Loading...
HomeMy WebLinkAboutMinutesPRC Report J S. T. Concrete Corse #95-412 Page 2 of 3 • Ordinance Requirements (cont.): e ® Dimension the parking spaces. / Provide pavement and curb details that comply with local cod and ordinances. 9 Provide landscaped end islands at the end of the parking ow. r _ .Note the location oft _salid waste-container _--_ _.___4_,;_,_..--- ----- ~_ Provide screening along the west side of f om the Dowlin right-of- ~~' way past the convenience store and alon the east side along the stockpile area. ,~~~,,1~~~`'~ ~~a • _i Show the railroad spur. ~;~'~~'~~ ~~~ ~~_ __ ___- ~ ~ ~ ~,'s~~~ ~ ~ ~~ "~ - ~ ~;.~r ~. Show the existing or proposed fence oir ga- t °~tiatr~lubit public access `~ ., Lar o"f the building and remove the curb line from that drive aisle. Show locations and sizes of existing and proposed water and sanitary sewer lines. Show the closest fire hydrant. Change the scale to an engineer's scale (recommended 1" = 20'). Provide a parking legend to include the parking calculations. ~____ ~---- _._....: s Submit drainage report with desilting information expaining how the s d and gravel will be contained on the site.. ~~ r ~ ~ ~ ~ ~`~___ Show the proposed vehicle storage (trucks, etc.. Comments/Concerns: ' ~; w__ The customer must provide two 4" conduits from the power pole to the transformer ~ e location including 30' of 4" galvanized to be placed up the power pole by the City. The customer is also responsible for 20% of the total cost of service. Coordinate details with Electrical Line Coordinator Don Lusk at (409) 764-3660. Coordinate any changes to the existing telephone facilities with G.T.E. Representative Laverne Akin at (409) 821-4723. P&Z Reporesentative Hall seconded the motion to approve the site plan with the above mentioned conditions which passed unopposed (3 - 0). PRC Report J.S. T. Concrete Case #95-412 Page 3 of 3 SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570. APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning Commission within five days after the PRC Committee meeting. Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of the final site plan as approved by the PRC, showing all changes and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed. Until said copies are on file, no further development approval shall occur, -and no further action by the Commission shall take place. An applicant may appeal only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed. Coordinate appeal process through Development Coordinator Shirley Volk at (409) 764-3741. P®St~it® Fax Note 7671 Date ~ pa°ges® -r®~:~EG ~~/i ~~ From pL~' Co./Dept. Co. Phone # Phone # ~ S ~~ r ~ s .®-.,s o ®u~ ~ a PROJECT REVIEW COMMITTEE REPORT May 22, 1995 TO: Greg Truitt, J.S.T. Concrete 101 West Loop. West, College Station, TX 77840 FROM: Project Review Committee Jane Kee, City Planner Veronica Morgan, Assistant City Engineer Craig Hall, P&Z Representative Others Attending Natalie Thomas, Planning Technician Don Lusk, Electrical Line Coordinator SUBJECT: Parking Lot Plan -J.S.T. Concrete; proposed concrete hatching plant to be located at 101 West Loop West, previously Wickes Lumber Supply near the Dowling Road intersection. (95-412) A Project Review Committee meeting was held Wednesday, May 17, 1995 to discuss the above mentioned parking lot plan. City Planner Kee informed the Committee that the existing site is losing its nonconforming status due to the change of use of the facility. The property must comply with all current codes and ordinances. Assistnat City Engineer Morgan moved to approve the proposed site plan with the following discretionary items, ordinance requirements and comments: CONDITIONS OF APPROVAL: Discretionary Items: _ All conditions of approval imposed by the TNRCC must be complied with as well as the following ordinance requirements. The following is a list of ordinance requirements identified by the Project Review Committee. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: _ Show the required 6" curb around the perimeter of the parking area. The landscape and streetscape calculat"cons are acceptable. PRC Report J.S.T. Concrete Case #95-412 Page 2 of 3 Ordinance Requirements (cont.): Dimension the parking spaces. Provide pavement and curb details that comply with local codes and ordinances. Provide landscaped end islands at the end of the parking row. Note the location of the solid waste container. _ Provide screening along the west side of the property from the Dowling Road right-of- way past the convenience store and along the east side along the stockpile area. Show the railroad spur. _ Show the existing or proposed fence or gate that will prohibit public access to the rear of the building and remove the curb line from that drive aisle. Show locations and sizes of existing and proposed water and sanitary sewer lines. Show the closest fire hydrant. Change the scale to an engineer's scale (recommended 1" = 20'). Provide a parking legend to include the parking calculations. _ Submit drainage report with desilting information expaining how the sand and gravel will be contained on the site. Show the proposed vehicle storage (trucks, etc.). Comments/Concerns: _ The customer must provide two 4" conduits from the power pole to the transformer location including 30' of 4" galvanized to be placed up the power pole by the City. The customer is also responsible for 20% of the total cost of service. Coordinate details with Electrical Line Coordinator Don Lusk at (409} 764-3660. _ Coordinate any changes to the existing telephone facilities with G.T.E. Representative Laverne Akin at (409) 821-4723. P&Z Representative Hall seconded the motion to approve the site plan with the above mentioned conditions which passed unopposed {3 - 0). PRC Report J.S.T. Concrete Case #95-412 Page 3 of 3 SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT COORDINATOR SHIRLEY VOLK AT (409) 764-3570. APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning Commission within five days after the PRC Committee meeting. Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state or federal law.. An applicant appealing the decision of the PRC shall file ten copies of the final site plan as approved by the PRC, showing all changes and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed. Until said copies are on file, no further development approval shall occur, and no further action by the Commission shall take place. An applicant may appeal only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed. Coordinate appeal process through Development Coordinator Shirley Volk at (409) 764-3741. ~ti~ ~~~~~1Y~1../Ya---~ STAFF PRC REPOR'T' off- ~~~ J.S.T. Concrete Casc #94-412 ~~'l Discretionary Items: 1 - d None. ~ ~ ~ ~/ Ordinance Requirements: / Show the required 6" curb around the perimeter of the parking area. (/ The landscape and streetscape calculations are acceptable. ~/ Dimension the parking spaces. (,,' ~--- Provid~pavement anted ccurb details. "d ~~~,,.~ //- ~ . Provide end islands at the end of the parking row. ( ~C-(~~., mot„-- c/~ Note the location of the solid waste container. ((nn# Provide s~eenrng alon t e west sr (see site plan for actual location) and th east side along the stockpile area. ~ ~-~.~, ~ 5T Show the railroad spur. , ~ ~1 ~... L ~--~ ~/Show the building. proposefen e or `gate ~~-.,~`- t~ Water and sewer lines? that will prohibit public access to the rear of the rc--, -.~ t/ Show the closest fire hydrant. Submit the minutes from the TNRCC public hearing. ~ Scale? d-,..,~. I = ,~~ ~ ~ ~ C.XC~' ~ '~ , r/ Provide parking calculations. ,,,~) ,/'- Submit drainage report with desilting information. t/'" Show the proposed vehicle storage (trucks, etc.). Comments/Concerns: GTE & Electrical comments. ~. ¢ {/J. f~' ,~l` PRC Report J.S. T. Concrete Case #95-412 Page 2 of 3 Ordinance Requirements (cont. Dimension the parking spaces. ® Provide pavement and curb details that comply with local cod and ordinances. ~ - ' ~ ~ ` Provide landscaped end islands at the end of the parking ow. r , Note the location of thf:_solid-uvaste-cflntaine~__ - - -_ Provide screening along the west side of om the Dowlin right-of~~~ way past the convenience store and alon the east side along the stockpile area. _ ~ Show the railroad spur. ~ ~~ !mot - ~- _ ~~ ~ ~ // ,fir _ Show the existing or proposed fence or gate at-~wi~tl ohibit public access o ~ the building and remove the curb line from that drive aisle. _ Show locations and sizes of existing and proposed water and sanitary sewer lines. _ Show the closest fire hydrant. Change the scale to an engineer's scale (recommended 1" = 20'). Provide a parking legend to include the parking calculations. _.__-_ _ ___ - ____ ~, __. Submit drainage report with desalting mformatio _ ~ _ .--~ -~ ~~ ~ n expaining how the d and gravel will be contained on the srte.__ _ `~~~/ ~ ~ ~p~„~ Show the proposed vehicle storage (trucks, etc.. tip`-~''W I ~~GG Ye Comments/Concerns: J `~~ '"- i 1-j'~~'`-/~ The customer must provide two 4" conduits from the power pole to the transformer location including 30' of 4" galvanized to be placed up the power pole by the City. The customer is also responsible for 20% of the total cost of service. Coordinate details with Electrical Line Coordinator Don Lusk at (409) 764-3660. Coordinate any changes to the existing telephone facilities with G.T.E. Representative Laverne Akin at (409) 821-4723. P&Z Reporesentative Hall seconded the motion to approve the site plan with the above mentioned conditions which passed unopposed (3 - 0). PROJECT REVIEW COMMITTEE REPORT May 22, 1995 TO: Greg Truitt, J.S.T. Concrete 101 West Loop West, College Station, TX 77840 FROM: Project Review Committee y nt City Engineer Veron ca Morgana Ass`~St~~f~ Craig Hall, P&Z Repres ntative ~,~ ~ Others Attending ~~ ~' i ~I{,li~~~i; ~;, Natalie Thomas, Planning Technician~~~~ Don Lusk, Electrical Line Coordinator SUBJECT: Parking Lot Plan - J.~S T. Concrete; proposed concrete batching plant to be located at 101 West Loop West, previously Wickes Lumber Supply near the Dowling Road intersection. (95-412) A Project Review Committee meeting was held Wednesday, May 17, 1995 to discuss the above mentioned parking lot plan. City Planner Kee informed the Committee that the existing site is losing its nonconforming status due to the change of use of the facility. The property must comply with all current codes and ordinances. Assistnat City Engineer Morgan moved to approve the proposed site plan with the following discretionary items, ordinance requirements and comments: CONDITIONS OF APPROVAL: Discretionary Items: All conditions of approval imposed by the TNRCC must be complied with as well as the following ordinance requirements. The following is a list of ordinance requirements identified by the Project Review Committee. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Show the required 6" curb around the perimeter of the parking area. The landscape and streetscape calculations are acceptable. PRC Report J.S.T. Concrete Case #95-412 Page 2 of 3 Ordinance Requirements (cont.): Dimension the parking spaces. Provide pavement and curb details that comply with local codes and ordinances. _ Provide landscaped end islands at the end of the parking row. Note the location of the solid waste container. Provide screening along the west side of the property from the Dowling Road right-of- way past the convenience store and along the east side along the stockpile area. Show the railroad spur. Show the existing or proposed fence or gate that will prohibit public access to the rear of the building and remove the curb line from that drive aisle. Show locations and sizes of existing and proposed water and sanitary sewer lines. Show the closest fire hydrant. _ Change the scale to an engineer's scale (recommended 1" = 20'). _ Provide a parking legend to include the parking calculations. _ Submit drainage report with desilting information expaining how the sand and gravel will be contained on the site. Show the proposed vehicle storage (trucks, etc.) Comments/Concerns: _ The customer must provide two 4" conduits from the power pole to the transformer location including 30' of 4" galvanized to be placed up the power pole by the City. The customer is also responsible for 20% of the total cost of service. Coordinate details with Electrical Line Coordinator Don Lusk at (409) 764-3660. Coordinate any changes to the existing telephone facilities with G.T.E. Representative Laverne Akin at (409) 821-4723 . P&Z Reporesentative Hall seconded the motion to approve the site plan with the above mentioned conditions which passed unopposed (3 - 0). PRC Report J.S.T. Concrete Case #95-412 Page 3 of 3 SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT COORDINATOR SHIRLEY VOLK AT (409) 764-3570. APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the Planning and Zoning Commission within five days after the PRC Committee meeting. Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of the final site plan as approved by the PRC, showing all changes and requirements imposed by the PRC, and accompanied by a written explanation of those items being appealed. Until said copies are on file, no further development approval shall occur, and no further action by the Commission shall take place. An applicant may appeal only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects which are to be appealed. Coordinate appeal process through Development Coordinator Shirley Volk at (409) 764-3741. AGENDA ~1~ Project Review Committee CITY OF COLLEGE STATION, TEXAS City Hall Council Room Wednesday, June 21, 1995 9:00 A.M. CONDITIONAL USE PERMIT - Cellular One Cell Site; proposed cellular telecommunications tower to be located on an 80' x 80' lease site out of a 24.97 acre tract in the Augustus Babille Survey on the southwest corner of the Arrington Road and Greens Prau7e Road intersection. (95-706) PARKING LOT PLAN -Mixed Use Development; proposed car wash, dry cleaner and oil & Tube center to be located on Tract F-3 of the Ponderosa Place II subdivision located _=~ to the north of the existing Exxon building on the northwest corner of the Rock Prairie Road and State Highway Frontage Road intersection. (95-413) CONDITIONAL USE PERMIT -Brethren Church of B/CS; proposed building totaling 3785 square feet to be built at the existing church site at 2650 East Bypass near the Crystal Park Plaza. (95-707) FINAL PLAT -Woodcreek Section Seven; proposed plat totaling 6.729 acres divided into 23 single family planned unit development lots located in south of Woodcreek Section One, east of Woodcreek Six South and west of the Stonebrook Drive extension. (95-223) FINAL PLAT -Oakwood Middle School; proposed plat of the Oakwood Middle site along both sides of Holik Street at the George Bush Drive intersection into four lots totaling 38.583 acres. (95-221) PRELIMINARY PLAT -Crystal Park Subdivision; proposed plat of 38.68 acres divided into 4 lots zoned single family and A-P located on near the southwest corner of the F.M. 2818 and State Highway 6 East Bypass intersection. (95-308) PRELIMINARY PLAT -Parkway View Addition; proposed plat of 5.43 acres divided into 4 duplex lots and a reserve tract located on the northwest corner of the Woodsman Drive and Southwest Parkway intersection. (95-309) PRELIMINARY PLAT -Arbors at Wolf Pen Creek; proposed plat of 8.49 acres consisting of one Wolf Pen Creek. zoned lot located along the north side of Holleman at the Lassie Lane intersection. (95-310)