HomeMy WebLinkAboutMiscellaneous05/16/96 13:20 $409 775 0453 BRAZOS CO RD&BR
,. .,
s aaio~E °~¢s
FACSIMILE TRANSMISSION COVER SHEET
70TAL NO. PAGES ~ (ir-cluding covet sheet}
DATE:
TO:
FIS--X NO.:
FROM:.
~o ~ ~ c!
~~ ~-~~9~
. ~/'~o-ur-~
BRAZOS (~'OUNTY ROAD AND 6RIDGE DEPARTMENT
2617 HWY. 21 WEST
BRYAN,. TX 77803
FAx# (4Q9~775-0453
~] ool
COMMENTS:
05/16/96 13:20 $=109 775 053 BRAZOS CO RD&BR C~7j 002
BRAZOS COUNTY
ROAD AND BRYDGE DEPARTMENT
R~ci!scrrd F. Yare~+e Pte. C ~ '
Alvin W. 7one~,'County Judge
Commissioner Gary l~ottnn
Preclnet 1
Commiasl~~xi' 13atidY Shna
pree[nct 3
May 16, 1996
McClure Engineering, Inc.
1722 groadmoor, Suite 210
Bryan, TK 77802
RE: Preliminary Plat Of Willow Run Phase Two
42.3286 Acres, John Childress Survey,- A-92
Robert Stevenson. Leagus, A-54
College Station, Brazos County, Texas
To Whom. May Concern ;
aommiaaioner 3andic Walloer
Treclnet 2
Commissioner Cnrsy Cauley
precinct a
On May 14, 1996, the Brazos County Cornmissioners' Court discussed and approved the
referenced. pla# with the #ollowing exception:
Need to show culvert and its calculated size under .proposed Headwater
Lane (private}.
if you need further information please call our offce at 409/822-2127-
Si erely,
~~-~'
Richard 1=. Vance, P.E.
County Engineer
WELLOV~IR2.PP
cc: Office File
$ ~n, 4'ctas 77803 (04)822-2127
2617 highway 21 Weet ry•
..MEMORANDUM
TO: Planning and Zoning Commission
FROM: Sabine Kuenzel, Senior Planner
DATE: May 9, 1996
RE: Willow Run Phase 2
The subject property is in the City's ETJ, about 0.5 miles outside the City Limits off of
Capstone, which is off of Wellborn near Barron Road. The applicant wishes to add a
phase to Willow Run by creating 41ots and a new private cuT-de-.sac, totaling 42.33 acres.
The private .drive exceeds the length of a cul-de-sac and the applicant is requesting a
variance to that standard. In instances where large rural tracts are proposed within the
ETJ, the City has granted such.:variances.
In addition, the applicant is requesting a :variance to the standards for surfacing. He
intends to meet the gravel .base and ROW .width requirements but does not wish to
providethe 2-course asphalt surface because. the road is to remain private. If the road is
to come under County maintenance in the future, the asphalt surface -.must first be
.provided. The case will come before the County Commissioners' Court just before the
P&Z meeting. The County's decision will be provided to the P&Z at that meeting.
The City Staff reviewed the plat at a Presubmission Conference and recommends approval
with the condition that the final .plat will not be processed until the County has approved
the ,preliminary plat.