HomeMy WebLinkAboutMinutesPROJECT REVIEW COMMITTEE REPORT
August 2, 1996
TO: Nobel H: Douglass, Douglass Nissan, Ina
1214 South Texas Avenue, Bryan, TX 77803
E. Wayne Alderman, .Castles Design Group.
4120 Bellaire Boulevard, Houston, TX 77025
Thomas Baber, Kling Engineering
4103 Texas Avenue, Suite. 212, Bryan, TX 77802
FROM: Project Review Committee
Sabine Kuenzel, Senior Planner
Steve Homeyer, Graduate Civil Engineer
Winnie Garner, P&Z Representative
Others Attending
Natalie Thomas, Planning. Technician
Shirley. Volk, Development Coordinator
Ton Mies, Fire MMarshal
Lance. Simms, Building Official
Laverne Akin, GTE Representative
David Durough, Lone Star Gas Representative
Don Fazzino, Lone Star Gas Representative
SUBJECT: Parking Lot Plan -Douglass Nissan; proposed new automobile dealership
including sales and- service buildings to be located near the .southeast .corner of the
University Drive and East. Bypass intersection, lot 1 of Greensworld Phase Two
totaling 3.817- acres. (96-417)
A Project Review Committee meeting was :held Wednesday, July 31,..1996 to discuss the. above
mentioned, parking lot plan. Graduate Civil Bngineer Homeyer moved to approve the site plan
with the following ordinance requirements and comments: The following is a list of ordinance
requirements identified by the Project, Review Committee. This list does not relieve the
applicant of total compliance with all current .ordinance requirements.
CONDITIONS OF APPROVAL
Ordinance Requirements:
Site Plan Related
Note the distance from the gore intersection to the proposed driveway along the State
Highway 6_Frontage Road.. Also note. the radii dimensions of this driveway. (A driveway
permit. from the Texas Department of Transportation will be required prior to construction
of the driveway within. -the Wight-of--way. Coordinate the application and submittal
requirements with Graduate Civil Engineer Steve Homeyer at (409) 764-3570:.)
" PRC Report
Douglass Nissan
Case #96-417
Page 2 of 3
Ordinance Reuirements !cont.):
Site Plan Related
Note the finished floor elevation for the proposed sales and service buildings.
_ Indicate if there is any floodplain on the subject property. (Either show the location of the
floodplain or note that there rs no floodplain on the property.)
_ Submit minimum, maximum and average. water demands in gallons per minute, sanitary
sewer demands in gallons per day and irrigation demands in gallons per minute.
Show the existing and proposed utilities.
_ Show the water meter locations.
_ Coordinate access to the proposed dumpster location with Sanitation Superintendent Jim
Smith at (409) 764-3690.
Darken the ramp areas near the handicap parking spaces so that they are clear.
_ A raised parking island is required at the end of the double row of parking located near the
northwest corner of the site.
_ If canopies are proposed around the sales or service buildings, note the height of the
canopy on the site plan.
_ Relocate the proposed fire hydrants so that all parts of the proposed buildings are within
300' of a hydrant as the hose lays off of the truck.
_ Provide dimensions :and reinforcement details for the sidewalk grate on sheet A1.06 or
remove the detail if not used on the site.
Note pavement thickness and reinforcement details for the curb detail on page A1.06.
Clarify general note #5 to stated that a knox box is required for the front gate only. Keys
will be required to all other gates interior to the site.
Note that the proposed fuel tanks will meet the 1994 Standard Fire Code and NFPA 30.
Comments/Concerns:
Redlined sheets C-1, C-2, C-3 and C-4 are being returned to the applicant. The redlined
plans mush be resubmitted with the revised construction documents to assist. staff in
reviewing the.: documents: more efficiently.
_ Coordinate electrical service requirements with Electrical.Operations Coordinator Tony
Michalsky at (409) 764-3660.
w ~ '` PRC Report
Douglass Nissan
Case #96-417
Page 3 of 3
Comments/Concerns:
G.T.E. has a fiber optic cable in the 20' utility easement along the Highway 6 Frontage
Road. Please call for a locate prior to digging at 1-800-344-8377. The developer is to
provide and place two 2" diameter PVC pipe with pull string from the utility easement
along the frontage road to the outside building termination (dmarcation point). The PVC
pipe. shall ell up 4' at the.terminaton point and be capped. The service entrance should be
located within 20' of power service and no closer than 36". If termination is not within
20', a 8' x 5/8" ground rod must be .placed at the base of the termination point. Please
indicate on the site plan where the conduit. will be placed and mail a copy to Laverne. Akin
at GTE, 30,1 Industrial Boulevard,' Bryan, TX 77803. Coordinate telephone service
details with G.T.E. Representative Laverne Akin at (409) 821-4723.
Planning and Zoning Commissioner Garner seconded the motion to approve the site plan with the
above mentioned conditions which passed unopposed (3 - 0).
SUBMIT 4 COMPLETE. SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERNIIT
PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT
COORDINATOR SFIIRLEY YOLK AT (409) 764-3.570.
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within ,five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions
imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant. appealing the decision of the PRC shall file ten copies of
the final. site plan as approved by the PRC, showing all changes .and requirements imposed by the
PRC, and. accompanied by a written explanation of those items being appealed. Until said copies
are on file, no further development approval shall occur, and no further action by the Commission
shall take place.. An applicant may appeal only certain aspects. of site plan review, and in the
absence. of discretionary review by the Commission, or review pursuant to a petition, .all other
aspects of the site .plan shall be final. Any notice of appeal shall state with particularity the aspects
which are to be appealed. Coordinate appeal process through Development Coordinator Shirley
Volk. at (409). 764-3741.