HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 3: Public hearing to consider a site .plan for a parking lot and future
commercial building to be located at 600 Tarrow, lots 1, 2, 23 and 24, block 4 of the Prairie View
Heights Subdivision in a C-N Neighborhood Commercial zoning district. The C-N zoning is
ncil for lots 23 and 24. 96-817
in a royal b the Ci Cou ( )
pend g pp y h'
Senior Planner McCully recommended that this agenda item be tabled based on the outcome of the
rezoning case for the property.
Chairman Hawthorne opened the public hearing. Seeing no one present to speak in favor of or in
opposition to the item, he closed the public hearing.
Commissioner Gribou moved to table the site plan for a parking lot and commercial building to be
located at 600 Tarrow Street. Commissioner Lightfoot seconded the motion which passed, (6 - 0 - 1);
Chairman Hawthorne abstained.
AGENDA ITEM NO. 4: Public hearing to consider a proposed Ryder truck franchise. to be
located on lot 1, black B of the Shenandoah Subdivision Phase One on the southwest corner of
the Southern Plantation Drive and State Highway 6 Frontage Road intersection in a C-N zoning
district. (96-815)
This item was withdrawn by the applicant prior to the meeting.
AGENDA ITEM NO. 5: Consideration of a final plat of the Shenandoah Phase Five
subdivision totaling 9.7 acres and divided into 43 R-1 single family residential lots. (96-227)
Graduate. Civil Engineer Homeyer presented the staff report and recommended approval of the final plat
as presented.
Commissioner Lightfoot moved to approve the final plat for the Shenandoah Phase Five Subdivision as
presented. Commissioner Gribou seconded the motion which passed unopposed (7 - 0).
AGENDA ITEM NO. 6: Consideration of a final plat of the Pebble Creek Phase Sig
subdivision totaling 45.33 acres divided into 104 R-1 single family residential lots. (96-228)
Graduate Civil Engineer Homeyer. presented the staff report and recommended approval of the final plat
with the Presubmission Conference comments and the resolution of the drainage system.
Commissioner Gribou moved to approve the final plat for the Pebble Creek Phase Six Subdivision with
staff recommendations. Commissioner Massey seconded the motion which passed unopposed (7 - 0).
AGENDA ITEM NO. 7: ,Public hearing to consider an amendment to Sections 2 and 7 of
Zoning Ordinance #1638 defining manufactured housing and allowing it as a permitted use in R-
7, A-O and A-OX zoning districts. (96-804)
Senior Planner McCully stated that last month, the Commission discussed the recent legislative changes
relating to manufactured .homes and directed staff to prepare an ordinance amendment that will provide
for them within the city limits as required by law.
P & Z Minutes September S, 1996 Page 5 of 6
A
Staff Project Review Committee Meeting
August 29 , 1996
FINAL PLAT
Shenandoah Phase 5 (96-227)
Requirements
Underground service.
Developer installs conduit per city design and specs.. (2 - 2 inch sch 40 gray
PVC conduit installed 48 inches deep, caution tape place 18 inches
above conduit, and pull string in conduit.)
Developer responsible for 20% of city cost of installation of electrical system for
subdivision. (See attached form, fill out and return..)
Additional easements will be necessary for streetlights..
Will need an easement crossing between lots20 & 21 in.block 23.
Will need to-install service stub outs to all lots in block 22 & 26.