Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT Item: Public hearing and consideration of a rezoning request of approximately 37 acres in the proposed Westfield Addition located along the. south .side of Graham Road near the .future extension of Victoria Avenue. (Planning Case #97-117) and Consideration of a Master Plan,and Preliminary Plat of the entire Westfield Addition, 52 acres divided into 171 single family lots, 1 C-N reserve tract and 3 reserve tracts. (Planning Case # 97-320) Item Summarys The subject property was annexed into the City in 1993, at which time it was reflected as A-0 Agricultural .Open on the Zoning Map. This. area as well as most of the. property within the southern parts ofthe City remans'undeveloped, however, .many of these areas. have seen recent. development interest due to the City's planned utility expansions. into them. Originally this: property. was. divided into 3, approximately, 15 acre tracts. Recently the most southerly portion of these 3 tracts (where Southern Plantation will extend) and the westerly portion where Victoria will extend was subdivided from the. 3 original tracts. This was done without platting the property. The thoroughfare plan calls for the extension of Victoria and Southern Plantation to extend through these properties. Therefore, this subdivision was not exempt from the City's regulations. For the: past year and a half, the applicant has been involved in numerous .discussions with City Staff regarding the development of the subject property. The applicant has submitted .several conceptual plans for initial response from the Staff. We discussed the following: ,the possibility of combining the parkland dedication requirements with the existing creek to gain compliance with the Comprehensive Plan goals. relating to park linkages and combining schools and: park sites (there is an adjacent future school site), orienting the subdivision to .take advantage of the creek as an amenity, the thoroughfare plan and how it relates to the site, the internal street layout and access,. and how to sewer and drain the property Staff has been discussing these concerns with the developer for. over a year and .still does not feel they have been,adequately,addressed: The developer asked to bring this master plan and preliminary plat and associated zoning. request forward to the Commission. Staff has the following .concerns: Zonin The property. currently has A-O Agricultural Open zoning on it. The developer has a request to rezone. the first two phases to R-1 Single: Family. Staff has difficulty recommending approval of any zoning at this time, although R-1 is in .compliance with the land use plan, because there are so many unanswered questionson the master plan. o\group\deve_serlstfipt\97117320.doc Phasing The developer's intention is to build single family residences on the property with possible. neighborhood commercial at the Victoria/Graham intersection.. The master. plan shows Phases One and Two or more than half of the. proposed residential development before Victoria and Southern Plantation are even addressed. Staffis concerned about the phasing of this overall plan. The concern stems from the ability for the remainder of the development to support uch arge pieces of infrastructure. There are also additional concerns: about the internal street layout.. No secondary access to Graham or Victoria is provided until Phase 3. There would be approximately 107 lots built with only a single access. Drainaue Staff is concerned about drainage facilities for the subdivision. The preliminary plat refers to a regional detention area located on the adjacent CSISD property. According to CSISD staff and consultants,. their project does not necessitate participation in a regional detention facility. Staff cannot- verify CSISD .detention. plans. at this time.. Floodplain/Floodwa Floodplain and floodway may exist. on this property. The developer has not confirmed that there. is not any floodplain on the property.. CSISD on the. adjacent tract is performing a hydraulic analysis to define the floodplain/floodway on their property and as of this writing, there appears to `be floodplain on their tract. The location of the floodplain/floodway may have an impact on the lots that back up to the. reserve creek area. At this point, with the. location unknown, the suitability for development of these lots is also unknown. Sanitar~Sewer The developer has discussed the ability for this property to sewer toward the south rather than participating in the Graham Road Impact Area Phase 3 sanitary sewer line. They have discussed a request to amend the existngimpact fee area 92-01 and remove the Phase 3 .line. If this phase is>deleted, they would then like to pursue an alternate sewer .alignment along the north fork of Lick Creek. A portion of this line has already been constructed,. and is existing in the Sprngbrook Subdivision and would continue. west to and through this development. The developer would be requesting oversize participation in this:new sewer line. The responsibility for demonstrating the need to amend the Impact Fee Area 92-01 and reduce the number of lots that would participate in this impact fee is inherent on this developer. Ultimately City Council must approve any change to the impact fee: area. This has not been done to date: o:~group\deve_serlstfrpt\97117320. doc Oversize Participation It is required that impact studies be presented when oversize participation is being requested. No impact studies have been presented to the City staff. Proposed C-N tract. This property will come before the Commission and Council. as a rezoning request in the future. ,Approval of this :master plan does. not guarantee .approval of any future rezoning. Staff does not see a problem with some neighborhood .commercial zoning in the master plan. Parkland Dedication and Open Space along~~the creek This master plan also includes a portion of the north fork of Lick Creek. Given our current Comprehensive Plan, and the discussion about open space along creeks, this plan should address how this .creek area will work with the planned development. Currently, it is shown as a "Reserve Tract" and does not incorporate. the residential development. It is not being treated. as an asset but rather the development has its back turned to what could be an amenity. Section 8-A of the Subdivision Regulations states "In all subdivisions, due .regard shall be shown, for all natural features. such as trees, water courses, historical spots,_andsimilar communtyassets, when preserved, will add attractiveness and value to the property. " The Parks Director has had conversations. with the developer and indicated the Parks Dept. desire to have pedestrian and maintenance vehicle access from all streets in this development to the creek open space. The. applicant has offered: one access ..from the cut- de-sac in Phase One. The Comprehensive Plan recommends moving toward a linkage system of greenbelts and open space connecting neighborhoods and parks. Neighborhoods and parks should incorporate. these open space areas. by providing street frontage, visibility -and access. The parkland cash. dedication from this development would be in the amount of $3.8,475.00. However, the applicant has recently. acquired all the tract on the other side of this creek which runs completely to Barron.Road. This is an ideal opportunity to provide a neighborhood park location with access to the creek as open .space.. This could tie in nicely with the adjacent CSISD property where there will be an elementary school and. intermediate school in the future. o:\goup\deve_ser\stfipt\97117320. doc t Policy Statements: COUNCIL VISIONS FOR THE `21ST CENTURY Civic Pride Citizens benefit. from well-planned, attractive residential and commercial areas, and. ftom preserving historic areas. Parks. and Recreation -Citizens benefit from parks. and recreational activities that are geographically and demographically accessible and serve a diversity of interests. Transportation/Mobility -Citizens .benefit from the ability to move into, out of, and within College Station. in a safe and efficient manner. COMPREHENSIVE PLAN GOALS AND OBJECTIVES: Tran~ortation -Goal #2 -- College Station should continue to develop and maintain a transportation .planning process which .addresses long range needs.., Goal #3 -- continue to maintain a Master Thoroughfare Plan ...which permits Right-of--way .dedications as specified....dedication of street system right-of-ways.: in those areas of the community that are undeveloped Parks and .Recreation. Goals and. Objectives -Goal #1 -- .encourage additional connections between selected parks/recreation areas and residential areas by a system of linear parks/parkways/greenbelts which utilize... creek beds, drainage ways...Goal #2 -- continue to jointly develop and .maintain parks :...with other public agencies.... Goal #3 -- designate selected portions of 100-year floodplan on undeveloped properties as "natural corridors" that .are to be used for open space and passive recreation uses that will link parks to one another and to residential areas. LAND USE PLAN The Land. Use Plan. shows medium density .single family at a maximum density of 6 dwelling units per acre. The proposed zoning. would be in compliance with. the -Land Use Plan, THOROUGHFARE PLAN The Thoroughfare Plan shows. the extension of Victoria along the western boundary of the 14.8 acre tract .located just to the west ofthe two tracts submitted for rezoning. The Plan also shows he extension of Southern Plantation through the... southern- portion of the subject tracts and through the southern portion of the adjacent 14..8.-acre tract. o;\group\deve_ser\stfrpt\97117320: doc Budgetary & Financial Summary: The developer has indicated that oversize participation will be requested on the ewer line, Victoria, and_Southern Plantation. There have not been any: impact fee reports done' on this property which address. the magnitude of this request. Oversize participation funds. are extremely :limited at this. point. Staff Recommendations: Although staff supports single family residential land uses with some: associated neighborhood commercial in this location, we cannot recommend approval: of the zoning,: overall masterplan or preliminary plat at this time until the following are addressed as discussed above: Thought given to how the creek area could ultimately be incorporated as part of the development Alternative phasing to address access and infrastructure guarantees, A determination as to how the. property will be sewered A determination and ultimate recommendation from the Parks Board as to the best way to provide .parkland Submission of impact analysis for the. oversize requests Commission Action Options:, Approve, deny, approve with conditions. ENGINEERING Water; Water is provided along Graham Road Off: site EasementscMay be required for sanitary sewer. Sidewalks: Will be required .internally. .The sidewalk along Graham Road will be constructed. with the City's Crraham Road CIl' ..project. NOTIFICATION: Legal Notice Publication(s): Eagle; 11-5-97 .and 11-26-97 Advertised Commission Hearing Dates(s): 11 20-97 Advertised Council Hearing Dates: 12-11-97 Number of Notices Mailed to Property Owners Within 200': 8 Response Received:. None as of date of staff report Supporting Materials: 1. Staff Review Notes 2. Application 3. Masten Development Plan 4. Preliminary Plat o:\group\deve_scr\stfrpt\971.17320. doc