Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Item: Public hearing and consideration of a rezoning of approximately 107 acres located in the southeast quadrant of the University Drive and East Bypass intersection in the Richard Carter Survey, Abstract 8, from A-O Agricultural/Open and R-l Single Family to C-l General Commercial. (planning Case No. 97-109) Item Summary: The majority of the property is located within the Carter Creek floodway, and is therefore currently considered undevelopable. The applicant is applying to FEMA and to the City to have the floodway channelized, thereby reclaiming a substantial amount of land for development. The City is reviewing the reclamation request under the current Drainage Ordinance, which allows relocation and reclamation of flood fringes and floodways (flow areas) of all creeks. Rezoning of the property will prepare the property for development and could potentially facilitate the reclamation project. The tract is bound on the north by University Drive and on the south by Highway 30. Property to the immediate west is zoned C-l and C-2; property to the immediate east is zoned M-1. From a land use standpoint, the request for commercial development could be considered compatible with the zoning and land uses that are within the immediate area if the property were rendered developable. It is also in line with the development policy that commercial land be located near major intersections. However, the property is shown on the Land Use Plan as Parks/Open Space due to the Comprehensive Plan Objective to preserve the Carter Creek floodway. The implementation of this policy would involve property acquisition, otherwise floodway reclamation is possible under the City's Drainage Ordinance. Policy Issue Statement: Civic Pride - Citizens benefit from well-planned, attractive residential and commercial areas, and from preserving historic areas. Parks and Recreation - Citizens benefit from parks and recreational activities that are geographically and demographically accessible and serve a diversity of interests. DEVELOPMENT LOCATIONS - Goal #1 - ...provide adequate amounts of appropriately zoned land for all land uses... Objective 1.2 - promote the use of vacant land in the existing sewershed area... Objective 1.3 - ...avoid strip commercia1...encourage centralized commercial development which encourages multi-modal access... FLOODWAYS - Goal #5 - ... encourage development that is in harmony with the environment. Obiective 5.1 - prohibit reclamation of the floodway associated with Carter Creek, ...in order to prevent upstream flooding, avoid long term structural and erosion problems associated with floodplain reclamation, and to provide a city wide network of natural open space. o:\group\deve _ser\stfipt\97 -109 .doc FLOODPLAINS - Obiective 1.3 - ...develop and encourage innovative solutions that are aesthetically pleasing and environmentally sensitive to abate flooding and drainage problems...Obiective 3.2 - ... in cooperation with community groups such as the Brazos Greenway Council, designate selected portions of the 100 year floodplain.. .as natural corridors that are to be used for open space and passive recreation...Obiective 4.2 - ...begin to address solutions to stormwater management which incorporate...stream side buffers and soil bioengineering... The Land Use Plan reflects the area as Parks/Open Space due to the fact that the entire tract is located within the floodway of Carter Creek. The Parks/Open Space designation is to be used for purposes of buffering otherwise incompatible land uses, preserving a significant amount of natural open space, and creating linkages between the City's parks. The reclamation area that is proposed by the applicant will provide linkages, but it will destroy the natural environment as it exists today along the affected portions of Carter Creek. The reclamation of the floodway itself is in direct conflict with Objective 5.1. Item Background: No previous action found. Budgetary & Financial Summary: N/ A Staff Recommendations: There are several engineering, legal, planning, and zoning issues involved in the development of the subject property that remain unresolved. Under current physical conditions of the property, the 107 acres remain largely undevelopable until all pending permits have been issued through the City Engineer's office and through several federal agencies. Therefore the request is not yet ready for rezoning to a more intense land use classification. Staff recommends denial at this time. Related Advisory Board Recommendations: N/A City Attorney Recommendation/Comments: Legal has approved as to form. Commission Action Options: Recommend approval; recommend approval with conditions (height limits, buffering, rezone less property, rezone to less intense land use); recommend denial; recommend denial without prejudice; table; defer action to a set date. Supporting Materials: I. Location Map 2. Application 3. Engineering Information and Notification Information o:\group\deve _ ser\stfipt\97-1 09 .doc ENGINEERING Water: Existing infrastructure surrounding the property is adequate for most developments. Service will need to be extended by the developer to service interior developments as they occur. Sewer: Existing infrastructure appears to be adequate, however as development is proposed a more accurate determination of capacity can be made. Streets:. Streets may need to be added to access developments in the interior of the property. Off-site Easements: Not applicable. Sidewalks: At the time of final plat, the need for sidewalks will be addressed. Drainage: The detention requirements for this property will be reviewed at the. time of final plat or site plan review. Flood Plain: Currently the property is located within the 100 year flood plain as shown on the 1992 FEMA FIRM maps. The applicant is proposing channelization of the floodway which. would reclaim significant portions of land currently located within the floodplain. The floodway reclamation report indicates that the existing natural channel will be relocated into a 50' low flow channel. The floodplain width in this area will be approximately 300' wide with gentle side slopes that will provide for a ..pastoral appearance. At this point, to keep with design characteristics and optimum floW, no new plantings (trees, shrubs, etc.) are proposed. It is critical that this floodplain be maintained (mowing on schedule and regrading as necessary) in order to provide for the optimum flow as calculated in the report. Oversize Request: None is being requested. Parkland Dedication: Not applicable. Impact Fees: Not applicable. NOTIFICATION: Legal Notice Publication(s): The Eagle; August 20, 1997; and September 10, 1997 Advertised Commission Hearing Dates(s): September 4, 1997, due to notice error Advertised Council Hearing Dates: September 25, 1997 Number of Notices Mailed to Property Owners Within 200': 13 Response Received: Several inquiries as of date of staff report. Brazos Greenways Council has expressed concern regarding the reclamation project. Inquiries from the Winwood Homeowner's Association President Sherrie Ellison. o:\group\deve _ser\stfipt\97-109.doc