Loading...
HomeMy WebLinkAboutStaff ReportSTAFF: REPORT Case No.: 96-209 Applicant: Lacour Investments ITEM Consideration of a Final Plat for a LaCour Subdivision -Phase I. ITEM SUMMARY AND STAFF REC011~IlVIFNDATION This final plat contains 9:533 acres and islocated in the Wolf Pen Creek District along.. the south side of SH 30 (Harvey Rd.). It is' approximately 1050 feet east of the Texas :Ave./SH 30 intersection, adjacentand east of the existing Taco Bell.. This plat includes a 4..339 acre lot along SH 30 which includes .562 acres of future -Kyle Street right-of- way and the 20° Wolfpen Creek dedication area, a 5.1 acre area of Wolf Pen Creek Dedication, and' .094 acres of Kyle Street right-of-way adjacent to the Reserve Tract. Wolf Pen Creek runs through the property and by ordinance, property dedication is ..required if the developer chooses not to develop `the park area at this time. This dedication is being made in two parts with this plat. The first being the dedication as shown of the S.1 acres, and the second will comeby separate instrument from the buyer of Lot 1. Due to prior arrangements between the buyer and seller, the applicant. has requested that we obtain the 20' minimum reserve area. from the owner of Lot 1 'with the. site development of that lot. During the CIP Advisory Committee process the extension of Kyle south through this .property was discussed and recommended. Staff would recommend this extension as '.well. Since the Kyle extension is not on the City ° s thoroughfare plan, staff has worked on a development agreement with. Lacour thataccommodates the City's need for the ,Kyle extension. - The development agreement will go to Council for approval at their March 14, 1996 meeting. Details of that meeting will be available at the Planning & Zoning Commission meeting. Staff recommends approval of the final plat with the Presubmission Conference comments. COUNCIL POLICY ENDS. STATEMENTS. -The following Ends Statements that are in bold are relevant to this particular case. Transportation/Mobility Parks & Recreation Health. & Public Safety Education/Information Quality Service Cultural Arts Employment/Prosperity Civic Pride COMPREHENSIVE PLAN -The following are Goals and Objectives from the City's adopted Comprehensive Plan. Applicable ones are in bold. Complies with Future Land Use Plan Map?: YES Development Goals and Objectives: LAND USE Protection of residential uses: Encourage. use of vacant land w/services: Avoid strip. commercials Size and. depth of property meets policies regarding strip commercial and Kyle extension will provide frontage: on two streets TRANSPORTATION Provide major arterials to prevent congestion: Adequate pedestrian/bike movement: Ensure safety and ease of maintenance: Location of streets based on function: Includes a portion of the Kyle ROW dedication and reserves a portion for future dedication. Driveway access: Easement will be provided for Taco Bell so that driveway access can. be relocated ECONOMIC DEVELOPMENT Compatible with environment: Encourage retirees: .Encourage ourism: PARKS AND RECREATION Link parks by pathways and natural features: This property has WPC dedication area Combine parks with schools: HOUSING Maintain integrity of existing supply: Encourage. diversified housing: COMMUNITY APPEARANCE Promote good site design: Good appearance, minimize drainage impacts, and increase pedestrian safety Prevent and eliminate unsightly conditions: ENGINEERING COMI~~NTS AND IlVIPACT STUDIES - Water -Water is available to Lot 1 through an existing line in SH 30. Water is not currently available to the reserve tract.- The applicant has submitted impact studies with this final plat to address the reserve tract. In that impact study there is not enough detail to assess any sizing requirements for future waterlines to serve the reserve tract, nor to assess any. oversize participation. Sewer -Available and adequate to Lot 1. Streets -Access to Lot 1 is to SH 30 which. is adequate to handle anticipated traffic. Although. the Kyle right-of--way is-not being dedicated with this plat, the buyer of Lot 1 has expressed a .desire to construct Kyle street within this right- of-way and essentially use it as a part of his site development until the right-of- way is purchased by the City, per the development agreement. This wih avoid any disturbance of this part of their access when Kyle street is .ultimately constructed, as this section will already meet our street standards. Drainage -Drainage is currently overland toward the creek. Improvements made on Lot 1 will .have to comply with the Drainage Ordinance: and the Wolf Pen Creek portion of the zoning ordinance at the time of site development. X ,, Flood Plain - Floodplain is located on Lot 1. Sidewalks -Sidewalks. will be required along SH 30 and along the Kyle extension at the. ime of platting or site development. Parkland Dedication.`- Not applicable to commercial.. SiJ13DIVISION ORDINANCE COMPLIANCE Oversize Request -Unknown Easement. Dedications - As shown on the plat. ZONING ORDINANCE COMPLIANCE Proposed Use -Commercial development. NOTIFICATION: Legal Notice Publication(s): Advertised Commission Hearing Date(s): 3-21-96 Advertised Council Hearing Dates: 4-11-96 Number of Notices Mailed to Property Owners Within 200' N/A 3