HomeMy WebLinkAboutMiscellaneous~,~ ~~ a~ From: Steve Homeyer To: NTHOMAS, SVOLK, Smccully Date: 8/22/96 2:04pm Subject: Pebble Creek Phase 6 During construction plans review, I found that they could not place the sidewalks on City ROW where the proposed streets intersect Spearman. I called Tony T. at Wallace Group to have them add radii at these. intersections and he said that it would not be a problem. It does not change the configuration of the plat, but will allow for the construction of the sidewalks without getting on private property. If anyone has a concern with this, please let me know. 1 ~r ~ ~ ^ ~~^ ~ ,c n cn r A ~`' ~'• ('J O .._ t0 a ` -~,~ ;~ A r. .~. N ~ ~ ,... O `~_ C A ~ ~ ~+ '~ ~` .. ~~GQ. ~Il ~~~~ ~~ C. ~ From: Kent Laza To: DGRACE Date: 6/25/97 4:03pm Subject: LC for Pebble Creek phase 6 Deborah, Steve and I have been working with Davis Young to resolve some unfinished items in Pebble Creek 6. The two items involve the construction of the detention pond for the subdivision and the replacement of some poor asphalt on St. Andrews Street. Davis already has a letter of credit for $55,000 on the subdivision for work that has now been done. He wants to apply that same LC toward this work so he can file the-plat. He says the LC is non-specific and covers any repairs we deem necessary. Steve and I agee that the amount is about right and we have instructed Natalie to file the plat .tomorrow (Thursday). Davis has asked for a letter from us outlining what items are now being covered by the $55,000. I would like .you to find the LC and draft a letter for my signature that indicates coverage of $50,000 for the detention pond and its design, and $5,000 for asphalt repairs on St. Andrews. Let me know if I can help. Thanks. CC: SHOMEYER, SVOLK, NRUIZ Y ~ Development Services 1~ Of College Stat1Oll P.o. Box 9960, coin FAX Phone: Fax phone: CC:' TX :77842-9960 Date: G~''t. Number of pages inc uding cover sheet: F om: Phone: (409) 764-3570 Fax phone: (409) 764-3496 REMARKS: ^ Urgent ~or your review ^ Reply ASAP Please comment tiU li vTST u1, i.7U~ PROJECT pE.'ILs°d COMMITTEE CTE CO~~dT~ FI~`dAL PLAT - PEEWEE CP~EEK PHASE ~; PROPOSED SL'BL'I.'ISIOPd Tt?mAr rRrC 4~5. ~2 nCpEe nrVlr1~'n rr~nTmn ~fln p_i SIArrr~ 1 L1 VV A 1U AJ L1 liL 11 t\1V Z 34 1 1\l~Li:+ FAMILY L/O~TS LOCATEL' ALOAdC SPEARMA~t HRI [~~'L H~Ti;'EE^d PUTTER COURT ALVL HOCAL~d j 1.J~ ALLEY• ~ ~J i%~u6~.1 {~ CTE HAS ~?O PROHLEM tdITH THE PLAT; HOu'Ei~'ER COAdL'UIT IS REQUIREL' AT SErJERAL STREET CROSSINCS. CAVE DAMS YOL'A:C A COPY OF THE PLAT ?^;ITH STREET CROSSI~ICS MARKER. PLEAS CCIrdTACT LA tl'ERL-dE Al]~1`d ln3T ~V ~JJ Z'..I f~J~~T ~4e~J IF Y~V'Vt HAY~E Al~Y ~UESTIOndS. THA"duS, LA~'ERrdE AKIrdICTE Lone Star Gas Comany August 21, 1996 Project Review Committee City of College Station, TX 2611 Texas Avenue College-Station, TX 77840 Re: Listed Projects/Plats Lone Star Gas contacts for the projects listed on the Wednesday August 21, 3996 PRC Meeting are as follows: 96-817 Parking Lot and Future Commercial Building The Village Shopping Center David Dorough 96-227 Shenandoah Phase 5 David Dorough 96-228 Pebble Creek Phase 6 Don Fazzino 96-229 Freeman.Subdivision David Dorough Oil Well Permit Easterwood Well #A2 none Any questions. about gas service may be refered to the above personnel at the number listed below. T o avid L'. Dorough. Business Development Manager Lone Star Gas 4200 Highway 6 South • Bryan, TX 77802 • (409) -776-0627 • Fax: (409). 776-2175 Staff Project Review Committee Meeting Auguste 21, 1996 FINAL PLAT Pebble Creek Phase 6 (96=228) Requirements Underground service Deve oper installs conduit per city designand specs.. Developer responsible for 20% of city cost of installation of electrical system for subdivision. (See attached form, fill out and return.). Streetlight easements missed on lot 29 & 40 block 25. lot 110 block 22 Other: Streetlights along Royal Adelade Dr. south of St. Andrews need to be the 42.5 ft mounting height to match existing lights. City of College Station Public Utilities Department Electrical Division P:O. Box 9960 College Station, TX 77842 4091764-3452 FAX Contac#s_ Tony Michalsky, Operations Coordinator, 409 764-3438 Ray Havens, .Superintendent, 409 764-3680 RE: ELECTRICAL SERVICE REQUEST We the. undersigned of hereby request electric. service for: Business name location Owner's name Billing address + Phone number Fax number .- We further understand thatwe are#o pay the City of College Station 20% .(plus sales tax) of the total estimated cost of electric service installation and furnish :either "blanket" or "as-built" easement before any work will be done by the City. THIS !S NOT A REQUEST FOR METER`iNSTALLA710N. Estimated Date Construction begins Estimated Construction completion .date Anticipated date permanent service required _ Thank you, Owner (Letter must be signed) MAIL OR FAX,TO ABOVE ADDRESS 08/21/96 12:55 ^C 409 764 3496 DEVELOPMENT SVCS l~ 0 O 1 ~x~~:~c~xe~xc~c~c~~:~c~~~e~xe~c~~xe~:~~~:~ :~:~~ ACTIVITY REPORT :~~~ x~:~x~~~~~~~~~~x~~:~~~x~~~~~~~~~~ TRANSMISSION OK TX/RX N0. CONNECTION TEL CONNECTION ID START TIME USAGE TIME PAGES RESULT 7104 177762924ppp161 08/21 12:52 03'13 5 OK The Gale Arnold, R.P.L.S. George Jezek, A.LA. W~IIaCe Mike Keahey, PE., R,P.L.S. June E. Lykes, P.E. Gr®Up, ~f1C. George E. "Jed' Walker, Jr„ P.E. En Ir1e2rS ®AfChlteC~'S ^ Planners ®SurVeyOfS R.E. "Bob" Wallace, PE., R.P.LS. g Otto E. Wiederhold, P.E. John F. Winkler, P.E. August 14, 1996 E City of College Station P. O. Box 9960 I,I College Station,. Texas 77842 Attn: .Kent Laza, P.E. a Re: Pebble. Creek, .Phase VI _ Dear Kent: 1 Attached herewith are. two sets of construction plans for the. above-referenced project for your review and approval. Forthcoming will be the drainage summary addressing the City's preliminary plat comment ,j concerning the impact of post-development stormwater runoff on downstream; water courses. ': We are also submitting 16 blueline prints of the Final Plat of the Project to the Planning Deparhnent for the September 15, 1996 Planning and Zoning meeting. You and your staffhave been great to work with on thisproject, and please call me if you have any questions or concerns. '~ Sincerely, ~ ~v ~i I I George E. "Jed" Walker, Jr:, P.E. The Wallace Group, Ina Attachment P. O, Box 22007- Waco, Texas 76702 One Killeen Center -Suite 205 8225 Central Park Drive-Waco, Texas 76712 1711 E. Central Texas Expressway -Killeen, Texas 76541 (817} 772-9272-Telefax (817) 776:-2924 (81.7) 554-5959 -Telefax (817) 554-5979 lace LETTER OF TRANSMITTAL up, Inc. Engineers ^ Architects ^ Planners. ^ Surveyors TO: clrt G~ Ca~I,I-~E J i ~T-6r'`I DATE: G • ~`f'- 1 Y RE.. PROJECT.• ~(-~~ll. ~1t~.K ~N~ISt b JOB NO: y~I ~ PHASE:. I~ WE ARE SENDING YOU ^ ENCLOSED ^ UNDER SEPARATE COVER THE FOLLOWING O PLANS ^ CUT SHEETS ^ CONTRACT ^ DED/CAT/ON ^ SPEC/F/CAT/ONS ^ WORK PLAT ^ CHANGE ORDER O SHOP DRAW/NGS ,~ PLAT AND/OR FIELD NOTES ^ COPY Of LETTER D ADDENDUM ^ COPIES DATED DESCRlPT10N ~~ /~lAc. ~ "" 'r ~t old' Z ^ FOR YOUR USE ~ FOR YOUR APPROVAL ^ FOR REVIEW & COMMENTS D ^ AS REQUESTED ^ APPROVED AS NOTED D RETURNED FOR CORRECTIONS -D REMARKS: SIGNED: ~(/~..f' ~j~~S~J"'~Z CC TO: The Wal Gro P. O. Box 22007 -Waco, Texas 76702 8225 Central Park Drive, Suita 100 - Waco, Texas 76712 .(817) 772-9272 - (800) 336-1683 - Telefax (817y 776.2924 a•~•~•~•~• ~•~•~•~~~•~•~•~•\• r.r.a. r.rr.r.r.r .r r.r.r. r.r.r CIT1' OF COLLEGE STATION ' + •r•f"r•r'•s~:~i`•i.r•r'•i~i'•r:ar•rr`~•r• ;r pEt1ELUPMENT SERUIGES •' i~i~ i'f i:i'i~i'j i i~i'i:j i~i~j ~i~ ~i r•r~~ ~. . . . . .r r.r .r ` .r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r•r `'`•`•""`'`'`'\'\•\'`"'a'\'\'\'\'a'\""'a'"`' HQi TEXAS AI+E :~:%', :: r ~..\.\.\.\.\.\.\•.•\•\•.•\•\• \•\•\•a•\.\•\•\•a•a•\•\•\• . • •i`•r'i`i'r., '~`'`•'•'•r•r•r•r•r•r•nnr•r•r•r•r•r•rr•r•r•r•r•r•r•r•r TEXAS 7784Q TATIC}N COLL GE •\•4\•\•a•l•\•\ •\•\•1•\•a•a•\°\•\•\•4\•\•\•a•\•\•\•\•\•a•a a a \•\•\•a• r•r•r•nr•r•r•r•r•r•r r r r•r•r•r•r •r• r • , S E •r•r•r•r•r•r•r•r' nr•nr•r•r• •rr r r \•4\•\•\•\•\•t•\•4\•\•\•\•Ya•4t \ \ t•a•i•44\• l t •4a•\•\•\•4\•a•\•a • •\• \•\• Facsimile Cover Sheet To: " Company: Phone: Fax: ( ('~l 11 ~ -- ~q~ .From: Company: Phone: Fax: Date: c~ I ab (~{D Pages including,this cover page: Comments: I ~ (~ / .. -- ~ -•~~ , , ~ _,__~ ~ a.;.;.;.;.;.;.;.;.;.;.o.;.;.. •!•r ! !•r•r•r•r•!•r•hr•r•r•r•r: 7 35 Va•a•a•t•Y\•a•a•a a a \•a•a•a a•a•a '; ' ` .: r ' F f ' ' ` n ' E404~ 70 64- a a ••a .: a • a i i •: : • .. i rr,•/•r•rrr,•r•.•r„rrrr•rrr.rr C4Q47 7fi4-34gfi FaX aaaa•e•s•aaaat•a•vaaaa\a•aa-aaaav •r•r r r r•r•r•r r r r•r•r•r r r r r r nr r r r r a r .•,•a•a•a•a•a•a•a•a•va•a•a•va•a a a a~ a•a•a a s a•v •a•a•a a~ i•a•a•a a a a an•a•a a-a ~ a•a•a a a a a•~•r• r•r•r•/J•rJ•hr•/•r•/•rJ•1•!•f•r•r•I•/•I•rV•hr•P•N ,hr•I•!•r•rJ'r•r•r•/•1Nr•/•/•Pr•hI•!•Phr•r•I•I•)•I ~,•,•a.a•a•va•a•va•an•4a•a•aa a a•a•a•a•a•a a a a~ a•a• - a vvya a s ya.va•e•a•va•a•va a a a Va•a a s a•a•a+a• ~r•nr-r•r•nnr•r•r•r•nnr•rnu r•rr•r•/ r r / r r !•r• •r•r•r•r•r•r nr•rd•nn/•Y•nr•r•r•r•rr•rvr•rd nr•nI•r ...~.a.a.~.a.a.a.a.a.a.a.a•a•a•a•a•a•~•a•a•a•a•a.c•vva•a•a•a•a• .a•a•a•a.a•a•a aa•a•a•ra•a•a•va•a•a•a•a•a•a•a.a•a.a.a.a.a•a•a• ~.rarwr 08/20/96 10:23 '$`409 764 3496 °° DEVELOPMENT SVCS I~ 001 ~~~ ACTIVITY REPORT ~:~~ TRANSMLSSION OK TX/RX N0. CONNECTION TEL CONNECTION ID START TIME USAGE TIME PAGES RESULT. 7082 177762924ppp161 08/20 10:21 01'44 2 OK ~~/ (CITY OF COLLEGE STATION J MEMORANDUM TOs Planning and Zoning Commission FROM: Steve Homeyer, Graduate Civil Engineer DATE: September 19, 1996 RE: Sidewalk Variance for Pebble Creek Phase 6 The applicant. is requesting a variance to the City's sidewalk standard. The applicant is proposing to construct amachine-laid monolithic concrete. curb and gutter section that will include .the sidewalk on all streets where sidewalk is required. The. City's Subdivision Regulations require a..six (6) foot .wide sidewalk when .constructed .directly behind the curb. This requirement allows for a four (4) foot sidewalk to remain clear when a car door is opened.. The applicant is proposing to use a five (5) foot widesidewalk instead of the required six (6) foot.. Please refer. to the attached details to make a comparison between the City's requirements and the section proposed by the applicant. This proposed section does not comply with the requirements of "8-M, :..Sidewalks" 'within the Subdivision Regulations.. In order to be consistent with requirements placed upon other developers, Staff recommends denial of the sidewalk variance request. ENGIf~EERING DIVISION ENGINEERING DIVISI®N Post Office Box 9960 1101 Texas Avenue Posh Office Box 9960 1.101 Texas Avenue College S[ation, Texas 77842-0960 College Station, Texas 77842-0960 (409) 764-3570 (409) 764-3570 The Wallace Group, Inc. Engineers ®Architects ®Planners n Surveyors August 5, 1996 City of College Station P.O. Box 9960 College Station, Texas 77842-0960 Attn: Kent Laza Re: Pebble Creek Phase VI, Variance Request Gale Arnold, R.PL.S. George Jezek, A:LA: Mike Keahey, P.E., R.P.L.S. June E. Lykes, P.E. George E. "Jed" Walker, Jr., P.E. R.E. "Bob" Wallace, P.E., R.P.L,S. Otto E. Wiederhold, P.E. John F: Winkler, PE. Dear Kent: On behalf of the owner of Pebble Creek Development Co., Mr. F.M. Young, we hereby request a variance to both the City's curb and. gutter standard and sidewalk standard. We proposed to construct a reinforced concrete, machine-laid, laydown, monolithic curb, gutter and sidewalk where all sidewalks are required (see attached sketch), including collector streets. Where sidewalks are not required, we propose to construct the laydown curb only. The major differenceabetween what we are proposing and the City's standard; are listed below: • The curb and gutter is 3' wide instead of 2' wide. • .The-curb and gutter is reinforced. • The sidewalk is 5' wide instead of 6' wide Our justifications for this variance are as follows: 1. This proposed curb and gutter is more "driveable" than the standard laydown curb. 2. This proposed curb and gutter will prevent future homebuilders from having to tear out curb and sidewalk to build driveways. The driveways will; start behind the sidewalk. 3. The total width of concrete is still 8', we merely reduced the width of the sidewalk to accommodate the increase in curb and-gutter width.. 4. By keeping the total width 8' or less, the owner will be able. to fabricate a form for his laydown machine, which will greatly increase the quality of construction and enhance long term durability. 5. The proposed curb and gutter section. has improved drainage characteristics over some of the laydown curb already present in College Station. 6. A 5' sidewalk width adjacent to the curb is considered "standard" in other municipalities. If you have any questions or concerns, please. call me. Sincerely, eorge E. "Jed" Walker, Jr„ P.E. The Wallace Group, Inca attachment co; F.M. Young P. O. Box 22007- Waco, Texas 76702 One Killeen Center -Suite 205 8225 Central Park Drive -Waco, Texas 76712 1711 E. Central Texas Expressway -Killeen, Texas 76541 (817) 772-9272 -Telefax (817) 776-2924 (8l7) 554-5959 -Telefax (817) 554-5979 .. 8'-0` 5'-4' 4' COMPACTED ROAD GRAVEL ~! 3 BAR 18" O.C. NOTES: 1. THE. MINIMUM COMPRESSIVE STRENGTH OF THE CONCRETE SHALL 8E .3000 PSI O 28 DAYS. 1'- 2" 1'-6" PROPOSED MONOLITHIC MOUNTABLE CURB.. GUTTER. & SIDEWALK scxF - err - ~• s'-o` 4" REINF. CONC. SIDEWALK WHERE SHOWN ON PLANS 1 /8" FT. --~ r •. STANDARD C&G SECTION W,jADJACENT SIDEWALK ., w :~ .' ri ~ .-^nr.i r.a..+ia+~~~' -~. ,';'''.I:I'~...'f'.~~ G:'C~7Vr.:;,.'i'7:', ~:-".":!I'n."~'i;.q, ~~i . h `~. JUN 12 9~ 0~'„15~ WALLACE WACO SX ,: ~~~.: P. 2 ~'. s . se• ~ ~,,. ,, •~; X0,4 ~'~ `'' ;: v;,/ / ~ ~. / ~ ~ / ` ~; / '~ 5 ~ ;. ~ ~ +r / s ' ~ /' ~ ?r / i ,~ ~ ~ py'f ~~ 1ati ~ Y / ~~ ~ N /~ / ! ~ 'r+ ro ~ ~ ~ ~ +q ~ ~ ~ /r ~ l ~~ ~, .~ ~ ~V 0 na b '~ ~` j ~i n~ ~.s 1~ ~ . U U '`flS' era - ~ N ~ ~ '`~ id / •° d o s i~ ~ a f ~ QQ 1 U. IR '~j V ~ ~~ ~' 4 N ~ ~, ~ e~'ssr / mom`' '~'~ ~ 1 ~ `` II y~~ ~~s~ s ~ $ ~ ~ ~ ~ ~ ~ I~ i,~ ~ ~, i . s i ~~ ~; ~ ~~~ , N ~~ , ~ o~ ~ i I ~0. N ~ 7 N q ~ ~ ~ ~ ' a Q N a W p }} / /~ ;il\ ~N / j N Y f , \ ~ ~~ // ~ `' \ c ~ ? ~ ~ f l: \\ ~,/ ~~ 6, ' > '~ ~ ~ ,~ ~{ ,~ :.:. .."~! \'A/•ti :.~: •:•7"' """1 r:V/ .\~V _~.1 r~67 •' r/ •6. .y..'r,;, •, y { • .C~ i~~' ~~~•; ..•!~, ;.•,,.-.: \'.~::.' ~' ' ..i ~~, •'-i~~e' 7~'1: I° ~ I" ~ 1:r}.'n ~,r':;.'. , ,l~g,' ~. •i7 P'. i1r,,t" ,,~ ~ TUN 12 97 08 16 WALLACE WACO TX ~ ' • `~~• ~ ~~ ~ I r, y ;~ K k ~+3', Q ~. • ~ +,~,3q'~~`~ , ~Vha i 3'+y~ri; i. ~' ¢ ° ~l°~~~`~~1, n ,, , , ,: I.'t' ~.. ~tl'I', .. ja ~ . .rEf., 1 *w M ~~ ,a? a/t~E _ ~ ~ ~~5,; 1!'n,~~~ ~ i ~ I+~'.,~)r~,,)'a.1~'~':'~r~+r 7 ..1:' .~ ' ' : • ,:., { i. ::.. ,, ~ r ..t~ w ~.. ,; ,y. ~ .• •• ...:.... ~.. .• 8 P.U.E. ...r.., . ~ .; ,;;,:. ,;i'"; ,'t0' P. I,,;:,:.,.r. -? `Y ,.. •.. ,. ,::! .. . .?`: ;:•:''•: • , ,:;;; + • 36 :, ; o ~•.:•., . ,,, . e :':. ,••. . ,,:,,;;, ~., 1 .; , ., : ,.. . . ;. ,. •. ::' .; ' ., ~~ h ' ~ ' , ;. S 37 , ~ `~ •t .eo ++>a ~ .. ~ 4 ,. , ,;.;> ~ ~^': s12a.04 ,ti0 it ~r ' ;t~;.. ,~ C.~ ~ .~ i~ s4 t' ; P \ ' r \ ~ ` ~ n, 38 ~~ Lase ~~'' ~~ ~ c-aa ~ ~ -~ ~ ~ '$ ,~ ~ ~ ~ N r^ ~ ` 10' P.u E. q 10.SS' ~ z ~ ~' ~ / / ~~ ~, ~~ 5' P.U.E. " ~~ C~2~ ~ / /'~ / ~'' h 9~ ~ ' 40 ~ LC8 ~ ~ a ~ / 2a' P,a,e~ u,E. ?~~ a°f xa.oa' / / $7 0 1 ~ ~~ ~ 2 2.51' c~ ~ \ s 1'G' / . `~! i ~~ ' yy,~ .S 29'16 07 W ~~ \'°~ ~ 211.18' '` 2a' P.D,t~ U,E. (1aa2 s0. FT,)~ ~ \ ~ ~ '~'~ VOLUME ___ .RAGE _-- - ~~ ~~\' ~~ \ Y J, ,. ~~~ d r= r ~ ~ 10' UTILITY EASEMENT ~' ~ ~g `~ ~ J `~/OIUME _ PAGE N ss Jw ~ ~- ----- '48 X22°w 7 ~~ .oa , ~~ 25' PUBLIC UNDERGROUND UTILITY / ANa DRAINAGE EASEMENT ~ ~ vGLUME x474, PgCE 277 STATE OF TEXAS ~ COUNTY OF' McLENNAN I t, Galt3 Arnold, Rsgtst~red Professional Lond Surveyor No. 387p In th® State of Texas, do hereby certify that tMs plat is true and correot and woe prepared from an ootual survey of the land made .under my supervision an the ground, Regis#Qred° ProfesNanol Land' Surveyor •,r c STATE' OF 'TEXAS COEJNTY OF RAZ 6 OS Ma• nn ry A Ward, County 'Clerk ln• and far said County, do llereb cs rtlf aertlfioatea of autAen Y y that this t o t let f at on to et wa D her s file yr d for rec 9 ith its ord to rxt a fftce the 1906, in the. deed Rscords of Brazos County, Tsxas in Volume day of II ,Pogo WETNESS my hand and afflctal Beal, at my offloe In Bryan, Texas. I TI~I~I4I~I~I~~ TI IN 1 ? ' 47 GiF' Q ~ ~~ 1 V ~, {~y_11 .,..,.w.l.„_i. .. ;.;~;.~ '.•,•...r:•: •,..,.!: •,'•z!"r,; •L~ ,'`J;a i~'N:'r ~~~,Y~m',. .r tb,~, >,~Y ,,ir•,~~~~a i5 ~~.;+i,., ~. ~~`i •. Y, t a.. ~ , ':.k, '~4 / n'•;%^ ~; , a .J. f ,'~ ; .fr tii7'. :~~" .wsr. „) '; 1°~..:;;•,.,, ~., ..1'~' t,~p,~t ,'~,+~°".•:~;~:y, d .~ . r • m.. ~, x n ~ ~ ll . •S "M1r~~ . L• h 3 ,~„ ~,. h. +°~., O"`' ;':~,+ ~ ~~i'.. ?>h'aRLr;~,~,9''.i.`.•~~~,•:•;,,~V•+}~,a,;,~,;,•,pg•:• is ~„ ';, ';C To .,, ~. ,.. , f~, ~!~ .., 's~ '.~ ..n •.; :'f r,i ,:. ,, tl .4 ~S•~a'a •a~;.(: `.,... ~y~, " .~ :'. {{ '•, ' r~'• .;~: ;;~ '+,•.•., , Ir ;fig' Q •r, ;•. . N "^'~ ,':~,,; ' „} .` , 1 ~,. i,~; ' ;: .~ ~~~ P u , , .:: • N ;,, 0 ,~ ~~...r..,. '.'~p t ,,. ,. i ..; •. I,., :). i i'~: . ,•.,•:, ;. "f . ~, Y, 1 i~ N >'1 ~~ <, ..: ' ;~. `~, ,;.. • 'S • :. ~ ,..; , ;; ...., ....., ~ ,,..,: a , • • .:~ ,. azeif~~nzyxz y~ ~~r v n 1 ~-~~-~ 1 ` ~ 3~' t `°~ .~ , ` ~~ g~ ~ ~ iT- ~ ~ ~ z4 t a~ 1 v~ ,, 4 ~ ~ ~ ` ~: ,, ~ ` ~ ~ 1 ~ ~ ~ ~~ , Y {~} rl'~ $ ~ ::r; ~~ I ~, Q, ~/ ~' .A ";, \ ,Q~~ J ~' ~~ From: Kent Laza To: SHOMEYER Date: 6/13/97 2:19pm Subject: Pebble Creek ph 6 Jed Walker .called me Friday asking what they could do so we would file final plat for PC 6 without the drainage report being done. He .says they haven't gotten the necessary data from FEMA to perform the computer runs. He proposed a letter of guarantee for the engineering fees, but I told him that would not get the drainage system built if we find one is necessary. He understands but didn't have a good response.. His is going to look at what Pebble Creek's possible participation in a regional detention .facility might be. 'Since you and he have talked about this somewhat, L suggest you call him early next week to see whether there is some room for compromise. If you are not comfortable with allowing the plat to be filed. without the report, work out some agreement that will protect us. Thanks. CC: Pkaspar, NRUIZ, SVOLK Cit ?of Colle a Station PO Box 9960, Collc c Station, Te~:as 77842 - 1 crnr car ~~u:.GUC. ~ -h< <~~ 1 FAX t~ - - To: Phone: Fax phone: CC: Date: ~j/ ~a/97 Number of pages indudiag cover sheet: From• Phonc: (409)764-3570 Fax phone: (409) 764-3496 .--, __ rte/ _____~.. f""1 oe.,t~. eC6P n Ptraerrnn~mest i- b I Perk i 1 .-- ~~.+ ,~"_ ._--- --~ --.-""'_ 10 Ut Y Eo °nt B/pCIC 2p6e1 Acre .~ ••„~ ~ '~. ~'~. ~~ • . ~~ ~• ~\ -~\ ,-.. _ ~.., .., ~ ~~~ ~~~~ .,~, ~. ,. \ d = 94°49'52" -~ \\ \ R ' 465.00' ~ \ \ T = 505.96' L = 769.63' . ~ ~ \._ _ _ _ ___ __ I S 47%0'45" E - 20.5 48°Ca0'31 " E - 23: D = 94°49'52" R =535.00' T = 582.13' L ~ 885.49' ~\ \~ . ~\'- ~~'~ e~~ \.\~_ Pabble~ Graak Phaaa 5C1 Block X25 I Lot 19 t 4ot 20 1 ___,1.~~ C__ --- - i _~~, 65 ~.~- 1 1 I I ~° ,~ ~ 1 ~~ ~~ ~~` a~ ~'~ ~~ 4" ~'~' 3~ ~ a 1 ~I i§ of Iti'. v 1 Id a i~' r zj ~ i 1-.. 1 3~ 1 ~ ~ 1 _\\ . , ~\ !\~ ~o ~ ~~s~• ~ ~O~-, ~ ~F ti ~~ ~\~ S~~ ~~y+. O~ ~~ ~~~~ ~ `? ~~ ~~ .~ ~, r- I ~~1 ~ i ~aa ' I ~ °~~ m ~N ~, ~ ~ I ~ ~ ~' m' •~ o I,I > ~ y t i, I ~I 3 c~ r- ~ ~ ~ 1 ~ c0~ N I !, 11.1 ~ ~ 0 I ~ ~ ~ ~ ~ ~ M a 1 v ZI I ~I c j ~ ^"~w\ I .~ ~_' ~ ~ ~~ ~ I~ i ~ ~ ~ i!.~ ~` 0 ~ ~ 25~ ~~ ~ W I~ i .~ ~~~~ ~ jm ~, : g o I ~ J p= 38° 50~ 36"- ~ R = 495.00 ~~ I I T = 174.53 L = 335.58 ~ I ~ ~~ / I .f __ ! f •. ,. ~. .,; . 8 ,, ~ y F .a '. . .06/12/97 11:57 ^0409 764 349.6 DEVELOPMENT SVCS ~ ool :kW*:k:k:k:k%k:k~::k:k %kskX:*%k%k%k:k:k*X:~S:k~%K ~x:~ ACTIVITY .REPORT ~~:x: :K:k:k~:ski:h%k:k*:k:k~~~:~%k%k~%k:k:&%k:kN~*:k TRANS14fISSION OK TX/RX N0. 0625 CONNECTION TEL 18177762924pp161 CONNECTION ID START TIME 06112 11:55 USAGE TI14IE O1' 48 PAGES 3 RESULT OK ~E~E~ ~~- ~+~5~" ~~ ~~A a NaGC: ~p'~oSALS !'1~1~5-TE~ ~-i-t~t2r~,wr~`~Z '!'~Af~'L1GE/~t'7~(-T' t~LAtiI l2EG r o~~L~.. CT~~ i oN ~-s~c. ~ ~ ~ . Y ~' r-~ r~~~E~ C;o~ vEY~~[ c.c ~ azz `ice' /Ot~ - :,~ Ec~E,~rr to N VI F-HF W W W s = _ -- Co.~-.31 rr.~-r ~ av o ~- rr~/ sA Yf N O 4 O u1 O O ~ a v Z, J f-J'~ j T-/Gtr T~I~S~ / O ~N i % / R~T~ ~~(-k ~ S-]'1a~~' ~%ZOv ITJ C~ rrvr eHrn ~ ~ ~ f,4-~ ~ 1Yl ~-rc..~ ~'t L ~G Zc:~ roc i~.t T- r ~ T~ c~ ~/ ~C.rr ~-1 ,,~ i ,Q ~l~2T1 c, S G4tis ~ ~i~~ln.ir[~~ , ~' j t~t~ ~ G 2c~'_/''r E'tiri ~t-~c-~ L~ O c..-r u ~ E ~~ ~~r d ~ S i i3 a L ~ ~ ,r S !'7 ~ _~ b ~ ~~tc+-a ~~2-Y ~r7~-?- K.-~ G.4~~ l v j~~ ~c.~ IVnti~1 G l n /~ ~K-~(L~/ n! G ~~C`St6n1 t-kic.~~ ~4+~[ST~'c.~~oi.l ~ /~' ~/-'~'~ i20~Er''~E/..c i S. / ~= J~L~SiS DF' ~i~Yr~E~ C,JiLC. ~ /f~L~ ~ESc~L I ~'~!G ~ S ~ t-~v4Z GE CJ C / ~f~ C..A~I~t'~ USE ("C , ~ VC~I.c,.E~ ~l~[~ f'AG JUN, 12 '97,0~~15 WALLACE WACO TX a ~ .The ~. Wallcc® ,:Group, Inc. Enpin~a r ArChMecla. Plcnna~a s Stav~yoa nArE: - j.~~ ~ P.1 TEYEFA.~C COVFR SJYE~T i ~~ ~~ I E STAT ~N COLLEG P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 .Tel: 409.764 3500 September 9, 1997 Pebble Creek Development Company Atbn: Davis Young, V.P. 4500_Pebble Creek Parkway College Statioq Texas 77845 Dear Mr. Young: Our records indicate that the letter of credit issued for Pebble Creek Phase VI will expire on October 1,1997. This letter of credit was issued to cover the design and construction of ~a stormy water detention basin. We are requesting that you extend. this letter of credit to February 1, 1997. A drainage report and construction plans for the. detention facility must be, submitted, reviewed and approved during thisextension period.. This will be the only extension given due to the timeframe in which the detention facility must be installed: Please send us the appropriate paperwork showing the extension of the letter of credit as soon as possible. If you have any questions,' please contact me at 409-764-3570. Sincerely, W. Paul Kaspar Graduate Engineer xc: Veronica. Morgan, Assistant City Engineer I,~Shirley Vollc, Development Coordinator Steve Homeyer, Assistarn to the City Engineer Home of Texas A&M .University