Loading...
HomeMy WebLinkAboutMinutesSTAFF PRC REPORT Parcel IV, Block B of Culpepper. Plaza Case #96-213 Ordinance Requirements: On the original plat, note the properties that are "not platted". (Note that the boundaries sewn are "ownership lines" and not legally platted lots.) _ On the original plat, reference the dates associated with the volume and page numbers of /the deed records. ~/ Submit a letter requesting a variance to the .Subdivision Regulations to not plat the .entire Parcel TV. This variance will be considered by the Planning and Zoning Commission with the final plat. '~, Remove the approval block for the City Council. 'Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) ® 821-4723. .:. „~ ,.., _. e ~~--° ; ,~~ ~ `= r ' ,,..,,rr .~:,m.~w....,~. ..~J °'b...a~u. 4 ~iy ° _,,, - r F J f ~, ~ _ Remove general~notes 5, 6 and 7 since they are not included as part of the re lat. ~ „~ .w. - ~~ ~ ` ~ ~ .,~ Comment~~Concerns: ~"`r ,~, %._ ~. ~..% /` ~~ .. ~3 ~ 1 I ~ _- r STAFF PRC REPORT ` ~' ~~ Block B of Culpepper Plaza Addition Case #96-213 Ordinance Requirements: _~ Revise the date in the title block. v Remove the City Council signature block. ~ Change the lot number designations. The lot numbers shown exist elsewhere within block B of the Culpepper Plaza Addition. L/'~~~~`~' Submit paid tax certificates on the subject property. (The certificates submitted are for the existing lots 1-6 in block B -not the subject property.) Ong lot~~;;'show the 100 year floodplain and cover with a drainage easement. Exte e opose 4' acce ease to to ver the e ' g share weep lots 2 3. ;rrct~tne propo 6. ue to tl ' ac ess easement of 6 imity f the Kv and Doi bet~n lets 4 ~/ allowed f~im.I~ ~~ ~~ ~thatL and access. 6 are considered a single building plot in terms of signage, parking Note the volume and. page numbers' of lots 3 and 4. Comments/Concerns: ,~ ~ ma electric service. ails with Michalskv at 764-3660. telephone service details and necessary in at (409 - 3. SUBMIT. THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED FINAL PLAT BY WEDNESDAY, FEBRUARY 26, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, MARCH 6, 1997 AT 7:00 P:M. IN THE CITY HALL COUNCIL CHAMBERS. ~ ¢., PRESUBMISSION CONFERENCE REPORT May 23, 1996 TO: Lawrence H. Allen 17.16 Briarcrest, Suite 200, Bryan, TX 77802 Don Garrett, Garrett Engineering 4444 .Carter Creek Parkway, Suite 108, Bryan, TX 77$02 FROM: Presubmission Conference SUBJECT: Final Plat - Culpeppe~~ Plaza Addition; proposed subdivision totaling 2.92 acres divided into C-1 zoned lots located along the west side of Kyle South between the Bentley House Hotel and the Culpepper Realty offices. (96-2:13) Jane Kee, City Plann Kent Laza, City Engin er Winnie Garner, P&Z Representative Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Tony Michalsky, Electrical Operations Coordinator Zaverne Akin,. G.T:E. Representative George McLean, CSLSD Representative A Presubmission Conference meeting was held Wednesday,:- May 22, 1996 to .discuss the above mentioned final plat. The following is, a list. of ordinance. requirements .identified by .the Presubmission.Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements.. Ordinance Requirements: _ On the original plat, note. the properties that are "not platted". (Note that the boundaries shown are "ownership lines" and not legally platted lots.) On the original plat,. reference the dates associated with the volume and page numbers of the deed records. Submit a letter requesting a variance to .the Subdivision Regulations to not plat the entire Parcel IV. This variance will be considered by the Planning and. Zoning Commission with the final plat. _ Remove the approval block for the City Council.. Remove .general notes 5, 6 and 7 since they are not included as part of the replat. _ Provide a 20' public utility easement between lots SR and 6R for electrical service.. w ' `~ PRC Report Culpepper Plaza .Case #96-213 Page 2 of 2 Comments/Concerns: Coordinate telephone. service details with G.T.E. Representative Laverne. Akin at (409) 821-4723. SUBMIT ONE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED F1NAL PLAT BY WEDNESDAY, MAY 29, 1996 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, JUNE 6, 1996. THE COMMISSION MEETING WILL BE HELD IN THE CITY .HALL COUNCIL ROOM LOCATED AT 1101. TEXAS AVENUE SOUTH. AGENDA ITEM N0.3: Consideration of a final resubdivision plat of lot 4 of the Culpepper Plaza Addition Subdivision. (96-213 City Engineer Laza presented the staff report and stated that. the subject property is located between Dominik Drive and Harvey Road on the west side of Kyle Avenue South. The purpose of this plat is to subdivide 10.02 acres into six C-1, General Commercial lots in order to rectify illegal subdivisions that have taken place since the .property .was originally platted in April of .1975. A Presubmission Conference was held on February 12, 1997 and several comments were addressed at that meeting. Staff recommended approval of the final plat with the condition that all Presubmission Conference comments are addressed prior to filing the plat for record. Commissioner Smith moved to approve a final resubdivision plat of lot 4 of the Culpepper Plaza Addition with the staff recommendations.' Commissioner Garner seconded the motion .which passed unopposed (7 - 0). AGENDA ITEM N0.4: Consideration of a master preliminary plat of the CSL of Texas, Inc. Addition located near the northeast corner of the .intersection of Sebesta Road and State Highway 6 Frontage Road. (97-305) City Planner Kee presented the staff report and. stated that the property in this master plat is currently zoned for C-1 Commercial and M-1 Planned Industrial development. This master preliminary plat is being presented. in anticipation of development of 3.5 acres (lot 2). This master plat incorporates what was aplatted-lot in the 'adjacent T.7. Addition and includes a large 35.8 acre lot for which there are presently. no development plans. Lot 1 is a small 1.1 acre lot. The master plat shows the future location of a new collector roadway that would .extend from. Emerald Parkway to Sebesta as part of lot 3. The idea for this roadway was developed as a solution to the cut-through traffic problems Emerald Forest has ffaced over the years since the Frontage. Road was converted to one-way. This will allow north- south .movement 'between Emerald Parkway. and Sebesta without traffic traveling through the neighborhood. This roadway will not be built until lot 3 is ready. for development. The developer of lot 2 will be asking the Council, through a development agreement, to delay the construction of any.. sewer infrastructure through lot 3 to lot 2. .Thee... proposed use on lot 2 does not have any significant sewer demand. Staff recommended approval of the plat.. with presubmission conference notes, with the condition that either a development agreement be approved by Council addressing the timing of sewer extension or the infrastructure be constructed with'. the first final plat and with the discretion to apply streetscape reserved until .site plan development. Commissioner Gribou moved to recommend approval of the master preliminary plat of the CSL of Texas, Inc.. Addition with staff recommendations. Commissioner Lightfoot seconded the motion which passed unopposed (7 - 0). AGENDA ITEM NO. S: Discussion of gated communities. City Planner Kee stated that the .purpose of this agenda item is to bring to the City Council's attention what appears to be a significant trend that could impact future development patterns in our community. The concept of gated communities was discussed a few months ago in the Sunday magazine that comes with The Eagle. At that same time, staff was discussing the possible gating of a street in a newly developing subdivision with a local developer. P & Z Minutes May 1, 1997 Page 4 of 6 ,. ~,.. PRESUBMISSION CONFERENCE REPORT February 14, 1997 TO: Don Garrett, Garrett Engineering 4444 Carter Creek Pkwy, Suite 108, Bryan, TX 77802 J. Lamar Haggard, Bellaire Capital Partnership, L.P. 3901 Bellaire Blvd., Houston, TX 77025 Lawrence H. Allen 1716 Briarcrest, Suite 200, Bryan, TX 77802 Paul Clarke, Clarke & Wyndham, Inc. 3608 East 29th Street, Bryan, TX 77802 Lawrence J. Haskins, Culpepper Realty Company 1700 Kyle Street, College Station, TX 77840 FROM: Presubmission Conference Jane Kee, City Planner Kent Laza, City Engineer Larry Lightfoot, P&Z Representative Others Attending Natalie Thomas, Planning Technician Tony Michalsky, Electrical Operations Coordinator Laverne Akin,'GTE Representative Don Fazzino, Lone Star Gas Representative David Durough, Lone Star Gas Representative SUBJECT: Final Plat -Culpepper Plaza Addition; proposed subdivision totaling 10.0 acres divided into six C-1 commercial lots located along the west side of Kyle South between Dominik Drive and State Highway 30. This final plat reflects the current ownership in this area. (97-213) A Presubmission Conference meeting was .held Wednesday, February 12, 1997 to discuss the above mentioned final plat. The following is a Iist of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Revise the date in the title block. Remove the City Council signature block. Change the lot number designations. The lot numbers shown exist elsewhere within block B of the Culpepper Plaza Addition. PRC Report Culpepper Plaza Case #96-213 Page 2 of 2 Ordinance Requirements (cont. Submit paid tax certificates on lots 3 and 4 Show the 100 year' floodplain that exists on-.lots 3 & 4 and cover with a .drainage easement. Add a general note that lot 6 will be allowed access to Kyle and not Dominik. Note .that. lots 3 and 4 are considered a single building plot in terms of signage, parking and access. _ Note the volume and page numbers of lots 3 and 4. Comments/Concerns: _ Coordinate electrical service details with. Electrical Operations Coordinator Tony Michalsky at (409) .764-3660. _ .Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) ..821-4723. Coordinate gas service details with Lone Star Gas Representative David Durough at (409) 776-0627. SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE REVISED FINAL PLAT BY WEDNESDAY, FEBRUARY 26, 1997 TO BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, MARCH.6, 1.997 AT 7:00 P.M. IN THE CITY HALL COUNCIL CHAMBERS AT ..1101 TEXAS AVENUE SOUTH, COLLEGE STATION, TEXAS.