Loading...
HomeMy WebLinkAboutStaff Report,~ STAFF REPORT Case No.; 96-227 Request: Consideration of a Final Plat for Shenandoah Phase 5 Applicant: Owner: Edward Froehling Engineer: McClure Engineering ITEM SUMMARY AND RECOMMENDATION The subject property is located adjacent to the north boundary of Shenandoah Phase One, the northwest of Shenandoah Phase 3 and south of Shenandoah Phase 4 currently under construction. This subdivision consists of 43 R-1 -lots totaling 9,7 acres. Staff recommends a royal of his final plat. ZONING AND LAND USE Subject Tract: R 1 Single Family; vacant North: R-1 Single Family; Shenandoah Phases 3 and 4 East: R-1 Single: Family;. Shenandoah Phase 3 South: R-1 SingleFamly; Shenandoah Phase 1 West: A-O Agricultural-Open; vacant Proposed User' Single Family Residential COMPREHENSIVE PLAN Land Use Plan: This land use is consistent with the approved Land Use Plan. Thoroughfare Plan: The Thoroughfare: Plan designates Decatur Drive, dedicated with Shenandoah Phase: 4, as a minor arterial with Front Royal Drive and Stony Creek Lanebeing designated as local. streets. Development Policies: Not Applicable. Park Land Dedication: Park land dedication for this development will be based upon the following equation: 43 Lots x $225 per Lot = $9,675.00 This fee will be required in lieu of land dedication. ENGINEERING Water: This development will connect to existing 6 inch water lines at Hunter Creek and Decatur Drive and to an S inch water line at Stony Creek. This water distribution system is more than adequate to provide service to this development. Sewer: This development will sewer to a 6 inch line in both Hunter Creek and Decatur Drive. This proposed collection system is adequate to handle this development. Streets: This plat dedicates the right-of--.way for Front Royal Drive and Stony Creek Lane. These two streets will be constructed to residential standards. Drainage: The developer proposes to utilize an existing storm water detention pond that is being constructed as part of Shenandoah Phase 4. Storm water will be collected using. street inlets and conveyed to the pond in an underground system. Flood.Plain:. This property'is not located within the 100-year flood plain according to the. Flood Insurance Rate Maps for Brazos County. Oversize Request:• The applicant is not requesting oversize participation in conjunction with this plat. Proposed Public Improvements: The proposed public improvements associated with this plat. include the construction of Front Royal Drive and Stony Creek Lane in addition to the appropriate water, sewer and underground storm drainage facilities. Easement Dedications: There are several utility easement dedications as indicated on this plat. Sidewalks: As part of the platting process,. a sidewalk will be required on one side of Front Royale Drive and Stony Creek Lane.