HomeMy WebLinkAboutMiscellaneousHESTER ENGINEERLNG COMPANY
7607 Eastmark Drive Suite 250
COLLEGE STATION, TEXAS 77840
PHONE (409) 693-1100. FAX (409) 696-2143
TO
~~~~~~ o~ ~aa~~>r~a~~a~
'the following items:
> WE P.RE SENDING YOU Attached ^ Under separate cover via
^ Shop drawings ^ .Prints ^ .Plans ^ Samples ^ Specifications
order ^
^ Copy of letter.. ^ Change..
DESCRIPTION
COPIES DATE NO
THESE ARE TRANSMITTED as checked
below: ~~
^ Approved as submitted. ^ Resubmit copies for approval
^ For approval ^ Approved as noted ^ Submit copies for distribution
^ For your use ^ Returned for corrections ^ Return corrected prints
> ^ As requested.
^ For review and comment ^
19 ^ PRINTS RETURNED AFTER LOAN TO US
^ FOR BIDS. DUE
REMARKS
~2CStl~-f' C~'e V~C~ L~ ~ S ~~ I
~`
s
.COPY TO SI(
g~~ 40 % Pre-Consumer Content • 10 % Post-Consumer Content
If enclosures are: not as noted, kindly
~.~ :
once.
~:
._ ~.~
-~ r ~ - ? l
e,--'''~-.~ >, STAFF NO ES ~ x Q ,
w College. Station Personal C U~~
~ i/
Case #95-503 e~ ~- ~ '~ '_`
~,~~~~
On .Friday, August 4, 1995,. Staff met to review the above mentioned parking lot plan. Due to A
several outstanding questions and missing. ordinance requirements from the site plan, a formal
Pro'ecfReview Conznaittee meeting was not held. Instead, staff put together the following/list of L~~t'~.~
J
items that must be crddiessed prior to scheduling a future Project Review Committee mee arg ~~ ~~
Discretionar~Items:
At this time, staff is approving/denying only phase one of the project.
Ordinance Requirements:
Show the ownership and current zoning of all abutting parcels.
The two proposed. turnaround areas. do not meet minimum requirements .for emergency
vehicles. Modify the two turnaround.. a eas or extend the future drive at this time around
the building. ~~, ( ~, ~~ .)
«~''~~ Curbing is required around the perimeter of all paved areas ' 'n ~
_ y i ~~~
~/ Will. there be any medical waste?
Section 290.44 of the TNRCC code states that "where dead ends are necessary as a stage
m the growth of a system, they shall be located and arranged with a view to ull:imately
connecting them to provide circulation". Along the rear of the property near the proposed
fire hydrant, is there a proposed connection to the waterline on Westchester ~ ~,~~,>~~ f~ ~~' ~~,
Tom..- e
_ The proposed entrance drive must be a designated fire lane..
~''~~ Provide flow calculations. for the fire' hydrant located on the northernmost side; of the
property - a loop system maybe required.
,;,r The fire department Siamese connection must be relocated to meet. the minimum distance
allowed between the Siamese connection and the closest fire hydrant.
~/' The proposed fire. hydrant in the rear of the ro erty may need to be relocated to provide
- the minimum 300° coverage area. ~~Q,, ~~
~/'' Submit an irrigation plan.
II! There are not enou h landscape points provided to meet the minimum requiremeYrts. The
g
proposed live oak trees: are 75 points and not 150 points.
C.S. Personal Cate
#95-503
Page 2 of 2
Ordinance Recruirements lcont.):
~.
~ ~ ~ ~ p ~~ ~
Move the phase line to the site plan a1so~ '~~ ~.<~~ ~ ~w' ~ ~' ~~~
Proposed parking is acceptable, only 15 spaces are required. it
Include the detention pond in phase one ~
Provide the minimum, maximum. and average water, landscaping and sanitary sewer
demands.
. zn.~the s'te
~/ .Show where the sidewalks are_locat~d...on.thE~-pr_a .ert~~_..~T det~ e_ ~ _...~_
plan but not the locaton.)`~~,~,' r~ ~.. ~ '~~'~`n',~
-____-
_~ Detention Pond -Took at the drainage easement and deterrrnne if it as ume an ume
ties to the outlet structure. ~ '
Comments/Concerns:
The .sidewalk along Rock Prairie Road has been damaged. Staff would like to see if this
developer would make repairs. It may. help the residents of this complex if they wish to
use the sidewalk.
Telephone service will be provided from Rock Prairie Road from an existing underground
- line along the north side of that road. Contact G.T,E. Representative La Verne .Akm at
(409) 821-47`23 to coordinate telephone service requirements.
Bated by" Natalie Thomas 8/22/95 3:14pm
CONFIRMED
From: Tony Michalsky
To: Natalie Thomas
Subject---------------------------------- ----------- ---------------------
==NOTE====------=====8/22/95==2:19pm==== =______==__ _=__=___ ---estion --
Here are my comments for tommorows PRC meeting. If you have any ~
let me know.
College Station Personal Care Facility
Requirements:
Underground service per city requirements.
Developer is responsible for 20% of the cost of electrical
service to property.:.
Developer installes all conduit per city design and requirements.
Developer pours concrete transformer and junction box pads per
specs.
Electric Service Request Form, (fill out and return form).
Temporary Blanket Easement for construction purposes, (fill out
and return form with property description and deed}, Upon
completion of project permanent meets and bounds descriptive
easement will be 'necessary to release blanket easement:
{20 ft. public utility easements).
Informati®n Needed
Service voltage needed..
Load Data
Main breaker size (outside disconnect required)..
Meter & Ct's will be located on transformer.
Willow Run Phase One
No comments.
College Station Buisness Center
No comments.
Parkway View Addition
Requirements
Underground service to all lots...
Developer installs all conduit per city design requirements.
City will design and provide plans for installation.
Service conduit also installed by builder of duplexes from
du--plex to transformer.
Electric Service Request Form (fill out and return).
Developer is responsible far 20% of the: cost of electrical sercive
to property.
Other Comments
Pole and anchor is located on lot 5, request was made about cost
to relocate'to island across alley.' Doesn't seem to bean
easement covering the island. Approxamate cost $2000 to
$2500-dollars.
Page: 1
SITE PI,P,T~' - CUlleye Station Pe3'SOnal C3L'e FaCillty; proposed
Personal care facility tb be lacatec~ at ].ri11 Dock
Prairie Road, .Tract A af. the Soakt.hwood ~folding.ti
Subdivision tataliasc~ 7.59 ~~cx~es. (95-503 )
Service will be pz~ovided frv~n I~vek Pz~air~ie Road. G3'E has an
existing ualc~ergz~vutad line along the north ~icle of Rock Pra:~rie.,
Please show exasLiny Yrvperty that fronts Rack Prairie (This is
needed t:o see wY~at easemea:at:s -have been recvrcled } .
Is the developer going to place r,.gridui.L fz~vt~~ Rock Pz~airiE ]Road to
the point; of terma.nat:ian (U-MAP,C}?
The St. cal.ett;eraL faz' GTE service is i.nc:arr,eCt. UnQ 4" conduit is
z equiz ecl . Which power pole i s t.}ae cvraclui L uvizay t.v be stubbed up?
In the ft~1.~.ua°e expaa~asioais - the developer/ctwa~Fei• vr,ta,1. k~e s~~:;pvrasible
fvs~ cvrrcitait,, wire, Labor back: t.o the b-MARE on L12e building ' i.n The
first phase.
The first phase has 30 beds - will each one YFave c~ pr'ivdE;e Brae?
Future phases - ho~a many bec?s, also will eacls have a px z.vate lia'ae?
T will discuss GTE's coazcs~~irs wiLka Mike Hester an August 14, 1995
(His f ir. st c3tay k~ark in tha of f ice)
Please vviaLacL Laverne Akin with C~TF, at 409J$21-4723.
Printed by Shirley Volk 8/22/95 10:05am
From: Jim Smith Confirm receipt
To: Shirley Volk
Subject: fwd: Personal Care Facility
===NOTE====______==°==8/22/95==9:56am==
I received your Faxon this location.
I do remember this one. I approved. the
container location as drawn.
However, I noticed that the screening
fence and container pad has been
rotated 90 degrees to the right. Who
approved this?
Let me know. Thanks!
Fwd=by:=Shirley=Volk=====°_°___=__=_°__
Fwd to: Jim Smith
Nobody•yetl.•It.goes.to.PRC•tomorrow.
Do you want it changed back? Just say
the word!
~„' ~~ j'~
W~ ~~ `~
,~,..~~,
°~
~„ ~ ~~
~~ E
~~-_
9~
Paae: 1
_~ted by Natalie Thomas 8/22/.95 3:14pm
CONFIRMED
From: Tony Michalsky
To: Natalie Thomas
Subject: -------------------
---------®----- 8 22 95==2:19pm========g===-===ou-have an estion --
==N®TE====__=_______= / ~
Here are my comments for tommorows PRC meetin If y Y ~
let me know.
College Station Personal Care Facility
Requirements
Underground service per city requirements.
Developer is responsible for 20% of the cost of electrical
service to property..
Developer installes all conduit per city design and requirements.
Developer pours concrete transformer and junction box pads per
specs.
Electric,Seryice Request Form, (fill out and return form).-
- Temporary Blanket Easement for construction purposes, (fill out
and. return form with-property description and deed), iTpon
completion of project permanent meets and bounds descriptive
easement will be necessary to release blanket. easement
{20 ft. public utility easements).
Information Needed
Service voltage needed.
'Load Data
Main breaker size (outside ;disconnect required).
'Meter & Ct's will be `located on transformer.
Wallow Run Phase One
No comments.
College Station Buisness Center
No comments.
Parkway View Addition
Requirements
Underground. service to al l.. lots.
Developer installs a7.1 conduit per city design requirement;s.
City will design and provide plans. for installation.
Service conduit also, installed by builder of duplexes from
du-plex to transformer.
Electric Service Request Form {fill out and xeturn).
Developer is responsible for 20% of-the cosy of electricalL sercive
to property.
Other Comments
Pole and anchor is located on lot 5, request was made about cost
to relocate to island across alley. Doesn't seem to be an
easement covering the island. Approxamate cost $2000 to
$2500 dollars.
Page: 1
NESTER ENGINEERING .COMPANY.
7607 Eastmark Drive Suite 250
COLLEGE STATION, TEXAS 77840
PHONE (409) 693.1100 FAX. (409) .696-2143
~~~~~a o~ ~aa~~~~o~~a~
WE ARE SENDING YOU ^ Attached ^ Under separate cover via
~ ^ Prints ^ Plans
^ Shop drawings ^
^ Copy of letter ^ Change order
DESCRIPTION
DATE NO.
COPIES ~,,. '
1 t ~~ ~~ ~
G
THESE ARE TRANSMITTED. as checked below: ^ Resubmit copies for approval
royal ^ Approved as submitted
^ For app ^ Submit copies for distribution
^ Approved as noted
^ For your use ^ Return corrected prints
~ ^ As requested. ^ -Returned for corrections
----
,,....-~ For review and comment ^
lg ^ PRINTS RETURNED AFTER LOAN TO US
^ FOR BIDS DUE
--.---
REMARKS ---------
---
i~ ~ J ~~~
`=~'- ~ ~ ~".. :LCD ~ ~- _---
N ~'~" ~'
n
COPY TO SI ED:
g~t~ 40 % Pre-Consumer Content • 10 % Post-Consumer Content sat once.
s e..~r~eures are not as noted, kindly
the following items:
^ Samples ^ Specifications
RESTER ENGINEERING COMPANY
.7607 Eastmark Drive Suite 250
COLLEGE STATION, TEXAS 77840
PHONE (409) 693.1100 FAX (409) 696.2143
T0~
the following items:
WE ARE SENDING YOU~J Attached ^ Under separate cover via ^ Specifications
^ Plans ^ Samples
^ Shop drawings ^ .Prints ---
^ Change order ^
^ Copy of letter ~-•--
DESCRIPTION ~-
DATE NO. `~ r,,~I~Cc~
COPIES' _ /°' ~i ~ ~ ~
(~.y ~~
~---
_.~--
~---
~----
copies for approval
THESE ARE TRANSMITTED as checked below: ^ Resubmit
^ Approved as submitted
^ For approval ^ Submit copies for' distribution
^ Approved as noted corrected prints
^ For your use, ^ Return
^ As requested ^ Returned for corrections -_
> '~] For review and... comment ^ 19___ ^ PRINTS .RETURNED AFTER LOIN TO US
^ FOR BIDS DUE __
-----
REMARKS
----
~ ~
a
~--
-_-----
~---
----
' tUU
COPY. TO SIGNS 41~-~-"' ~-
.kindly not once.
ra~C~ 40% Pre-Consumer Content •10% Post-Consumer Content .__ •e~ pre not as noted,
4GG°3 O[~ ~~pG~~C~~4~'p[~
[~G`~
RESTER ENGINEERING COMPANY
CIVIL ENGINEERING SERVICES
7607 EASTMARK DRIVE, SUITE 250
COLLEGE STATION, TEXAS 77840
(409)693-1100
August 28, 1995
Mr. Kyle Hawthorne, Chairman
Planning and Zoning Commission
City of College Station
1101 S. Texas Avenue
College Station, TX 77842
Re: COLLEGE STATION :PERSONAL CARE FACILITY
1151 ROCK PRAIRIE ROAD
PROJECT. REVIEW COMMITTEE (PRC) DISCRETIONARY ITEM APPEAL
Dear Mr. Hawthorne,
The owners of the Southwood Living. Center which is a
nursing home located at 1201 Rock Prairie Road are proposing to
construct an upscale retirement home adjacent to the Southwood
Living. Center. During a recent PRC meeting the staff required
that a sidewalk be constructed between the two facilities because
they felt that the facilities were connected. The owner has
requested that I appeal this requirement because the two
facilities are not connected in any way and the sidewalk would be
constructed along a private driveway between the two facilities.
Please consider waiving this requirement. If you have any
questions please contact me.
Sinc
G.` Hester
,<
xc: Steve DeNoon, Jordon And Associates
attachments: l0~copies of site. plan
J
MEMORANDUM
To: Plannin and Zoning Commission
g ~, ,~
From :Veronica 7B. Morgan, Asst. City Engineer ~ €,
Date:. September 14, 1995
REs APPEAL OF A SIDEWALK REQUIREMENT AT THE COLLEGE
STATION PERSONAL CARE FACILITY SITE LOCATED AT 1151 ROCK
PRAIRIE. ROAD
On August 23, 1995 .the PRC met to review the site plan for the above referenced site..At
that meeting a sidewalk along the private drive between this facility and the Southwood
Living Center facility was required. In the Zoning Ordinance, the PRC has the discretion
to impose additional requirements when necessary to preserve public health,. safety and
general welfare. One of these additional requirements is 10.2 "B. Assured pedestrian
safety which may include the,provision of sidewalks along the perimeter of the property..."
The PRC is concerned about the safety of the residents at the Personal Care Facility being
able to leave the building and walk to other areas, which may include the Living Center or
other destinations along Rock Prairie Road. We realize that there will not be an extension
of~the sidewalk across the Living Center property to extend to Rock Prairie Road. The
safety concern exists along the private road where the detention pond exists. Citizens
walking along this roadway do not have a safe place to retreat because of the slopes on
the pond. Once on the Living Center property, the grass area could be used for
pedestrians, although the ideal situation would be to extend the sidewalk. The. Living
.Center is not a part of this site ,plan application and the PRC could not require the
extension of the.sidewalk along that property. Staff would recommend. denial of the
appeal, supporting the recommendation of the PRC.
PROJECT REVIEW COMMITTEE REPORT
August 23, 1995
TO: J. T. Compton
P. O. Box 419, Morrilton, AR 72110
Steve Jordan
3159 East. Mission Blvd., Suite 1, Fayetteville, AR 72703
Michael Hester,. Hester Engineering
7607 Eastmark, Suite 250, College Station, TX 77840
FROM: Project Review Committee
F
Jane Kee, City Pla er.:
Kent Laza, City Engir~er
Winnie .Garner, P&Z Representative
~ ,,,..
Others Attending
Natalie Thomas, Planning Technic'
Shirley Volk, Development. Coordinator
Veronica Morgan, Assistant City Engineer
Tony Michalsky, Electrical Operations Coordinator
Ray Crow, Brazos County Engineer Representative
George McLean, CSISD Representative
SUB7ECT: Site Plan-.College Station Personal Care Facility; .proposed facility to be located
at 1151 Rock Prairie Road, Tract A of the Southwood Holdings Subdivision
totaling 7.54 acres. (95-503)
A Project. Review Committee meeting was .held Wednesday, August 23, 1995 to discuss the
above mentioned site plan. P&Z Representative Garner moved to recommend approval of the site
plan with all of the conditions listed below with the exception of the sidewalk requirement
between the two facilities. This motion died due to lack of a second. City Engineer Laza moved
to approve phase one of the proposed site plan with the following discretionary items, ordinance
requirements and comments.:
CONDITIONS. OF APPROVAL:
Discretionary Items
_ Provide a sidewalk along the private drive between this facility and the Southwood Living
Center.
PRC Report
CS Personal Care
Case #95-503
Page 2 of 3
The following. is a list of ordinance requirements identified by the .Project ]Review
Committee. This list does not relieve the applicant of total compliance with all ~;urrent
ordinance requirements.
Ordinance Requirements
_ Show the ownership and current zoning of all abutting parcels. (With the exception of the
single family lots in the adjacent Southwood Forest subdivision.)
_ Supply information regarding medical waste for this facility.
_ The two proposed turnaround areas do not meet minimum requirements for emergency
vehicles. Modify the two turnaround areas to provide sufficient access for emergency
vehicles. (The revised turnaround proposed during .the meeting. with the gravel "T"
turnaround is acceptable.)
_ Curbing is required around the perimeter of all paved areas with the exception of the
temporary gravel turnaround since it will not be accessible to the public.
_ .Section 290.44 of the TNRCC code states .that "where dead ends are necessary as ~i stage
in the growth of a system, .they shall be located and arranged with a view to ultimately
connecting them to provide circulation". Show the proposed connection to the water line
in the Westchester Subdivision.
- The proposed entrance drive must be a designated fire lane.
_ Provide flow calculations for the fire hydrant located on the northernmost side ~of the
property - a loop system maybe required.
_ The fire department Siamese connection must be relocated to meet the minimum diistance
allowed between the Siamese connection and the closest fire hydrant.
_ The proposed fire hydrant in the rear of the. property may need to be relocated to provide
the minimum 3'00' coverage area for future phases.
_ Submit an irrigation plan with the construction documents.
There are' not enough landscape points provided to meet the minimum requirements. The
proposed live oak trees are 75 points and not ISO points.
_ Clearly identify the phasing of the project so that all of phase one plus 20' is includled in
the.. development area. (Include the detention pond plus 20` in phase one.)
_ Provide the minimum, maximum and average water, landscaping and sanitary sewer
demands.
_ Show where the sidewalks are located on the property. (The detail is shown on the site
plan but not the location.)
Within the drainage easement for the detention pond, determine if there is a flume and if it
ties into the outlet structure. The existing ponding problem should be addressed with the
proposed development.
PRC Report
CSPersonal Care
Case #95-503
Page 3 of 3
Comments/Concerns:
The sidewalk along Rock .Prairie Road has been damaged. Staff would like to see if this
developer would make repairs. It may help. the residents of this .complex if they wish to
use the sidewalk.
- Telephone. service will be provided from Rock Prairie Road from an existing underground
line along the north side. of that road. Contact G.T.E. Representative La Verne Akin at
(409) 821-4723 to coordinate telephone service requirements.
P&Z Representative Garner seconded the motion to approve the site plan with the above
mentioned conditions which passed unopposed (3 - 0).
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUlV1ENTS WITH THE REVISED
SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PJ_;RMIT
PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPIV>ENT
COORDINATOR SHIRLEY YOLK AT (409) 764-3570.
APPEAL PROCESS': An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within .five (5) days after the PRC Committee meting.
Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions
imposed, and a waiver and .surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the.: decision of the PRC shall file ten copies of
the final site plan as .approved by the .PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a written explanation of those items being appealed. Until said copies
are on file, no further development approval shall occur, and no further action by the Commission
shall take place. An applicant may appeal only certain aspects of site. plan review, and in the
absence of discretionary review by the Commission, or review pursuant to a petition, all other
aspects of the site plan_shall be final. Any notice of appeal-shall state with particularity the aspects
which are to be appealed. .Coordinate appeal process through Development Coordinator Shirley
Volk at (409) 764-3741:.