ i~a~ ~4S . C.~ 4-a~-9a tom. i ae e . . Attachments: ~~ , copies To: 1~. ~ ~t~f~''-- ~ ~('0 3 ~ ~02~ ~ ~- t~ copy to be mailed: ~! ~ of ~ Sheets JAN-27-199E 16~~2 FROM .NESTER ENGINEERING CO. TO '• CS ENGR. P.82 PLEASANT FOREST SUBDIVISION DECEMBER 2,1996 ENGINEERS 4U~TITY AND COST ESTIMATE ITEM DESCRIPTION UNITS QTY. UNIT PRICE SXTEN3ION 1 CT.,EARING ROW (WOODED) AC. 1.75 $2,500.00 0 $4,375 304 $18 2 ROADWAY EXCAVATION C.Y. 4575 600 $4.0 60 $2 , 560 $14 3 6" STABILIZED SUBGRADE {4%)S.Y. 5 50 . 00 $80 , $4,000 4 EXTRA LIME (TYPE A) TONS Y S 500 4 . $5.50 $24,750 5 6 6" GRAVEL BASE 5" H_M.A.C 1 . . S.Y. . 4500 $4.50 $2.0,250 7 . SIDEWALK (6'WIDE) S.F. 9150 3100 $2.50 50 $7 $22,875 250 $23 8 CURB AND GUTTER L.F. Y S . 2700 . $0.15 , $405 9 10 SEEDING STD. CONC. APRONS . . S.F. 388 $3.25 $1,261 11 18" RCP L.F. 40 $24.00 $960 12 SLOPED HEADWALLS EA. 2 $500.00 $1,000 13 CONC. FLUME TO BEE CRK. S.F. 1200 90 $3.25 00 $30 $3,900 700 $2 14 ROCK RIPRAP AT OUTFACE S.Y. Y C 3500 . $5.00 , $17,500 15 COMPACTED FILL MATERIAL . . 16 6" PVC WATERLINE L.F. 1425 $15.00 $21,375 17 12"X6" T.S.&V. EA. 1 $2,000.00 $2,000 18 6" VALVES EA. 2 $300.00 $604 19 STD. FIRE HYDRANT EA. 2 $1,700.00 $3,400 20 6 TEE EA. 1 $175.00 $175 21 6" BEND EA. 2 $150.00 $300 22 6" PLUG EA. 2 $150.00 $300 23 2" BLOW OFF EA. 2 $400.00 $800 24 WATER SERVICES L.F. 510 $18.00 $9,180 25 6" PVC SAN. SWR. L.F. 1580 $17.00 $26,860 2& SAN. MH (6`DEPTH) STD EA. 5 $1,250.00 $6,250 27 . X-DEPTH MH V.F. 15 $80.00 $1,200 28 SEWER SERVICE CONNECTIONS L.F. 565 $18.00 $10,170 29 GROUT X-SANITARY L.F. 540 $1.00 00 0 $540 $450 30 CONNECT TO X-SAN. MH EA. 1 . $45 31 EROSION & SEDIM. CONTROL LS. 1 $2,000.00 $2,000 32 TRENCH SAFETY LS. 1 $2,000_-00 $2,000 TOTAL PAVEMENT ~ $134,026 TOTAL DRAINAGE _ $26,060 TOTAL WATER LINE _ $38,130 TOTAL SAN. SWR. ~ $45,470 MISC ELLANEOUS ~ $4,000 TED CONSTRUC TION COST = $247,686 ~r ~ l0% CONTINGENCY = ~ $272,455 SCHIEFFER SUBD. CONSTRUCTION COST ESTIMATE PAGE 1 OF 2 PAGES JAN-27-1998 16 32 FROM NESTER ENGINEERING CO. '. o 4 ~ ~ ~ ~ ~ ~~ ~ ~~ o -. Q b TO CS ENGR. P.03 ~' ~N~ ~~~~ ~ O~~ ~~~~~ 0 ~ ~~~~ ~ ~q~~ U Z ,~ ~-- ~ ~ tDLk~1a ~~~~ ~~~~ ~~~ ~ ~~U ~~ ~ ~ ~ ~~ L ~ ~ ~ o~ ~ ~~ ~ ~ ~ ~ ~~ ~ ~a -~ O ~~ 3 . ~~ ~ ~~ ~~~ ~ ~ ~ ~ ~ ~' ~ ~ ~1 ~ .~= r ~ ~ ~~ ~ ~ ~ ~ 1 D ~~. JAN-27-1998 11 46 FROM RESTER ENGINEERING CO. TO CS ENGR. P.02 ` ~ ..~' ,,n. _, 1 ~.I: .., a .r• aQ ~` =y~ c~ ~~~ °~d Ia ~ ~ o r ~• rn ~ W ~~99 ~ a Q ry ~ x y O ~ r ~ 6 t~ ~ ~~ ~ ~ ~~irs ,~~ O ~ ~~ [~ ~ ~ ~ ~ ~1 ~ ~ j~ ~ U ~ Qs O ~ ~ ~ ~ ~+~ ~ .~ ~ ~. ~ ~ ~ N tt,:.~ 0 ^~ ~ o~ \^•w (~ ~ ~ ~ t1 U 7 sti U ~`~ -~~~ Agreement Between: Dean'Scheffer, Schieffer Construction And: Mark Smith, P.E. Acting City Engineer, City of College Station Date:. March 17, 1998 Subject: Pleasant Forest Subdivision The asphalt paving in the Pleasant Forest Subdivision is not acceptable to the City. in its current condition. I :believe that if fails to comply.with the specifications in several respects. We agree to follow the findings and recommendations, .regarding the condition and remedy of any found defects, of an independent registered engineer after his inspection and evaluation of the pavement. The Citgwill file the Pleasant Forest Subdivision plat under the following conditions. L Schieffer Construction`willrnake the recommended repairs as quickly as possible. 2. No Certificates of Occupancy (CO's) will be issued for lots in the Pleasant Forest Subdivision until either said repairs are made or a bond has been posted by Schieffer Construction to cover the estimated ~~~ cost of the repairs. 3. The owner/developer will make withholding CO's until pavement repairs are made a condition of the ;sale of lots in the PleasantForest Subdivision. 4. A copy of the deed of sale indicating the restriction on CO's will be supplied to the College Station Building :Official A ee ~~ ~~ ~~ ( 9 Dean Schieffer Date Mark .Smith Date i it III a I j i ~, ~, n~o °° i ~~ ~~~ ~.__1 ~ ~ ~ ~ ff y~iV ` ~ ~ ~ ~ ~~' ~ r ~• y ~ ~% ~ ~ ~ ~ ~ ~. ~ ~ ~:~ ~ ~ ~ `" r.p. ~' _ ~ .. <Y PRESUBMISSION CONFERENCE. REPORT March 21, 1997 TO: Dean Schieffer P. O. Box 70, Kurten, TX 77862 Mike Hester, Hester Engineering 7607 Eastmark, Suite 253-B, College Station, TX 77840 FROM: Presubmission Conference Jane Kee, City Pla~r .~~`~~ Steve Homeyer, Asst. t ~f t to the City Engineer Steve Parker, P&Z Rep entative ---~ Others Attending Natalie Thomas, Planning Techmeian Shirley Volk, Development Coordinator ` Tony Michalsky Electrical Operations Coordinator Laverne Akin, GTE Representative SUBJECT: Final Plat - Pleasant Forest Subdivision; proposed subdivision totaling 11.43 acres divided into 39 single family residential lots located along s side of State Highway 6 between the Crystal Park Plaza and Mile Drive (97-212) A Presubmission Conference meeting was held Wednesday, March 19, 1997 to discuss the above mentioned finalplat. The following is a list of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinances. Discretionary Item: _ The Planning and. Zoning Commission has the discretion to require pedestrian access to the proposed common area. The Conference recommended that this access be provided through lot 35 within the proposed 15' public utility easement. The pedestrian access must be a minimum of a 10' easement with a 4' sidewalk. Ordinance Reauirements: _ Show all utility easements as "public utility easement". _ Submit paid tax certificates. for the subject property. _ The final plat is not a minor plat and must be considered by the Planning and Zoning Commission.. Provide a signature block for the. Commission...and modify the City Engineer's signature block accordingly (by removing the City Planner). _ Change the interior lines of the subject property so that the boundary of the final plat is clear. PRC Report Pleasant Forest Case #97-212 Page 2 of 2 Ordinance Requirements conta: Correct the signature blocks of the Engineer/Planner and Surveyor to reflect a "plat" and not a "replat". _ Parkland dedication fee of $225 per dwelling unit for a total of $8,775 is required prior to filing the plat for record. Provide public utility easements .for the sanitary .sewer line along lots 10 and 28. Comments/Concerns: Coordinate electrical service .details and necessary easements with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660.. Coordinate telephone service details and necessary easements with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED FINAL PLAT BY TUESDAY, MARCH 25, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, APRIL 3, 1997 AT 7:00 P.M. IN THE CITY HALL COUNCIL ROOM AT 1101 TEXAS AVENUE SOUTH, COLLEGE STATION, TEXAS. STAFF PRC REPORT Pleasant Forest Subdivision Case #97-212 Ordinance Requirements: Show all utility easements as "public utility easement". Submit paid tax .certificates for the subject property. The final plat is not a minor .plat and must be considered by the Planning and Zoning Commission. Provide a signature block for the Commission and modify the City Engineer's signature block. accordingly (by removing the City Planner). Change the interior lines of the subject property so that the boundary of thee. final plat is clear. v Correct the signature blocks of the Engineer/Planner and Surveyor to reflect a "plat" and not a "replat". Parkland dedication fee of $225 per dwelling unit for a total of $8,775 is required prior to filing the plan for record. ACCESS TO THE COMMON AREA FROM PLEASANT GROVE DRIVE? Comments/Concerns: ((~ ~ ~~ ~ ~ ® Coordinate electrical service details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660.~~~ ~-~ , _ Coordinate telephone service details and necessary easements with G.T.E. Representative Laverne Akin of (409) 821-4723. ` SUBMIT 10 COPIES OF.THE REVISED FINAL PLAT BY TUESDAY, MARCH 25, 1997 TO BE INCLUDED II`T THE PLANNING & ZONING COMMISSION. PACKETS FOR THE MEETING OF .THURSDAY, APRIL 3, 1997.