HomeMy WebLinkAboutMinutesd .. ~
Draft P&Z .Minutes
,~'une 20, 1996.
Page 1 of 3
AGENDA ITEM'NO.4: Public hearing to consider a rezoning request for the Melrose
Subdivision totaling 52.3 acres located along the south side of Luther Street approximately 1550'
east: of the F.M. 2818 intersection. from R 1 Single Family Residential, R:5 Medium Density
Apartments, R 7 Mobile Homes and M-2 Heavy Industrial to R-5 Medium Density Apartments.
(96-108)
City Planner Kee presented the staff report for both the rezoning request and the preliminary plat of the
Melrose Subdivision. The request R-5 zoning is in compliance with the current Land Use Plan and is
compatible with existing and future uses in the immediate area. The current Land Use Plan shows high
density residential, which is not expected to change with the new land use .plan that is being prepared by
the consultants.. Under the existing zoning, the.. area could build as many as .708 dwelling units and a fair
sized heavy .industrial use. The requested .zoning would eliminate the heavy. industrial .and allow up to
1304 dwelling units underthe maximum density. The addition of the proposed 462 units will impact the
azea sewer line and street systems. Any rezoning in the azea will therefore need to be accompanied by
conditions `to mitigate those :negative impacts. `:Luther and Jones-Butler are substandard and will be
heavily impacted because they aze to serve as primary routes to and from the proposed multi-family
complex. Due to thin desire on the part of the .applicant to orient traffic to these two streets, .staff
recommends that the zoning,be approvedonly with assurance that Luther and Jones-Butler be.:improved
for the portions. of the roads that immediately abut the subject 'property. Southwest Parkway is built to
major arterial standards but it dead-ends into the south side of the subject :property. The Thoroughfare
Plan would require its extension through- the property to .Luther. The applicant wishes to end
Southwest Parkway for. purposes of security and continuity. On the Thoroughfare Plan, the Southwest
Parkway extension north to Luther is intended to provide additional, through movement, as well as o
provide access to better distribute traffic in the area. The additional through movement is not as critical
since this proposal is for one multi-family development. Traffic'distribution is more critical. This can be
accomplished through proper ite design whereby this project would access Southwest Parkway where
it will end on the south side and would. access Luther on the north side. This will distribute some traffic
to the south: and some traffic to the north.. The applicant has offered an upgrade and additional 'right-of-
way dedication for Luther for a distance equal to he property, frontage. ;This upgrade should begin. at
Marion Pugh and extend to the west for `this distance.. Jones-butler should be improved .along the
property frontage within'the existing 80' right-of-way. The sewer system in the-area west of Wellborn
has been problematic for a number of years. The City `has planned for improvements to this area in the
next fiscal yeaz` This budget has not. yet been adopted by the Council. In order to support a
development of his magnitude, these improvements must be made prior to or in conjunction with
commencement of construction of the project. Approval of the requested. rezoning will almost double
the amount of dwelling units that may be built. With approval'.of this rezoning, it is imperative that the
Christine Lane sewer'line improvements be approved later this year by the City Council as part of the
next Capital Improvements budget. Staff recommended approval of the rezoning request with the
condition that before the R-5 zoning becomes effective, the property owners enter into a development
agreement to upgrade Luther and provide additional right-of--way where ..necessary, to upgrade Jones-
Butler to arterial standards along the entire extent of the property, and to make the necessary sewer
upgrades rather than the City reimbursement of all or part of the costs be negotiated as-part of the
development agreement, to end South~v~ garkway in a fashion acceptable to the City in terms of turn-
around 'needs, to ensure access to Southwest Parkway from the development and to limit the density to
the number. of dwelling units proposed.
~`
Draft P&Z Minutes
June 20, 1996.
Page. 2 of 3
City Planner Kee stated that the development agreement could also provide for .financial participation
for any of these improvements depending on the demand impact of the development as .evidenced in
impact studies that would be presented as a part of any oversize participation request.. Staff
recommended approval of the preliminary plat once the rezoning is effecting with the condition that the
utility easements and extensions issue to the. parcels that .are not a' part of .this development be
postponed until the final plat. Staff will continue to work with the applicant and the City's legal
department on this. issue. to be discussed further at the time of final plat. There would be no final plat
considered until the development agreement is completed.
Chairman Hawthorne opened the public hearing.
Representative of the applicant, Greg Strmiaska of Bury. & Pittman in Austin, informed the Commission
that there are a number of issues associated with the development. of the property. The developer is on
a night time schedule because .the target opening date is fall ,of next year with. construction beginning
September 1, 1996. The proposed 462 units may change slightly to 480 units .and he would .like to
work with staff on clarifying the number of units in -the development agreement. He stated that the
developer has agreed to take access to Southwest Parkway in lieu of extending it through the property
and providing improvements to Luther and Jones-Butler Road. Mr. Strmiaska stated that he is
concerned with. the extent at which '.the improvements to Luther and Jones-Butler Road will extend
beyond theu° property but that `..can be worked out with staff before the final plat. Sanitary sewer is an
issue. in 'this case and the developer would dike to continuing exploring the options .with staff including.
the .overall impact the development will have on the system. He stated than. the developer is not
opposed to looking at utility :extensions. but not .without something that would be a fair agreement for
both'parties. The developer should not be obligated to extend utilities to adjacent property owners. In
discussing this issue with several attorneys, there have :been several .cases that: say if you do not crate a
need to extend utilities, ,then you are not required to .extend utilities. IVIr. Strmiaska requested that this
issue also be delayed until the final plat to give everyone more time to discuss the alternatives.
Commissioner .Hall questioned. if the developer is willing to front the money for the sanitary sewer line
to later be reimbursed for the City's portion of the line. He also .questioned the number of people that
will be living at the proposed complex.
Mr. Strmiaska stated that they are willing to work with staff on the sanitary sewer line issue and if based
on the density of the ;development the improvements are needed, :the developer will take that into
consideration. There will be approximately.:' 1500 tenants of the complex with a combination of 2, 3 and
4 bedroom. units. All private bedrooms will have their own bathroom with the entire complex being
fully secured with a gated entrance:
,y
Draft P&Z Minutes
June 20, .1996
Page 3 of 3
Fain McDougal of 4150 Shadowbrook informed the Commission that he was .present on .behalf of
Raymond C. Goriski, the owner of a six acre tract downstream of the proposed development. The
owner is in favor. of the .development of the subject property. and thinks it will be an excellent addition to
the area. However, with the development of this area, the ultimate design of the water and sanitary
sewer services should be considered.. The needs of the surrounding property owners should be
addressed and studied as the. overall area develops. Mr. McDougal stated that there is a tremendous
amount of development potential in the area if the utility system is adequate.
Chairman Hawthorne closed the public hearing.
Commissioner Cmbou moved to recommend .approval of the .rezoning .request of 54.3 acres located on
the southwest. corner of Luther Street and Jones-Butler. Road from M-2 Heavy Industrial, R-1 Single
Family, R-5 Medium Density Apartments and R 7 Mobile Homes to R-5 Medium Density Apartments
with the .staff recommendations.:. Commissioner Lightfoot seconded the motion.
Chairman Hawthorne stated that'he agrees with Mr. McDougal in that any improvements the City does
of a capital. nature do not need to be done piecemeal as each property is developed. It is in the city's
interest and the developers that the area is ..master planned and not. put together like a puzzle.
The motion to recommend: approval passed unopposed (5 - 0).
c 4
I ~ ~.
Regular 7/11/96
Page 3
5i. Approved amendment to amended Section 1, G, 2-8 of the City of College
Station Policies and Procedures Handbook, regarding the disciplinary and
termination policy.
5j. Approved engineering contract. with McClure Engineering for the design of
Patricia Street. Total estimated expenditure, $127,125 funds available from the
1995. general obligation bond authorization.
The above items were approved by common consent.
,.~-~
~ ~- em too. ~ -- Public hearing to consider rezoning of 48.2 acres
located approximately 1'400 ft.'east of the Greens Prairie and Highway 6
intersection, north of Greens Prairie Road from A-O Agricultural Open to
R-1 Single Family. Applicant, Don Garrett for Jerry Windham and Frank
Thurmond. (96-107)
City Planner Jane Kee presented the item. She stated that this case has very
important implications for the future land use plan, some of the city's
development policies and for the way the. remainder of the south area of town
will develop. The rezoning shows densities typical of those found along the
East Bypass subdivisions and not the lower densities as shown on the. draft HOK
plan. The current land use plan supports this rezoning.
Staff and Planning and Zoning Commission recommended approval of the
request.
Mayor Mcllhaney opened the public hearing. No one spoke. She closed the
public hearing.
Councilman Birdwell moved adoption of Ordinance No. 2.189 in accordance with
staff recommendations. The motion was seconded by Councilman Fox which
carried unanimously, 5-0.
Councilmembers directed staff to begin proceedings to rezone the corner tract
on Highway fi and Greens Prairie Road to C-1.
Agenda Item No. -6(b1 -- Public hearing to consider rezoning of 54.3 acres
located on the southwest corner of Luther street and Jones Butler from M-2
Heavy Industrial, R-1 Single Family, R-5 Apartment Buildings/Medium
Density, and R-7 Mobile Homes to R-5 Apartment Buildings/Medium
Density. Applicant, Bill Mitchen for lntegroup, Inc. (96-108)
Regular 7/11/96
Page 4
City Planner Jane Kee described the subject tract and surrounding properties.
The request is to build approximately 660 dwelling units. The requested R-5 is
in compliance with the land use plan, compatible with existing and future
intended uses in the immediate area. The addition of the units will impact the
area sewer and street systems. Any rezoning will therefore need to be
accompanied by conditions to mitigate those negative impacts.
Staff recommended approval of the rezoning with the assurance that Luther and
Jones Butler streets be improved for the portions of the roads which immediately
abut the subject property.
The applicant wishes to amend the city°s thoroughfare plan and not extend.
Southwest Parkway through the property for purposes of security.
She noted that there are existing problems with the sanitary sewer system. Staff
will be communicating with the water and waste water consultants, Camp
Dresser and McKee about this development's impact to the sewer infrastructure.
Staff recommended. approval with the following conditions before R-5 zoning
becomes effective:
• the property owners enter into a development agreement to upgrade Luther
to collector standards from Marion Pugh west for a distance equal. to the
property frontage
• dedicate an additiona120 feet of right of way for Luther along their frontage,
• upgrade Jones Butler Holleman to Luther to minor arterial standards along
the entire extent of the property
• developer. make the necessary sewer upgrades if the city has determined the
impact of the development warrants
• development takes an access from Southwest Parkway into Luther to
distribute the traffic
• density be limited. to 660 dwelling units
Staff recommended approval of the preliminary plat. contingent upon the zoning
become effective and elements agreed upon within a development agreement
and with the provision of utility easements and extensions for service as per
utility extension policy and subdivision regulations.
Planning and Zoning Commission recommended approval of the rezoning and
the plat with staff recommendations with the exception that the applicant be
allowed to postpone the decision concerning the variance to the utilities and
easements until time of final platting. Staff will recommend that the developer
Regular 7/1.1/96
Page 5
follow the city's policy and ordinances in extending sewer in easements to
provide utilities to those lots. in out parcels.
To conclude, parkland Vvill be handled with the final plat. The proposal is for a
land dedication about 3-4 acres.
Staff clarified questions from the council related to the street extension and
utilities.
Mayor Mcllhaney opened the-public hearing.
Representative of the applicant, Greg Strmiaska of Bury & Pittman in Austin,
came forward to describe the project.
Don Jones of 3201 Forestwood, real estate broker representing the land owner
of the subject property, supported the project.
Mayor Mcllhaney closed the public hearing
Councilman Hickson. moved approval of Ordinance No. 2190 with staff
recommendation. The motion was seconded by Mayor Protein Kennady which
carried unanimously, 5-0.
Councilman Birdwell. pointed out the staff recommendation. is that this rezoning is
subject to the negotiation. of an appropriate development agreement.
Agenda Item No. 6(c) -- Public hearing for proposed community
development block grant and HOME FY 97 budgets and community
development priorities.
Community Development Administrator Jo Carroll explained that the proposed
budget and priorities of the Plan were developed in response to Council's
strategic issues, input received in neighborhood public hearings and local social
service providers. Total amount of proposed budget is $1,332,401.
Mayor Mcllhaney opened the public hearing.
The following individuals addressed the council on behalf of their respective
organizations to request funding from the city.
EricTodd, Administrator of Health Services for Brazos Valley Community Action
Agency
Don Sweeney, President of Brazos Valley Community Action Agency