Ordinance Requirements:
Provide sidewalk details.
Note that the permanent curb details is a "Pavement and Permanent Curb" detail or break
the two details out separately.
Indicate the proposed flood plain limits and note the elevation. (The floodplain and
floodway do not seem to be correct since they cross each other.)
Indicate fire lanes.
® Indicate gallons per day for the sanitary sewer loading information.
e Note the following tap sizes as part of the "Plumbing Demands": Sanitary Sewer 6" tap,
Water 3/4" meter, and Irrigation 1" meter. ,
Screen the first parking space from Balcones with shrubs, wall or berm.
® Note the "Drainage and Public Utility Easement" on the Utilities and Landscape plan,
sheet SP-1.
The existing 1S" sanitary sewer line along the rear of the lot does not match the location
shown on the grading plan. Indicate the location of the sanitary sewer line as shown on
the grading plan.
The parking space .located in the rear near the. building and the drainage and public utility
easement may have to be eliminated in order to ensure proper back out depth.
Ensure that the sanitary sewer service line can connect to the existing manhole. There is
an additional line that intersects this line at a skew.
Comments/Concerns:
_ Coordinate electrical service requirements with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
The one 4" conduit shown for GTE on the site plan is sufficient. The conduit shall be
provided and placed by the owner/developer. The conduit shall have a pull string in it.
The conduit shall tie into the existing conduit placed to this lot. The existing conduit is
coming from a GTE manhole placed between lots C3-and C4. Please coordinate telephone
service details with G.T.E.. Representative Laverne Akin at (409) 821-4723.
PROJECT REVIEW COMMITTEE REPORT
May 17, 1996
TO: ConstantinBarbu
2909 South Texas Avenue, Bryan, TX 77802
Jeff McDowell, MWM Corporation
P. O. Box 10220, College Station, TX 77842
Don Garrett, Garrett Engineering
4444 Carter Creek Parkway, Suite 108, Bryan, TX 77802
FROM: Project.Review Committee ~~
Sabine Kuenzel, Senior Planner
Kent Laza, City Engineer
Kyle Hawthorne, Planning & Zoning Commission Chairman
Others Attending
Natalie Thomas, Planning Technician
Shirley Volk,. Development Coordinator
Tony Michalsky, Electrical Operations.Coordinator
SUBJECT: Site Plan -Rosewood Townhonzes; proposed. multi-family development totaling
D.83 acres with 12 living units located on lot CS of Southwood Valley Section 30
(Building E) along Balcones Drive._(96-500)
A Project Review Committee meeting was held Wednesday, May 15, 1996 to discuss the above
mentioned site plan. Planning & Zomng'Commisson Chairman. Hawthorne moved to approve the
site plan with the following ordinance requirements and comments. The following is a .list of
ordinance requirements: identified by the Project Review Committee. This list does not
relieve the applicant of total compliance with all current ordinance requirements.
CONDITIONS OF APPROVAL
Ordinance Requirements:
Provide sidewalk details.
_ Note that the permanent curb detail is a "Pavement and. Permanent Curb" detail oar break
the two details out. separately.
_ Indicate the proposed flood plain limits and note the elevation. (The floodplain and
floodway do not seem to be correct since they cross each other.).
Indicate. fire lane. markings.
_ Indicate gallons per day for the sanitary sewer loading information.
Note the following tap sizes as part of the "Plumbing Demands": Sanitary Sewer 6" tap,
.Water 3/4" meter, and Irrigation 1" meter..
PRC Report
Rosetivood Toivnho~nes, Bldg E
Case #96-500
Page 2 of 2
Ordinance Requirements (cont.):
_ Screen the. first parking space from Balcones with shrubs, wall or berm.
_ Note the "Drainage and Public Utility Easement" on the Utilities and Landscape plan,
sheet SP-1.
_ .The existing 15" sanitary sewer line along the rear of the lof does not match the location
shown on the grading plan. Indicate the location of the sanitary sewer line as shown on
.the grading plan..
_ The parking space located in the rear near the building and the.. drainage and public utility
easement may have to be eliminated in order to ensure proper back out depth.
_ Clarify. the location of the proposed sanitary sewer service line. Show the connection to
one of the two existing sewer mains:
Comments/Concerns:
_ Underground electrical service is required and the developer is .responsible for 20% of the
cost of electrical service. Complete and return the Electrical Request Form proviided at
the meeting. The developer i also responsible for installing all .conduit per city design and
requirements. (Three 4" conduits from the transformer to the meter pack are required.)
Provide the service main size and ...the location of the required .outside disconnect.
Coordinate electrical service requirements with. Electrical Operations Coordinator Tony
Michalsky at (409) 764-36.60.
_ The one 4" conduit shown for GTE orr the site plan is sufficient. The conduit shall be
provided and placed by the owner/developer.. The conduit shall have a pull stringy in it.
The conduit shall. tie into the .existing conduit placed to this lot: The existing conduit is
coming from a GTE manhole placed between lots C3 and C4. Please coordinate telephone
service details with G.T.E. Representative Laverne Akin at (409) 821-4723.
City .Engineer Laza seconded: the motion to approve the site .plan with the above mentioned
conditions which passed unopposed (3 - 0).
SUBMIT. 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REMISED
SITE PLAN ATTACHED TO CONTINUE WITH..PHASE II OF .THE BUILDING FERMIT
PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT
COORDINATOR SHIRLEY VOLK AT (409) 764-3570.
APPEAL .PROCESS; An applicant may appeal the .decision of the. Project Review. Committee
to the .Planning .and Zoning Commission within five days. after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual acceptance of all .conditions
imposed,. and a waiuer and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law, An applicant appealing the decision of the PRG shall file ten copies of
the final site plan as approved by the PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a wrrtten explanation of those items being appealed.' Until said copies
are on file, no further development approval shall occur, and no further action by the Comrnissron
shall take place: An .applicant may appeal only certain aspects of .site plan review, and in the
absence of discretionary review. by the Commission, or review. pursuant to a petition,_ all other
aspects. of the site plan shalLbe final. Any notice of appeal shall state with. particularity the aspects
which are to be appealed. Coordinate appeal process through Development Coordinator Shirley
Volk at (409) 764-3741..
.--~ ~~
~ s. ~
~~ ~. ~
I
r ~ RC REPORT
---~~ewood Townhoines
Case #9b-500
Discretionarvltems:
_ None.
Ordin/ance Requirements:
V Provide sidewalk details..
~,~~ ~,~
~~~~~~-
~~~,
C~ -~~
Note that the permanent curb details "Pavement and Permanent Curb" detail or break
the two details out separately.
t/ Indicate the proposed flood plain limits and note the elevation. (The floodplain and
floodway do not seem to be correct since they cross each other:)
/~ ~
~/ Indicate fire lane: ?~ ~-
Indicate gallons per day for the sanitary sewer loading information.
G~ Note .the following. tap sizes as part of the "Plumbing Demands": Sanitary Sewer u" tap,
Water 3/4" meter, and Irrigation 1" meter.
Screen. the first parking space from Balcones with shrubs, wall or berm.
Note. the "Drainage .and Public Utility Easement" on the Utilities and Landscape plan,
sheet SP-1.
The existing 15" sanitary sewer line along the rear of the lot does not match the location
shown on the grading plan. Indicate the location of the sanitary sewer line as shown on
the grading plan.-
~~ The asking s ace located in the rear near the building and the draina e and ublic utilit
P p g P Y
easement may have to be eliminated in order to ensure proper back out depth.
~~ Ensure that the sanitary sewer service line can connect to the. existing manhole. There is
_ The one 4" conduit shownfor GTE on the site plan is sufficient. The conduit shhall be
provided and .placed by the owner/developer. The conduit shall have a pull string in it.
The conduit shall tie into. the existing conduit placed to thus .lot. The existing conduit. is
coming from a GTE manhole placed between lots: C3 and C4: Please coordinate telephone
service details with G.T.E. Representative Laverne Akin at (409). 821-4723.
a~ additional In that intersects. this line at a slcew.~-~ ~~ ~~~
~' ~
~, Comments/ oncerns: ~,~
Coordinate .electrical service requirements with Electrical Operations Coordinator Tony
Miclzalsky at (409) 764-3660.
Staff. Project Review Committee Meeting
May 15, 1996
SITE PLAN
Rosewood Townhomes (96-500)
Requirements
Underground electrical service .required.
Electric Service Request Form (see. attached) fill out. and return.
Developer is responsible for 20% of the cost of electrical service.
Developer installs all conduit per city design and requirements on property.
3 - 4 inch conduits from transformer to meter pack.
Information Needed
Service-.Main Size
Outside disconnect required.