HomeMy WebLinkAboutMinutesSTAFF PRC REPC)RT
University Park Section II, Block R
Case #96-224
Ordinance Requirements:.
Submit a drawing showing theproposed propertyline with the buildings and parking areas
superimposed.
Remove the "Approval of City. Council" signature block.
_ If the driveway between lots. 1 and 2 does not extend beyond the existing parking lot,
terminate the 30' shared access easement.
_ Verify that the 7.5' side setback requirement located on either side of the 30' shared
access easement is met.
Correct the zoning district designation on the application. (Note the current land use.)
Correct the floodplain acreage on the application.
Parkland dedication is not required with the replat if it was paid at the time of building
permit.
f~ he ` tate of ac t" sub "' d is ptable. b ' ~ rice '~i~ `Cam
` i i a ' pn r the g and% mg Co 's 'on mee mg.
Comments/Concerns:
Coordinate electrical service details. with Electrical Operations Coordinator Tony
Michalsky at (409). 764-3b60.
Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723..
/r
lJ f ( lam" ~ l
~ °~
STAFF PRC REPORT
University Park Section II, Block R
Case #96-224
,~ -~,
~-.~
~- ~ ,
Ordinance Requirements:
~~-~" ~ ub a rawi
T /
erimpo
Remove the "Approval of City Council" signature block. ~ `~'' ~ -'~ (,,~,~~s~~-~-~~-~~
the
IOtS 1
,.., that e . ' .side sett c r uirement on °ther s' e-t5f a 0' s ar~d
acc s e merit is
_~ Correct the zoning district designation on the. application. (Note the current land. use.)
Correct the floodplain acreage on the application.
~/ Parkland dedication is not .required with the replat if it was paid a/t the ,time of building
permit. ~ ~,,.;z.,~,~tiY2. ~~ C~ ~ ~ _ ~~'~t~~~/~,t~(.~.c~1~
he ` tate of ac t" sub d is ptable. b re '
`~,--~"'. ~ a , Pri r the g an rig Co °s ' n mee ing.
~'~" Comments/Concerns: ~
Coordinate electrical service details wrth Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
Coordinate telephone service details with G.T.E.. Representative Laverne Akin at (409)
821-4723.
Staff Project Review Committee Meeting
July 24, 1996
1=INAL (Replat) PLAT
Blk R University Park Sect. 2 (96-221.)
Requirements
Will need a 10 ft. easement across Block R Lot 2 to cover existing electrical services to
Block R Lot 1.