HomeMy WebLinkAboutMinutesPROJECT REVIEW .COMMITTEE .REPORT
January 12, 1996
TO: Karl Pitts, Karbrooke, Inca
2700 East Bypass #2000, College Station, TX 77840..
Stewart Kling, Kling Engineering
4103 Texas Avenue, Bryan, TX"77803
FROM: Project Review Committ ~~
Jane Kee, City Plann `-
Veronica Morgan, Assis ant ty Engineer
Craig Hall, P&Z Repres to ' e
Others Attending
Natalie Thomas, Planning. Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
LaUerne Akin, G.T.E. Representative
SUB7ECT: Parking Lot'Plan -Crystal Park Center;. proposed office facility to be located at
the southwest corner of State Highway 6 Frontage Road and F.M. 2818: (95-415)
A Project Review Committee meeting was held Wednesday, January 10, 1996 to discuss the
above .mentioned parking lot plan. Assistant City: Engineer Morgan moved to approve the
proposed site plan with the following ordinance requirements and. comments:
CONDITIONS OF APPROVAL:.
Discretionary Items:
The Committee encouraged the redesign of the existing access road to open up the radius
in order to provide a safer entrance .and exit. This is not a requirement.
The following is a .list of ordinance requirements identified by the Project Review
Committee.. This list does not relieve the applicant of total compliance with all current
ordinance requirements.
Ordinance Reduirements:
Site Plan Related.•
_ Correct the fire hydrant relocation detail. to match the site plan, (The disconnecting and
reinstallation of the existing fire hydrant is allowed if approved by the inspector for
reinstallation.)
PRC Report
Crystal Park Ctr.
Case #95-415
Page Z of 3
Ordinance Requirements ..(cont.):.:
Site Plan Related.•
Note that the utility easements as shown are all existing easements per the final plat.
Remove the fire lane from the. entrance drive along he rear of the building. Afire. lane is
not required in this area' and sufficient turnaround is not provided.
Staff cannot approve construction on someone else's property -the triangular piece of
property not owned by the applicant. Provide a letter from the property. owner granting
permission to construct on their .property prior to_ issuance of a building. permit. or site
drainage development permit..
Non-Site Plan Related.•
_ The proposed 3/4" irrigation and 1" building service: water .meters must be coordinated
withthe engineering plans.
Submit water and sanitary sewer .demands.
_ Submit an irrigation :plan prior to issuance of a certificate of occupancy.
Landscape Plan Related.•
Note that the tree survey is a complete survey.
The proposed screening along F.M. 2818 is nqt adequate. Provide five gallon photinias
on 5' centers along .thee F.M. 2818 frontage to meet the minimum Streetscape screening
requirements.
_ Verify the 24' tree barricades and the location of the .existing trees that are being
preserved; There does not seem to be enough room for the required barricades for the
existing trees. (Three of the five trees to be preserved are close to drives and .curbs. If
they cannot be barricaded sufficiently; modify the landscape legend and point tabulation.
Comments/Concerns:
Submit an elevation certificate prior to approval of the slab by the Inspection Department.
_ .Return the Electric Service Request form for the required underground electrical service.
The developer is responsible. for 20% of the cost of electrical service including the
installation of all conduit, .transformer pads and junction boxes per city design and
specifications. The .meter will be located on the transformer and service from the
transformer to the building is' the responsibility of the .owner. Submit service voltage
(120/208v 3 ph.) or (277/480v 3 ph.), electrical load data and outside disconnect location.
Coordinate electrical service requirements with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660..
Coordinate details with G.T.E. Representative Laverne Akin at (409) 821-4723.
.PRC Report
Crystal Park Ctr.
Case #95-415
Page 3 of 3
P&Z Representative Hall seconded the motion to approve the _site plan with the above mentioned
conditions which passed unopposed (3 - 0).
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE. REVISED
SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT
PROCESS.. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT
COORDINATOR SHIRLEY VOLK AT (409) 764-3.570.
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within five days. after the PRC Committee meeting..
Failure to appeal the PRC action .shall constitute a contractual acceptance of all. conditions
:imposed, and a waiver and surrender of all complaints, defects, or potential .invalidity, whether
under state or federal law. An applicant appealing: the decision. of the PRC shall file ten copies of
.the final' site plan as approved by the PRC, showing all changes and requirements :imposed by the
PRC, and accompanied by a wntten explanation of those items being appealed. Until said copies
are on file, no further development approval shall occur, and no further action by the. Commission
shall take place. An applicant may appeal only certain aspects of site plan review, and in the
absence of discretionary' review by the Commission, or review pursuant to a petition, all other
aspects of the site plan shall be final. Any notice of appeal. shall state with particularity the aspects
which are to be appealed. Coordinate appeal process hrough Development Coordinator Shirley
Volk at (409) 764-3741.
~ ~ ~,
t
"~" STAFF PRC REPORT ~ ~-~"~~-'
~~
C stal Park Center ~~
ry
~.
Case #95-415 ~~,~..-~~,--~c
~ 's ~
Discretionary Items: ~ `~(~ ;
_ None. ~ ~~,~~_ ~`".~t_-~- ~(
®rdinance Requirements: d ~ ~j,~
Site Plan Related:
hp~ed ire ri ~kle au ~ c flow t
~' Note that the utility easements as shown are all existing easements .per the final plat.
~- Correct the fire hydrant relocation detail. (The disconnecting an reinstallation of the
existing fire hydrant is .allowed if approved by the inspector for reinstallation.)
~ Remove the fire lane from the entrance drive along the rear of the building. Afire lane is
not required_in this area and sufficient turnaround is'not provided.
_~ Staff cannot approve construction on someone else's. property -the triangular piece of
property not owned by the applicant.. building permit or site drainage development
permit will not be issued until thi~ si uat~ ~~ ~s r~~~~~~,~ ~yQ~~,x;~_~,'Y...- (~.~~~;
rlon®Site Plan Related.• ~~ ~~
i/_ The proposed 3/4" irrigation and 1" building service water meters must be coordinated
with the engineering plans.
_ Submit water and sanitary sewer demands.
~-- How will the drainage from the property get to the primary channel? .This issue and any
required off-site drainage easements must be addressed as part of the drainage plan.
Submit an irrigation plan prior to issuance of a certificate of occupancy.
.Landscape Plan Related.•
Note that the tree survey is a complete surve .
® ~~~~.~
~(,~/ The proposed screening is not adequate. Provide five gallon photinias on 5' centers along
the F.M. 2818 frontage to meet the minimum Streetscape screening requirements.
~/~ Verify the 24' tree barricades and the location of the existing trees that are being
preserved. There does not seem to be enough room for the required barricades for the
existing trees. ° ~, ~' ~ ~~~~
~-~--
,,
~~
,Staff PRC Report
Crystal Park Center
Case #95-419
Page 2 of 2
Comments/Concerns: ~s'. ~~ ,
-i`~~~
® Submit an elevation certificate. prior to approval. of the slab'°~
~°°~ ~~ "Return the Electric Service Request form for the required underground electrical service.
,/~ ® The developer is responsible for 20% of .the cost of electrical service including the
installation of all conduit, transformer pads and junction boxes per city design and
specifications. A temporary .blanket easement is needed prior to installation of utilities.
The meter will be located on the transformer. and service from the transformer to the
building is the responsibility of the owner. Submit service voltage (120/208v 3 ph.) or
(277/480v 3 ph.), electrical. load .data and outside disconnect location. Coordinate
~°" electrical service requirements with Electrical Operations Coordinator Tony Michalsky at
(409) :764-3b60.
,~~V
If.Ery a ar enter wi not ave a separate telephone service tro
® m rom a exis m emarca i the developer. is ,,
' or e conduit and wire between the two ui mgs. --~-
s~epara e o rystal Park Plaza eas m i n rove
has existing facilities along the .west side of the Frontage oa .
Se a es a is a rom a green
Coordinate
details with G.T.E.. Representative Laverne Akin at (409) 821-4723.
~!