Loading...
HomeMy WebLinkAboutMinutes04i12i95 06:56 GTE ENGINEERING ERYAN 002 I ~_ ~"F~r _ I 1 A(iEl'~DA L Project Revie Committee CI'1'~ QF COLLEGE;STATION,'T'FXAS City Hall C ~ cil Room '112,1995 Wednesday, 10:00 !A.~I. i PARKING LOT PLAN -Brad Martin NurPs~ . ~ proposed tat aeri'uSerYe Hors ry is current y at 3020 Texas Avenue South (form ly Sunset {~ ) Thh operating under an itinerant vendor it ttjat cxpises soon. S~~w ~.~.s.~irJc ~ F fJ~.acQ. I - ~.cM<h Ca~~ ,~iu~nq .~-~rrm td~ -U17 L ememt Cann ~ Che, /tkC~ ~2 PROJECT REVIEW COMMITTEE REPORT April 13, 1995 TO: Brad Martin 3020 Texas Avenue, College Station, TX 77840 FROM: Project Review Committee Jane Kee, City Planner Kent Laza, City Engineer Others attending: David Moore, Building Official Don Lusk, Electrical Line Designer Shirley Volk, Development Coordinator SUBJECT: Parking Lot Plan -Brad Martin Nursery; establishing a permanent business at site of the former Sunset Gardens Nursery (95-408) The Project Review Committee met on Wednesday, May 12, 1995 to review the subject project. City Engineer Laza made a motion to approve the proposed plan with the following ordinance requirements and comments. The following is a list of ordinance requirements identified by the P.R.C. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Site Plan related: _ The non-conforming status of this site has been lost due to the length of time it has been unoccupied. All ordinance .requirements must be met. _ Submit a landscape plan which shows existing landscaping and proposed landscaping. The streetscape requirements must be met. Include a legend showing points required and points proposed. Improve surface of parking lot. _ Place curbing at edges of the parking lot. _ Repair or remove broken wheel stops. Re-stripe the parking lot. Clean up the alley behind the project. _ Re-seed or landscape areas where landscaping or grass has died. _ Submit fencing and tarpaulin details. _ Submit details of buildings. One unisex bathroom accessible to handicapped persons is allowable. _ Show handicap parking spaces. _ A sidewalk will be required along the frontage of Texas Avenue because the Sidewalk Master Plans includes a walk in this area. Show location and details of the sidewalk on the revised site plan. The sidewalk requirement can be appealed to the Planning and Zoning Commission upon receipt of a letter requesting a variance to that requirement. Show how the dumpster will be screened. ~~(("" ~_ h existi g fire h nts . . Draw a phase line 20 feet beyond the closest corner of the building. All violations beyond that Fine will be handled as code enforcement violations, and notification will be made to the owner of the property. Comments/Concerns: _ Revise and submit a site plan which reflect all details of everything existing and proposed on the site, and which includes all dimensions necessary to review the plan. This revised plan can include the streetscape/landscape plans, or those plans can be submitted on a separate drawing. Once these plans are approved the applicant will be issued a moving permit which will allow him to bring the portable buildings on the site. The buildings cannot be occupied until a certificate of occupancy has been issued. If the applicant prefers to defer completionany requirements which are not health and safety related, a Temporary Certificate of Occupancy is possible, with the applicant providing cost estimates for items being deferred and the submission of the application for Temporary Certificate of Occupancy. Once the document is prepared by the Legal Department and the applicant supplies an acceptable financial guarantee for the items deferred, the Temporary Certificate of Occupancy can be issued. _ The customer will be asked to contribute 20% of the total cost of the electrical installation for this project. The customer will be asked to supply 2- 2" conduits from a meter pole to the City power pole with the customer supplying 3- 10' stalks of 2" rigid and weatherhead for the City to install on our power pole. Complete and return the service request form. _ The GTE representative was unable to attend the meeting, but has sent the following requirements which are required for their service: Show existing and proposed easements. Place 1' 2" conduit with pull string from the outside building termination to the existing or proposed easement along the rear property line. Coordinate details with Laverne Akin of GTE at 821-4723. City Planner Kee seconded the motion to approve the proposal with the above conditions. Motion to approve carried unanimously (2-0). °I (CITY OF COLLEGE STATION NT PROJECT REVIEW COMMITTEE REPORT April 13, 1995 T®: Brad Martin 3020 Texas Avenue, College Station, TX 77840 FROM: Project Review Committee Jane Kee, City Plan r Kent Laza, City Engi e Others attending: David Moore, Building Official Don Lusk, Electrical Line Designer Shirley Volk, Development Coordinator SUBJECT: Parking Lot Plan -Brad Martin Nursery; establishing a permanent business at site of the former Sunset Gardens Nursery (95-408) The Project Review Committee met on Wednesday, May 12, 1995 to review the ~` subject project. City Engineer Laza made a motion to approve the proposed CQ' plan with the following ordinance requirements and comments. The following is .~ a list of ordinance requirements identified by the P.R.C. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Site Plan related: _ The -conforming status of this site has been lost due to the length of time ~ as been unoccupied. All ordinance requirements must be met. _ Submit a landscape plan which shows existing landscaping and proposed landscaping. Include a legend showing points required and points proposed. ® Improve surface of parking lot. ® Place curbing at edges of the parking lot. ® Repair or remove broken wheel stops. DEVELOPMENT SERVICES DEPARTME DEVELOPMENT SERVICES DEPARTMENT Posf Office Box 9960 1101 Texas Avenue Post Office Box 9960 1101 Texas Avenue College Station. Texas 77842-0960 College Station, Texas 77842-0960 <409) 764-3570 <409) 764-3570 "Building a Better City in Partnership with You" Cleanup the alley behind the project. ~-~ ~~ t i5 ~r• P ® Re-seed or landscape areas where landscaping or grass has died. ® Submit fencing and tarpaulin details. _ Submit details f buildings. One unisex bathroom accessible to handicapped persons ' Ilowablea ~a~i ~~~ ~ ~~' ~-• Show handicap parking spaces. ~`:~. A sidewalk will be required along the frontage of Texas Avenue because .the Sidewalk Master Plans includes a walk in this area. Show location and details of the sidewalk on the revised site plan. The sidewalk requirement can ~ l be appealed to the Planning and Zoning Commission upon receipt of a letter requesting a variance to that requirement. Show how the dumpster will be screened. ® The existing fire hydrants are adequate to serve this site. The alley must be clear and marked as a fire lane. Enclosed with this letter are directions for marking fire lanes. Draw a phase line 20 feet beyond the closest corner of the building. All vi tions beyond that line will be handled as code enforcement violations, and otification will be made to the owner of the property. Comments/Concerns: _ Revise and submit a site plan which reflect all details of everything existing and proposed on the site, and which includes all dimensions necessary to review the plan. This revised plan can include the streetscape/landscape plans, or those plans can be submitted on a separate drawing. Once these plans are approved the applicant will be issued a moving permit which will allow him to bring the portable buildings on the site. The buildings cannot be occupied until a certificate of occupancy has been issued. ® If the applicant prefers to defer completion of any requirements which are not health and safety related, a Temporary Certificate of Occupancy is possible, with the applicant providing cost estimates for items being deferred and the ., submission of the application for Temporary Certificate of Occupancy. Once the ' .~;3 document is prepared by the Legal Department and the applicant supplies an ~~ E ~~ acceptable financial guarantee for the items deferred, the Temporary Certificate of Occupancy can be issued. _ The customer will be asked to contribute 20% of the total cost of the electrical installation for this project. The customer will be asked to supply 2- 2" conduits from a meter pole to the City power pole with the-customer supplying 3- 10' stalks of 2" rigid and weatherhead for the City to install on our power pole. Complete and return the service request form. The GTE representative was unable to attend the meeting, but has sent the following requirements which are required for their service: Show existing and proposed easements. Place 1' 2" conduit with pull string from the outside building termination to the existing or proposed easement along the rear property line. Coordinate details with Laverne Akin of GTE at 821-4723. Cit tanner Kee seconded the motion to approve the proposal with the above conditi. s. Motion to approve carried unanimously (2-0). SUBMIT 6 R ISED SITE/LANDSCAPE PLANS FOR APPROVAL PRIOR TO MOVING THE RTABLE BUILDINGS ON THE SITE. SUBMIT 3 SETS OF BUILDING PLANS OR REVIEW PRIOR TO ISSUANCE OF A BUILDING PERMIT WHICH W ALLOW WORK TO BE DONE IN/ON/TO THE BUILDINGS PRIOR TO I UANCE OF A CERTIFICATE OF OCCUPANCY. APPEAL PROCESS: An app ~ ant Review Committee to the Planning the PRC meeting. Failure to app contractual acceptance of all conditior all complaints, defects, or potential irn An applicant appealing the decision c site plan as approved by the PRC, imposed by the PRC, and accompani being appealed. Until said copies are shall occur, and no further action b applicant may anneal only certain may appeal the decision of the Project '_oning Commission within five days after the PRC action shall constitute a im sed, and a waiver and surrender of ~lidity, ether under state or federal law. the PRC all file ten copies of the final showing all anges and requirements d by a written ex nation of those items on file, no further d elopment approval the Commission shall ke place. An soects of site elan revie .and in the absence of discretionary review by the Commission, or review pur ant to a petition, all other. aspects of the site plan shall be final. Any notice of ppeal shall state with particularity the aspects which are to be appealed. Coordinate appeal process through the Development Coordinator at 764-3570.