HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 4: Public hearing to consider a final (replat) plat of the Renton
3 51 re lot located along the northwest side of Lincoln near the Munson
Subdw~s~on, a ac
intersection. Applicant is the owner, J. V. Renton. (96-205)
Graduate Civil Engineer Homeyer presented the staff report and stated that the proposed development
is contingent .upon the filing of a development agreement between the developer and the City. This
development agreement provides for the relocation of a previous zoning condition for a fence six feet in
height to buffer residential and commercial zonings. The .City Council approved the rezoning of this
property with the condition that a .development agreement be filed. The approval of this final plat is
contingent upon the zoning and therefore also contingent on the development agreement. 'This plat
complies with all subdivision requirements and therefore, staff recommended approval of the final
replat with the comments identified at the Presubmission Conference and the filing for record of a
development agreement approved by the City Council. There were several .inquiries concerning the
request including several calls received in opposition to the :final plat.
Chairman Hawthorne opened the public hearing.
Stephen Miller of 906 Munson. informed the Commission that he is not in opposition to the request;
however, he is opposed to the fact that the neighbors were not notified of the meeting. The only
notification received was a sign that was installed the Tuesday before the meeting. When the City is
dealing with an issue that affects people's health, happiness and daily .life, they should be given the
necessary information.
Deidre Cannon of 903 Munson requested that no building be allowed to take place in the. general area
until the neighborhood traffic issues are resolved. Currently, residents along Munson are unable to pull
out of their driveways due to the 7,000 to 8,000 vehicles that travel along Munson daily. She stated
that she is not opposed to the proposed development; however, development. in the area must slow
down to allow the City and the neighborhood time to address the existing traffic problems.
Oran Nicks of 901 Munson approached the Commission and .suggested that the notification rules be
changed to notify the neighbors in such instances. A sign placed on the property that people, may not
see is inadequate.
Chairman Hawthorne closed the public. hearing.
Commissioner Garner moved to approve the final plat of the Renton Subdivision with staff
recommendations. Commissioner Parker seconded the motion which passed unopposed (5 - 0).
AGENDA ITEM NOS. 5 & 6: Public hearing to consider a conditional .use permit for
additions and renovations at the South Knoll Elementary School,- including a new building
totaling 15,028 square feet. Applicant is Total Program management for C.S.I.S.D. (96-708) A
public hearing to consider a conditional use permit for additions .and renovations at the College
Hills Elementary School, including a new building totaling 15,198 square feet. (96-709)
Staff Planner Dunn presented the staff report for both conditional use permit requests. He stated that
the College Station Independent School District. (CSISD) is requesting conditional use permits to build
classroom additions, running tracks, and other capital improvements to College Hills Elementary and
South Knoll Elementary schools.
P & Z Minutes August 1, 1996 Page 4 of 10
STAFF PRC REPORT
Henton Subdivision
Case #96-205
.Ordinance Requirements:
_ Remove the approval block of the City Council.
_ Reflect the current date in the title block. (Shown as December 1995.)
_ Note the volume and page number of the access easement to the. east that will coruiect to
the existing Two Lincoln Place`driveway.
_ Note the proposed fence location as part of the development agreement.
_ Provide deed restrictions that establish a home owner's association or responsible. party to
maintain the private common areas and detention facility. (CLARIFICATION -Staff was
under the impression that the owner .wanted the proposed 24' private access easement to
be a public alley'so that it will be maintained by the City.)
Parkland fee is required in lieu of a land dedication totaling $3,150. (Proposed 1 ~ lots x
$225 ° $3,150)
Designate the proposed utility easements as "public".
Reference. a point of beginning and basis of bearing for the survey.
Comments/Concerns:.
_ G.T.E. needs to discuss telephone service to each lot. There are additional easements
required .and all off-site easement must be shown.. Coordinate telephone service details
with G.T.E. Representative Laverne Akin at (409) 821-4723.
~~ k I ~ J
~ / '~"
n0l
,;
,;
nn'.
~vV
.~
Case #96-205
ice Reauirements'.~ ..--- ~G:C.U`~ .
~~-
Remove the approval block of the City Council. U
~-~ .
Reflect the current date in the title block. (Shown as December 1995.)
Note the volume and page number of the access easement to the east that will connect to
the existing Two Lincoln Place driveway.
~ ~~~.. ~ ~
Not~he proposed fence locationathe development agreement.
Provide deed restrictions that establish a home. owner's association or responsible party to
maintain the private common areas .and detention facility. (CLARIFICATION -Staff was
under the impression that the owner wanted the proposed 24' rivat access ement to
be a public alley so that it will be maintained by the City.) ~,~~ ~ G~~
Parkland fee is required in lieu of a land dedication totaling $3,150. (Proposed 14 lots x
$225 = $3,150)
Designate the proposed utility easements as "public".
~' Reference a point of beginning and basis of bearing for the survey.
Comments/Concerns:
G.T.E. needs to discuss telephone service to each lot. There are additional easements
required and all off-site .easement must be shown. Coordinate telephone service details
with G.T.E. Representative Laverne Akin at (409) 821-4723.
ate- ~/,o
~Z
STAFF ~'R(~2EPORT
Subdivision
~l i~
Staff Project Review Committee Meeting
July 3, 1996 f
REPEAT ,,
Henton Subdivision (96-205)
,~ .
Requirements ,i
Underground service
Developer instal s conduit per city design and.specs.. (2 - 2 inch sch 40 gray
PVC conduit installed 48 inches deep, caution tape place 18 inches
above conduit, and pull string in conduit.)
Developer: responsible for 20% of city cost of installation of electrical system for
subdivision.. ('See attached form, fil} out and return.)
Additional easement for streetlights and electrical layout maybe necessary.
L_
~ ~ -~
PRESUBMISSION CONFERENCE REPORT
July 3, 1996
TO: J. V. Renton
HC 30, Box.6M, Brownwood, TX 76801
David Scarmardo
P. O. Box 4508, Bryan, TX 77805
Don Garrett,. Garrett Engineering
.4444 Carter Creek Pkwy, Suite 108, Bryan, TX 77802
FROM: Presubmission Confere
Jane Kee, City Pla
Kent. Laza, City Engi r
Kyle Hawthorne, P&Z Cha'rman
James Massey, P&2 Representative
Others Attending
Natalie Thomas, Planning Technics
Shirley Volk, Development Coordina or
.Tony Michalsky„Electrical Operations Coordinator
Laverne Akin, GTE Representative
Don Fazzino Lone Star Gas Representative
SUBJECT: Final Plat -Renton Subdivision; proposed subdivision of lot 3 totaling 3. ~ 1 acres
divided into 14 single family lots located along the. northwest side of the
intersection of Lincoln Avenue and Munson Street. (96-205)
A Presubmission Conference meeting was held Wednesday, July 3, 1996 to discuss the above
mentioned final. plat. The following is a list of ordinance :requirements identified by the
Presubmission Conference.. This list does not relieve the applicant,of total compliance with
all current ordinance requirements.
Ordinance Reuuirements:
A sidewalk is required along the frontage of Lincoln Avenue:
Remove the approval block of the City Council.
Reflect the current date in the title block. (Shown as December 1995.)
_ Note the volume .and page number of the access easement to the east that will connect to
the existing Two Lincoln Place driveway.
Note that the proposed fence location is per the development agreement.
_ A Parkland fee is required in lieu of a land dedication totaling $3,150. (Proposed "14 lots x
$225 = $3,150)
~.. $
PRC Report
Henton Subdivision
Case #96-205
Page 2 of 2
Ordinance Requirements (cont..):
_ Provide. deed restrictions that establish a home owner's association or responsible .party to
maintain the private common areas and detention facility. {Clarify the 24' access easement
as either private or a public alley.. The. entire easement could be designated as a public
access and utility easement to allow utilities to be located within the same easement.)
Designate the proposed utility easements as "public".
Reference a point of beginning. and basis of bearing for the survey
Comments/Concerns:
Coordinate electrical service details with Electrical Operations Coordinator Tony
- Michalsky at (409) 764-3660.. Additional easements fore street lights and. electrical layout
maybe required.
G.T.E. needs to discuss telephone service to each lot. Thereare additional easements
required and all off-site easement must be shown. Coordinate telephone service details
with G.T.E. Representative Laverne Akin at (409) 821-4723.
SUBMIT THE MYLAR ORIGINAL AND 10 COPIES OF THE. REVISED FINAL PLAT BY
WEDNESDAY, JULY 24, 1996 TO BE INCLUDED IN THE PLANNING AND ZONING
COMMISSION PACKETSFOR THE MEETING OF THURSDAY, AUGUST 1, 1996 ~T 7:00
P.M. IN THE CITY. HALL: COUNCIL ROOM. AT 1101 TEXAS AVENUE SOUTH,
COLLEGE STATION, TEXAS.