HomeMy WebLinkAboutMinutes.~
PRESUBIVIISSION CONFERENCE REPORT
June 7, 1996
TO: Bill Mitchel, Integroup; Inc.
7077 Bonneval Rd., Suite 450, Jacksonville; FL 32216
John Friedman, Jr.; Bury & Pittman, Inc.
3345 Bee Caves Road,-Suite 200, Austin, TX 78746
Mike McInturff, WH1V1, Inc.
2717 Rio Grande Street, Austin, TX 78705-4018
FROM: Presubmission Conference
Sabine KuenzeI, Staff Planner
Kent Laza, City Engineer
Charles .Smith, P&Z Representative
Others Attending
Shirley Volk, Development Coordinator
Tony Michalsky; Electrical Operations Coordinator
Laverne Akin, G.T.E. Representative
George McLean, CSISD Representative
SUBJECT: P~•elimin~rry Plat - Mehose Subdivision; proposed subdivision totaling 54.3 acres
located on the southwest corner of Luther Street & Jones Butler Road to include
three multi-family lots. The property is currently zoned R-I Single Family
Residential, M-2 Heavy Industrial, R-7 Mobile Homes. and R-5 Medium Density
Apartments; however, a rezoning request is pending for R-5 Medium Density
Apartment zoning. (9b-308)
A Presubmission Conference meeting was held Wednesday; June 5; 1996 to discuss the above
mentioned preliminary plat.. The following is a list of staff recommendations, ordinance
requirements and comments identified by the Presubmission Conference. This list does not
relieve the applicant of total compliance with all current ordinance requirements.
Staff Recommendations:
The Trafficlmpact Study does not support the rational for ending Southwest Parkway in a
cul-de-sac and the extension of Southwest Parkway is shown on the City's Thoroughfare
Plan. Staff recommends an amendment to the Thoroughfare Plan to reduce Southwest
Parkway to a collector street instead of the minor arterial designation as shown on the
Plan. As part of this amendment, Jones-Butler Road should be upgraded to a minor
arterial instead of it's current designation as a collector street.
The dedication and construction of Southwest Parkway through this property to collector
street standards. Staff recommends that Southwest. Parkway not connect to Luther Street
at this time until it is improved. to handle the traffic load. The applicant may construct
Southwest Parkway to the 'entrance of the .multi-family. develapment .and. guarantee the
remaining portion of the street to Luther Street. A temporary turnaround may be required
if the street is initially constructed past the. multi-family driveway entrance. (Clearly
designate the lot numbers on each side of Southwest Parkway.)
PRC Report
Melrose Subdivision
Case #96-308
Page 2 of 3
Staff Recommendations (cont.):
Staff recommendsimprovements to Luther Street if a higher density than R-4 is requested.
If the .multi=family development accesses Luther.Street, the developer is responsible for
improvements to Luther Street to meet current collector street standards through the
entire length of the subject property. Luther Street must be a minimum of a 60 foot right-
of--way, and due to the location ,the additional: required right-of--way must be dedicated
,,:
from this property.
_ The developer: is responsible for improvements to Jones-Butler Road along the frontage of
their property to minor arterial street standards.
NOTE: Following .the Project Review Committee meeting,. development staff met with the
developer to discuss the above four items, crud it was agreed that the developer would
resubmit the traffic i~rzpact study addressing the concerns listed. .Upon. receipt of that
study staff will reconside~~ its conchrsions based on the results of that study and make
approp~°iate changes to the. reco~r7rrzendations.
Ordinance Requirements:
Thee entire Ray A. Walker property located along Luther Street must be included in both
the preliminary and final plats in accordance with the City's Subdivision Regulations.
_ Off-.site drainage easements will be required. from this property downstream to the primary
channel or right-of-way.
_ The. sanitary sewer.. system must be master planned for the entire area so that the out
parcels along Luther Street have access to the sewer line.
_ The following water line sizes are required: a 16" water line along Southwest Parkway to
Luther .Street .and back to Jones-Butler Road and a 12" .water line down Luther. Street to
the west property line.
_ Show proposed locations for water and sanitary sewer lines that will not be located in
rights-of--.way.
A fee for parkland dedication in the amount of $225 per dwelling unit will. be required in
lieu of actual land dedication . (Proposed 462 units x $225 = $103,950)
Remove the note and boundary references to the " 24' Landscape Reserve Setback".
_ Show a point of beginning and basis of boundary bearings.
Note the right-of--way widths on Luther. Street, Southwest 'Parkway and Jones-Butler
Road.
Reference the current date of the Flood Insurance Rate Map (1992) in general note #5.
a,
PRC Report
Melrose: Sarbdivison
Case #96-308
Page 3 of 3
Comments/Concerns:
_ Coordinate easement locations and telephone service details with G.T.E. Representative
Laverne Alvin at (409) 821-4723.
Show existing electric line. Include a note indicating it _will be moved. Coordinate with
Electric Operations Coordinator Tany Michalsky (409)764-3438 to move the existing line.
Provide easement for proposed lines.
SUBMIT THE 1VIYLAR ORIGINAL AND 13 COPIES OF THE. REVISED PREI;IMINARY
PLAT BY WEDNESDAY, TUNE 12, 1996 TO BE INCLUDED IN THE PLANNING AND
ZONING PACKETS FOR THE MEETING OF THURSDAY,. JUNE 20, 1996.. THE CITY
COUNCIL WILL. CONSIDER THE PLAT ON THURSDAY, JULY 11, 1996. BOTH
MEETING WILL BE AT 7:00 PM IN THE CITY HALL COUNCIL ROOM LOCATED AT
1101 TEXAS. AVENUE SOUTH. COORDINATE DETAILS WITH DEVELOPMENT
COORDINATOR SHIRLEY VOLI~ AT (409) 764-3570..
STAFF PRC REPORT
Melrose Subdivision
Case #96-308
Staff Recommendations:
_ The Traffic Impact Study does not support the rational for ending Southwest Parkway in a
cul-de-sac and the extension of Southwest Parkway is shown on the City's Thoroughfare
Plan. Staff recommends an amendment to the Thoroughfare Plan to reduce Southwest
Parkway to a collector. street instead. of the minor arterial. designation as shown on the
Plan. As part of this amendment, Jones-Butler Road should be upgraded to a minor
arterial instead of it's current designation as a collector street.
_ Concerning the rezoning request, staff recommends R-4 Low .Density Apartment zoning
instead of the requested R-5 Medium. Density Apartment. zoning. The R-4 zoning is more
in compliance with the Comprehensive Plan and it will lessen. the impact on the
infrastructure in the area. Staff recommends improvements to Luther Street if a higher
density than R-4 is requested.
The dedication of additional right-of--way from this property for Luther Street. Luther-
Street must be a minimum 60' right-of--way.
The dedication and construction of Southwest Parkway through this property to collector
s street standards. Staff recommends that Southwest Parkway not connect to Luther Street
at this .time until it is improved to handle the traffic load. The applicant may construct
Southwest Parkway to the entrance of the multi-family development and guarantee the
remaining portion of the street to Luther Street. A temporary turnaround may be required
if the street is initially constructed past the multi-family driveway entrance. (Clearly
designate the of numbers on each side of Southwest Parkway.)
_ The developer is responsible for improvements to Jones-Butler Road along the frontage of
their property..to minor arterial street standards.
If the multi-family development .accesses Luther Street, the developer is responsible for
improvements to Luther Street. to meet current .collector street standards through the
entire length of the subject property.
Ordinance Requirements:
_ The entire Ray. A. Walker property located along Luther Street ,must be included in both
the .preliminary and final. plats in accordance with the City's Subdivision Regulations.
Off-site drainage easements will be required from this property downstream to the primary
s channel or right-of way. -the --prepesearnwvat"~r -detent~i6n-afeas--showtr -on-the
_ pr_elmnar~-plate Wray-be-'rneQrreet-=r~-ap-pear-s-that-~he~-ares`rrp~h~ room t~-deve~aprt~ent~
_ .The sanitary sewer system must be master planned for the entire area so that the out
parcels along. Luther Street have access to the sewer line.
staff PRc
Melrose Sub.
Case #96-308
Page 2 of 2
Ordinance Requirements (cont.):
_ The following water line sizes are required: a 16" water line along Southwest Parkway to
Luther Street and back to Jones-Butler Road and a 12" water line down Luther Street to
the west propertyline.
_ Show proposed locations for water and sanitary sewer lines that will not be located in
rights-of-way.
_ A fee in lieu of parkland dedication is required in the amount of $225 per dwelling unit.
(Proposed 462 units x $225 = $103,950)
Remove the .note and boundary references to the " 24' Landscape Reserve Setback".
Show a point of beginning and basis of boundary bearings.
_ ,Note the right-of-way widths on Luther Street, Southwest Parkway and Jones-Butler
Road.
Reference the current date of the Flood Insurance Rate Map (1992) in general note #5.
Comments/Concerns:
_ Coordinate easement locations and telephone service details with G.T.E. Representative
Laverne Akin at (409) 821-4723.
Draft P&Z Minutes
June 20, 1996
Page 1 of 3
AGENDA ITEM NO. 4: Public hearing to consider a rezoning request for the Melrose
Subdivision totaling 52.3 acres located along the south side of Luther Street approximately 1550'
east of the F.M.. 2818 intersection from R 1 Single Family Residential, R-5 Medium Density
Apartments, R-7 Mobile Homes and M-2 Heavy Industrial to R 5 Medium Density Apartments.
(96-108)
City Planner Kee presented the staff report for both the rezoning request and the preliminary plat of the
Melrose Subdivision. The request R-5 zoning is in .compliance with the current Land Use Plan and is
compatible with existing and. future uses in the immediate area. The current Land Use Plan shows high
density residential, which is not expected to change with the new land use plan that is being prepared by
the consultants. Under the existing zoning, the area could build: as many as 708 dwelling units and a fair
sized heavy industrial use. The requested zoning would eliminate the heavy industrial and allow up to
1304 dwelling units under the maximum density., The addition of the. proposed 462 units will impact the
area sewer line and street systems. Any rezoning in the area will therefore need to be accompanied by
conditions to mitigate those negative impacts. Luther and Jones-Butler'-are. substandard and will be
heavily impacted because they are to serve as primary routes to .and from the proposed multi family
complex.. Due to this desire on the part of the. applicant to orient traffic to these two streets, staff
recommends that the zoning be approved only with assurance that Luther and- Jones-Butler be improved
for the portions of the roads that immediately abuf the subject property. Southwest Parkway is built to
major arterial standards but it dead-ends into the south side of the subject property. The Thoroughfare
Plan. would :require its extension through the :property to Luther. The applicant wishes to end
Southwest Parkway for purposes of security and continuity. On the Thoroughfare Plan, the Southwest
Parkway .extension north to Luther is intended to provide additional through movement, as well as to
provide access to better distribute traffic in the area. The additional. through movement is not as critical
since this proposal is for one multi-family development. Traffic distribution is more critical. This can be
accomplished through .proper site design whereby this. project would access Southwest Parkway where
it will end on the south side and would access Luther on the north side. This will distribute some traffic
to the south and some traffic to the north. The applicant has offered an upgrade .and additional right-of-
way dedication for Luther for a distance equal to the property frontage. This upgrade should begin at
Marion Pugh and extend to the west for. this distance.. Jones-butler should be improved along the
property frontage within the existing 80' right-of--.way. The sewer ystem in the area west of Wellborn
has been problematic for. a number of years. The. City has planned for improvements to this area in the
next fiscal year. This budget has not yet been adopted by the Council. ' In .order. to support a
development of this magnitude, these improvements must be made prior to or in conjunction with
commencement of construction of the project. Approval of the requested .rezoning will almost double
the amount of dwelling units that may be built. With approval of this rezoning, it is imperative that the
Christine Lane sewer line .improvements be approved later this year by the' City Council as part of the
next Capital Improvements' budget: Staff recommended approval of the. rezoning request with the
condition that before. the R-5 .zoning becomes effective, the property- owners. enter into a development
agreement to upgrade Luther and provide additional right-of--way where necessary, to upgrade Jones-
Butler to arterial standards along the entire extent of the property,` and to make the necessary. sewer
upgrades rather' than the .City reimbursement of all or part of the costs be negotiated as part of the
development agreement, to end Southwest ~'arkway in a fashion acceptable to the City in terms of turn-
around needs, to ensure access to Southwest Parkway from the development and to limit the density to
the number of dwelling units proposed.
Draft P&ZMinutes
June 20, 1996
Page 2 of 3
City Planner Kee stated that the development agreement could also provide for financial participation
for any of these improvements depending. on the .demand impact of the development as evidenced in
impact. studies that would be presented as a part of any oversize .participation request. Staff
recommended approval of the preliminary .plat once the rezoning is effecting with the condition. that the
utility easements and extensions issue to the parcels that are not a part of this. development be
postponed until the final plat. Staff will continue to work with the applicant and the City's legal
department on this issue to be discussed further at the time of final plat. There would be no final plat
considered until the development agreement is completed.
Chairman Hawthorne opened the public hearing.
Representative. ofthe applicant, Greg Strmiaska of Bury & Pittman in Austin, informed the Commission
that there are a number of issues associated with the development of the property. The. developer is on
a tight time schedule because the target opening date is fall of next year with construction beginning
September 1, .1996. The proposed 462 units may .change slightly to 480 units and he would like to
work with staff on clarifying the number of units in the development agreement. He stated that the
developer has agreed to take access to Southwest Parkway in lieu of extending it through the property
and providing improvements to Luther and Jones-Butler Road. Mr. Strmiaska stated that he is
concerned with the extent at which. the improvements to .Luther ..and Jones-Butler Road will extend
beyond their property. but that can be worked out with: staff before the final plat.. Sanitary sewer is an
issue' in this case: and the developer would like to continuing exploring .the options with. staff including
the overall impact the development will have on the: system.. He stated that the developer is not
opposed to looking at utility: extensions but .not without something that would be a fair agreement for
both parties. The developer should not be obligated to extend utilities to adjacent property owners. In
discussing this issue with several attorneys, there have been several .cases that say if you do not crate a
need o extend utilities, then you are not required to extend :utilities. Mr. Strmiaska requested that this
issue also be delayed until the final plat to give everyone more time to discuss the alternatives.
Commissioner Hall questioned if the developer is willing to front the money for the sanitary sewer line
to later be reimbursed for the City's portion of the line. He also questioned the number of people that
will be living at the proposed complex.
Mr. Strmiaska stated that. they are willing to work with staff on the sanitary sewer line issue and if based
on the density of the .development the improvements are needed, the developer will take that into
consideration. There. will: be approximately 1500 tenants of the complex with a combination. of 2, 3 and
4 bedroom units. All private bedrooms will have their own bathroom with the .entire complex being
fully secured with. a gated :entrance.
m
Draft P&ZMinutes
June 20, 1996
Page 3 of 3
Fain McDougal of` 415.0 Shadowbrook informed the Commission that he was present on behalf of
Raymond C. Goriski, the owner of a six acre tract downstream of the proposed development. The
owner is in favor of the development of the subject property and thinks it will be an excellent addition to
the area. However, with the development of this area, the: ultimate design of the water. and sanitary
sewer: services. should be considered. The needs of the surrounding property owners should be
addressed and studied as the overallarea.:develops. Mr. McDougal stated that there is a tremendous
amount of development potential in the area if the utility system is adequate.
Chairman Hawthorne closed. the public hearing.
Commissioner Gribou moved to recommend approval of the rezoning request of 54.3 acres located on
the southwest corner of Luther Street and Jones-Butler Road from M-2 Heavy Industrial, R-1 Single
Family, R-5 Medium Density Apartments and R-7 Mobile Homes to R-5 Medium Density Apartments
with the staff recommendations. Commissioner Lightfoot seconded the motion.
Chairman Hawthorne stated that he agrees with Mr. McDougal in that any improvements the City does
of a capital nature do not need to be done piecemeal as each. property is developed. It is in the city's
interest and the developers. that the .area is master planned and not put together like a puzzle.
The motion to recommend approval passed unopposed (5 - 0).