Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT MEETING DATE: CASE NO.: APPLICANT: July 6, 1995 95-707 Glen Chervenka for Brethren Church PROPERTY OWNER: Same REQUEST: Conditional Use Permit to allow the construction of a new sanctuary at the existing Brethren Church. site located along Highway 6 to the north of Crystal Park Plaza LOCATION: PHYSICAL FEATURES: Area: Frontage: Depth: 2650 East Bypass Approximately 1.2 acres of developed area out of a total of 4.37 acres Approximately 320' along the Highway 6 frontage road Varies AREA ZONING AND LAND USE: Subject Tract: R-1 Single Family; developed. as existing Brethren Church North: R-l; vacant East: C-1 General Commercial; vacant across Bypass South: C-1; developed as Crystal Park Plaza West: R-L; vacant LAND USE. PLAN: Public & Institutional ENGINEERING: Water: Sewer: Streets: Flood Plain: Will be adequate with proposed extensions Will be adequate with proposed extensions Frontage is on the HWY 6 Bypass Floodplain is located on the property.. Only minor improvements are being constructed within the actual flooodplain. Tha applicant will locate the floodway on the plan. NOTIFICATION: Advertised Commission Hearing Date(s):. 7-6-95 Number of Notices Mailed to Property Owners Within 200': 7 Response Received: None as of date of staff report STAFF COMMENTS: Conditional use permits are granted by the Commission, subject to appropriate conditions and safeguards, when the Commission finds: A. That the proposed use meets all the minimum standards established in the Zoning Ordinance for this type of use; B. That the proposed use is in ,harmony with the purpose and intent of the zoning ordinance and the plan for physical development of the district as embodied in the comprehensive plan for the .development of the City; C. That the proposed use will not be detrimental to the health, welfare, and safety of the surrounding neighborhood or its occupants, nor be substantially or permanently injurious to neighboring property. (See sec. 14, Ordinance 1638) The proposed development is divided into two phases. Phase One will include the construction of a single. story sanctuary building totaling 3785 square feet which will seat up to 160 people. The. current membership is about 45 people. About half of .the parking spaces required, 24 spaces, will be provided: with Phase One. The rest of the parking required by ordinance, 29 spaces, will be covered via a perpetual easement obtained on the Crystal Park Plaza site. The ordinance allows parking to be counted on an adjoining property in this. manner. .Phase Two includes an additional 30 spaces which will not be needed unless the church wishes to abandon the private easement. However, with the easement, Phase One will meet all Zoning. Ordinance requirements. The P.R.C. reviewed this project on June 21 and .recommends approval with some minor changes relating to landscaping, parking lot, and drainage requirements. Staff recommends approval with PRC comments. This requests includes a sign that will be located along the Highway 6 frontage road in front of the parking .area. It will be 16' X 5.5' , which meets C-1 restrictions for a freestanding sign.