Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Item: Public hearing and consideration of a rezoning of 5.7 acres located along the north side of University Drive, approximately 1000' east of the Spring Loop intersection from R-l Single Family to C-B Business Commercial. (Planning case file No. 97-102) Item Summary: The. subject property is located in the University Drive corridor. It immediately abuts future multi-family areas to the north and to the east; there is a relatively small vacant A-P lot to the west. The University Drive study recommended this area to be a mix of commercial and medium density residential and the request is in conformance with the study. The request also complies with the draft land use plan, which shows the area as mixed use. The draft plan concept of a mixed use area would include buffer easements.of a width of 100' to 200' between various land uses. Policy Issue Statement: Civic Pride - Citizens benefit from well-planned, attractive residential and commercial areas, and from preserving historic areas. The City's policy as it relates to this area is to maintain an attractive commercial corridor that will develop as a mix of office, hotel, restaurant, and retail uses. The rezoning would further this policy. Item Background: In 1995, the subject tract was a part of a larger rezoning request that was approved for 40 acres of C-B zoning and 25 acres of R-5 zoning. That rezoning was approved with several conditions that have not yet been met; therefore the official zoning of the entire 65 acres remains R-l. The conditions were imposed in order to ensure compliance with the University Drive Study recommendations. They . related to traffic safety concerns, potential impacts to the sewer system, and to preservation ofthe natural aesthetics of the site. Several of those conditions are pertinent to the 5.7 acres that are now under consideration. Budgetary & Financial Summary: Nt A Staff Recommendations: This request complies with the City's plan for the area and furthers policies as stated above, therefore Staff recommends approval with the following recommendations: 1. That access points to the tract be limited at the time of development to one drive off of University Drive aligning with the existing drive to the south across University Drive. 2. That cross access be provided at the time of development to the future R-5 and the existing A-P through the subject tract. 3. That a sewer impact study be provided at the time of development analyzing the impact of the development on the sewer infrastructure and that any improvements are born by the developer. o:\group\deve _ser\stfrpt\97-102.doc 4. That a tree survey be submitted prior to the zoning becoming effective and that special consideration be given to the preservation of valuable trees at the time of site development. No trees are to be removed until a site plan is submitted and without the express permission of the Project Review Committee. 5. That there be a 100' landscaped buffer area between the subject site arid the future R-5 to the north and east. Related Advisory Board Recommendations: N/A City Attorney Recommendation/Comments: Approved as to form. Commission Action Options: Approval, approval with conditions, or denial of request Supporting Materials: 1. Location Map 2. Application 3. Engineering and Notification Information o:\group\deve _ser\stfrpt\97-102.doc ENGINEERING Water: This property has adequate water service from an existing water line in the University Drive right-of-way. Sewer: As stated in a recent rezoning case from A-P to C-B (Planning Case 97-101), there is marginal capacity remaining in the sewer line that serves the northern portion of the City. In that case the rezoning request was compatible to the surrounding zonings and was similar to the existing zoning for that property. In this rezoning case, the proposed C-B zoning is in no way similar to the R-lzoning currently in place. For this reason, the developer must submit a sewer impact study that analyzes the impact of the proposed development on the existing sewer infrastructure. If this study indicates that the existing infrastructure is not capable of handling the increased demands, then the developer must assume the cost of the necessary sewer improvements. Streets: This property has access to University Drive which is classified as a major arterial and has sufficient capacity. Off-site Easements: Not applicable. Sidewalks: At thetime of final plat, the need for sidewalks will be addressed. Drainage: The detention requirements for this property will be reviewed at the time of final plat or site plan review. Flood Plain: This property is located within the 100-year flood plain with designations of Zone "AE" and Zone "A". The areas of Zone "AE" have base flood elevations determined, but the areas of Zone "A" will require a hydraulic analysis to determine the base flood elevations. Oversize Request: Not applicable. Parkland Dedication: Not applicable. Impact Fees: Not applicable. NOTIFICATION: Legal Notice Publication(s): 2-19-97,3-12-97 Advertised Commission Hearing Dates(s): 3-6-97 Advertised Council Hearing Dates: 3-27-97 Number of Notices Mailed to Property Owners Within 200': 11 Response Received: None as of 2-27-97 o:\group\deve _ ser\stfrpt\97 -1 02.doc