Loading...
HomeMy WebLinkAboutMiscellaneousY ~ PRESUBMISSION CONFERENCE REPORT January 2, 1997 TO: Elrey Ash, City of College Station P. O. Box 9960, College .Station, TX 77842 Michael McClure, McClure Engineering, Inc. 1722 Broadmoor, Suite 210, Bryan, TX 77802 FROM: Presubmission Conference Shirley Volk,. Development Coordinator Steve Homeyer, .Graduate Civil Engineer Others Attending Natalie Thomas, Planning Technician Tony Michalsky, Electrical Operations Coordinator David borough, .Lone Star Gas Representative SUBJECT: Final Plat -The Business Center at College Station, Phase One; proposed amending plat of 93,106 acres divided into six industrial lots located along t:he east right-of--way line of State Highway 6, south of Pebble Creek Tract A. (97-200) A Presubmission Conference meeting was held Monday, December 30, 1996 to discuss the above mentioned final plat. The following is a list of ordinance .requirements and comments identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements.. Ordinance Requirements: This amending plat is a minor .plat according to the Subdivision Regulations and can be approved at staff level. Remove the signature block for the Planning. and :Zoning Commission and :modify the City Engineer signature block as follows: CERTIFICATE OF CITY ENGINEER & CITY PLANNER We, .Kent Laza, City Engineer and Jane Kee, City Planner of the City of College Station, Texas,. hereby certify that this subdivision plat conforms to the. requirements of the Subdivision Regulations of the City of College Station. Kent Laza, City Engineer Jane Kee, City Planner _ Remove the drill production site shown on the amending plat. This site was never drilled on and by ordinance, cannot be drilled on due to the proximity to the Pebble Creek Elementary School. According to the Pebble Creek Phase Five construction documents, add a 25' public drainage and utility: easement along the easternmost lot line between block 1 a~r~d .the Young Brothers property. ~ .,~ m PRC Report Business Center Case #97-200 Page 2 of 2 Comments/Concerns: _ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. _ Coordinate gas service details with Lone Star Gas Representative Don Fazzino at (409) 776-0627 or (800) 299-4099 #1579 pager. SUBMIT THE REVISED MYLAR ORIGINAL. AND 1 COPY`TO BE APPROVED BY THE CITY ENGINEER AND CITY PLANNER BEFORE FILING AT THE COUNTY CLERK' S OFFICE. ~~y--~' STAFF NOTES The Business Center at C.S., Phase One Case #97-200 Ordinance Re uirements: This amending plat is a minor plat according to the Subdivision Regulations and. can be approved at staff level. Remove the signature block for the Planning and Zoning Commission and modify the City Engineer signature block as follows: CERTIFICATE OF CITY ENGINEER & CITY PLANNER We, Kent Laza, City Engineer and Jane Kee, City Planner of the City of College Station, Texas, hereby. certify that. this subdivision. plat conforms to the requirements of the .Subdivision Regulations of the City of College Station. Kent Laza, City Engineer Jane Kee, City Planner _/ The drill production site was never drilled on and by ordinance,. cannot bed 'lled on due to the proximity to the Pebble Creek Elementary School. ~ U "' " `_ ~~~~-' According to the Pebble Creek Phase Five construction documents, add a 25' public drainage and utility easement along the. easternmost lot line. between. block 1 and the Young Brothers property> ~~tii:QC --~-y,~ ~ Comments/Concerns: ~ ~ _ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT THE REVISED MYLAR ORIGINAL AND 1 COPY TO BE APPROVED B'Y THE CITY ENGINEER AND CITY PLANNER BEFORE FILING AT THE COUNTY CL:ERK'S OFFICE.