HomeMy WebLinkAboutStaff Report.STAFF REPORT
Case No.: 96349 (Master Plan) and 96-149 (Rezoning)
Request:. Consideration of a Master Plan of 1.74 acres located. approximately 140Q' east
of the Green's Prairie and Highway 6 intersection, along the north side of Green's Prairie
Road, AND
Public hearing and consideration of rezoning 126 of the 174 acres from A-O Agricultural
Opento R-1 (10:1.9 ac.), to C-1 (16.9 ac.) and R-5 (7.2 ac_).
Applicant: Don Garrett for Jerry Windham and Frank Thurmond
ITEM SUMMARY AND .RECOMMENDATION
The plan is for approximately 262 single family lots on 150 acres, 172 multi-family units
on 7 acres, 17 acres. of commercial development, the extension of three collectors
through the area,. and the dedication of a sizable greenbelt and parkland area to the City.
A rezoning request was submitted with this master plan.
The consideration of this plan and the associated rezoning has important implications for
the future land use. plan, some of the City's development policies and for the way the
.remainder of this area of town will develop..
The existing land use plan shows single family an the north side of Green's Prairie Road
and multi-family as a buffer use, between the more intense commercial uses fronting on
the Bypass.. The draft land use .plan that is being prepared by H4K would change the
existing. plan. significantly,. to show rural density residential for the .entire triangle
bounded by Rock Prairie, Greens Prairie; and the Bypass, with regional retail at the three
main intersections. The proposal is in compliance with the existing land use plan but is
in conflict with the draft plan.
Current development policies would allow reclamation of floodplain areas for
development. HOK proposes that he City change this policy as well and prohibit
floodplain development in favor of the creation of greenbelts that would lessen. drainage
and flooding. problems and provide recreational amenities. The proposed. development
would be in compliance with the draft greenbelt policy.
R-1 portion. of .the request
A previous rezoning to R-1 single family was approved by Council on 7-11-96 for 48 of
the 174 acres. This. 48 acres fronts on Greens Prairie Road. The applicant is now
requesting an additional 101 acres of R-zoning, for a total of 150 acres of single family at
full build-out of the area.
This rezoning shows. densities typical of those found along the East Bypass subdivisions
but hat the. lower densities as shown on the draft HOK plan. According to some in the
City's development community, it is not. economically feasible to build large lot, more
rural densities in an area where there are floodplains that cannot be built upon,: and where
city sewer infrastructure must be extended. We therefore .need to evaluate the draft plan
in light of the additional costs associated with development in the City's most recently
annexed areas.
In considering the draft;(HE?K) plan. later this year, the City must decide whether to .adopt
policies that prohibit floodplain development to preserve open space and. policies that
require connection to infrastructure OR to require the very low densities proposed on the
draft plan. The action on this master plan and rezoning may set the stage for that
decision.
R-5 portion of the request
Much like the R-1 portion; the 7 acres of R-5 would also be in compliance with the
existing plan but. not with the draft HOK plan.. The draft plan shows almost exclusively.
rural residential with large box.. retail at intersections. Here again,. the implications for
such a change .are highlighted: by the submittal of this. rezoning case.
C-1 portion of the request
The l7 acres of C-l would be supported by the. current plan, but the draft HOK plan
shows rural residential for the tract.
Qther development policies..
This particular development will extend the sewer from Pebble Creek into this. area in
compliance with the City's utility extension policy. This policy has been in place for
quite some time and it ensures that all subdivisions will have adequate infrastructure. We
do not foresee. a change to this policy in the near future.
The applicant will be dedicating greenbelt along the creek. Recently, the City Staff as
well as HOK have discussed the problems associated with floodplain development. Such
problems. include inadequate drainage capacity as well as .increased flooding. The. areas
left over are quite often.. not aesthetically .pleasing -and are.. difficult to maintain..
Prohibiting or limiting the amount of .floodplain that can be reclaimed is one .solution,
and it is one of HOK's recommendations for change. The applicant is willing to dedicate
the "greenbelt" in an attempt to lessen the potential flooding in the larger area and to
create a recreational amenity for the neighborhood.
Recommendation
Staff feels that the higher single family: densities with the preservation of open space and
connection. to city sewer are ,preferable: to lower densities without these standards. Staff
will be looking in mare detail at this entire triangle as the City goes through the
comprehensive plan process. We will detail the impacts of the different densities on the
city's 'utility and thoroughfare systems and on existing and proposed development
policies:
The current land use plan supports this rezoning. Although the proposed draft plan
would.. not support it in terms of density, staff recommends' approval
ZONING AND LAND USE
Subject Tract: A-O AgriculturallOpen; vacant
North: A-O; vacant
East: A-p; vacant
South: C-1 General Commercial;. vacant
West; A-O; vacant
Proposed Use: Single family subdivision with commercial at Highway 6 and a
multi-family tract between the commercial and single family
Development. Policies: The current policies would. support the layout .and the
future proposed R-1, R-5. and. C-1 zonings.
The current policy allows building in the floodplains of the City. Many
developments .that have. creeks running through. them have. been allowed to
incorporate the flood-restricted areas into the lots, anal the City has even
permitted entire lots. to be completely in the. 100-year floodplain, as long. as the
finished floor elevations of the buildings are planned to be .above the floodplain
elevation. The recommended policy regarding floodplains for the new (HOK)
plan is to allow no building in the floodplain. at all, .and o convert these areas to
greenbelts for :drainage control and for public use. If such a policy is adopted by
Council, floodplain. property will no longer be reclaimed for use.
This master plan shows compliance with this new policy. to some extent. A
portion of the floodplain and some area. beyond will be dedicated to the City as
greenbelt and for neighborhood parkland. The Parks. Board has reviewed this and
recommends approval. Maintenance access. and street frontage for this area will
be shown. as the. plats. are prepared..
Parkland Dedication: Parkland was. discussed at a recent Parks Board meeting.
The dedication will be met through a 3.5 acre land dedication which will be tied
to an additional. floodplain/floodway (greenbelt) dedication. .There will be
adequate 'street frontage and access. to the park.. area for creation of a
neighborhood park that will be an asset to the area.
ENGINEERING
Water:.. This area has. adequate service. due to the size of water lines in the
immediate area, but Camp :Dresser and -McKee (CDM), the City's consultant for
the Water Distribution: Master Plan,. has not. completed their study of this area.
The engineer however, must design the water. distribution :system for ultimate
build out conditions and would therefore be required to comply with the approved
master plan.
Sewer: Data collected. as a result of the CDM. Wastewater Collection System
Master Plan indicates a 30 inch line being constructed from Greens Prairie north
toward this proposed development to serve the area bounded by Rock Prairie,
Crreens Prairie and State Highway 6. A 21 inch line will connect to the proposed
30 inch. line and. extend westward into .the. proposed development. This 21 inch
line will become an 18 inch line at a point yet to be determined and will extend
across State Highway 6 to connect with an existing sewer line within the
Shenandoah Subdivision. It will. be the responsibility of the engineer to
determine wherethis reduction shall occur using. ultimatebuild out as the criteria
for design. As with the water, CDM is continuing to analyze the City's sewer
needs and this development will be required to comply with the approved master
plan.
Streets:. The Thoroughfare Plan .indicates that an east-west collector will be
constructed from State Highway 6 to Rock Prairie Road with intersections at the
future extensions of Lakeway Drive and Pebble Creek Parkway. These two
existing streets. will be extended to the proposed Barron Road located on the east
side of State Highway b_
Drainage: The developer will be required to comply with the drainage ordinance
upon submission of the final plat for review:
Flood Plain:. There is a portion- of both the Lick Creek and Spring Creek 100
year. flood. plain located on this property. This. area has not been analyzed by
FEMA, but the existing map. panels conceptually. indicate. the- flood plain
boundaries. The developer will be required to model these tributaries in order to
accurately delineate the flood plain: on the preliminary plat.
NOTIFICATION:
Legal Notice Publication(s):. 7-3-96
Advertised Commission Hearing Date(s): 7-18-96
Advertised Council Hearingbates: 8-8-96
Number of Notices Mailed to Property. Owners Within 200': 6
Response Received: None as of date of staff report