HomeMy WebLinkAboutMinutesSTAFF PRC REPORT
Care Plus Optometrist Office ~~
~ ~-
Case #95-403
Discretionary Items:
None.
Ordinance Requirements:
,~°°"""Provide drainage information. A drainage development permit is required priox to any site
ork. ~ ~~~rr~""y
_ Tim's comments regarding the fire lanes. ~ . ~~ ~
.,
~ ~ Do sidewalks aye ramps at the driveway? ADA requirements must be met wit this
1
development.
y- r ' Supply screening for parking that is located along Texas Avenue frontage through the use
of a berm, .hedges or a retaimng wall.
_ Provide the size and location of all existing utilities. Show the service location from the
site to the building.
_ In the parking legend, state the number of parking spaces required. ..C' ~ ~- ~-~ ~~,
Dimension the parking spaces and driving aisles. May need to remove wheel stops at the
Optometrist's office.
No impact fees are required..:,
_.
Provide curb details, pavement details and sidewalk details for any new areas.
~_~~ ~
Comments/Concerns:
_ G.T.E. would like to discuss how this development will be served with telephone service.
Will it be served through the current Care Plus switch or will it stand on its own? It
cannot be served through the bank as it is currently being served. If it to be served
through the existing Care Plus, the developer/owner is responsible for conduit and cable
placement from Care Plus to the new development. If it is to stand on its own, the
developer will have to place and provide conduit for G.T.E. to place cable. Coordinate
service. details with G.T.E. Representative Laverne Akin at (409) 821-4723.
_ The electrical service will be provided from the existing transformer which is located at the
northwest corner of the property. The customer will be required to supply conduit from
the new building to the existing transformer. The size of the conduit will be determined
when the load information is available. The voltage supplied to this building will be
277/480 volt. The customer is required to contribute 20% of the cost of supplying
electrical. service. Coordinate details with Electrical Line Coordinator Don Lusk at (409)
764-3660.
PROJECT REVIEW COMMITTEE REPORT
February 6, 1995
TO: Robert P. Morris
413 West Main, Waxahachie, TX 75165
WSAArcMtects-Engineers
405 Mitchell, Bryan, TX 77802
FROM: Project Review Committee ~ `?
Jane Kee, City Pla er .- ~R
Veronica Morgan, As`"istan~ City Engineer
Julius Gribou, P & Z ~ presentative
Others Attending
Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Don Lusk, Electrical Line Coordinator
Pete Vanecek, Senior Parks Planner
Laverne Akin, G.T.E. Representative
SUBJECT: Parking Lot Plan -Cate Plus Optometrist Office; proposed addition to the
existing ATM building on the Care Plus site located at 2411 Texas Avenue, lot 2,
block 1 of Brentwood Section Four, on the northeast corner of the Texas Avenue
and Southwest Parkway intersection. (95-403)
A Project Review Committee Meeting was held Wednesday, February 1, 1995 to discuss the
above mentioned parking lot plan. P&Z Representative Gribou moved to recommend approval of
the parking lot plan with the following conditions:
CONDITIONS OF APPROVAL:
Discretionary Items:
Remove the existing parking located along the rear of the existing Care Plus building
along the access drive from Southwest Parkway. These parking spaces are designated as
parallel parking spaces on the site plan; however, the cars are parked at an angle and could
cause future safety concerns.
_ Provide ramps from the existing sidewalk along Southwest Parkway and on both sides of
the existing driveway to meet ADA (Americans with Disabilities Act) requirements.
_ Supply screening for parking that is located along the Texas Avenue frontage immediately
in front of the proposed optometrist office through the use of a berm, hedges or a
retaining wall. Staff encourages that the screening be continued along the Texas Avenue
frontage in front of the existing Care Plus building; however, this is not a requirement, it is
only a suggestion to meet the intent of the recently adopted Streetscape Ordinance.
PRC Report
Care Plus Optometrist
Case #95-403
Page 2 of 3
The following is a list of ordinance requirements identified by the Project Review
Committee. This list does not relieve the applicant of total compliance with all current
ordinance requirements.
Ordinance Requirements:
Site Plan Related.•
Provide drainage information. A drainage development permit is required prior to any site
work.
Fire lanes shall be installed if any part of the structure is more than one hundred fifty feet
from a public street, alleyway, or highway provided, however, that such structure may be
erected at a greater distance if the owner or developer designates, constructs and
maintains a fire lane having a minimum width of 20' and minimum height clearance of 14',
terminating within 150' of the furthermost point of such structures.
Provide the size and location of all existing utilities. Show the service location from the
site to the building.
_ In the parking legend, state the number of parking spaces required.
_ Dimension the parking spaces and driving aisles. May need to remove wheel stops at the
Optometrist's office.
Provide curb details, pavement details and sidewalk details for any new areas.
Non-Site Plan Related:
_ No impact fees are required with this development.
Comments/Concerns:
_ G.T.E. would like. to discuss how this development will be served with telephone service.
Will it be served through the current Care Plus switch or will it stand on its own? It
cannot be served through the bank as it is currently being served. If it to be served
through the existing Care Plus, the developer/owner is responsible for conduit and cable
placement from Care Plus to the new development. If it is to stand on its own, the
developer will have to place and provide conduit for G.T.E. to place cable. Coordinate
service details with G.T.E. Representative Laverne Akin at (409) 821-4723.
_ The electrical service will be provided from the existing transformer which is located at the
northwest corner of the property. The customer will be required to supply conduit from
the new building to the existing transformer. The size of the conduit will be determined
when the load information is available. The voltage supplied to this building will be
277/480 volt. The customer is required to contribute 20% of the cost of supplying
electrical service. Coordinate details with Electrical Line Coordinator Don Lusk at (409)
764-3660.
PRC Report
Care Plus Optometrist
Case #95-403
Page 3 of 3
Assistant City Engineer Morgan seconded the motion to approve the site plan with the above
mentioned conditions which passed unopposed (3 - 0).
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT
PROCESS. COORDINATE FUTURE SUBMITTALS WITH DEVELOPMENT
COORDINATOR SHIRLEY VOLK AT (409) 764-3570.
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee
to the Planning and Zoning Commission within five days after the PRC Committee meeting.
Failure to appeal the PRC action shall constitute a contractual acceptance of all conditions
imposed, and a waiver and surrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the decision of the PRC shall file ten copies of
the final site plan as approved by the PRC, showing all changes and requirements imposed by the
PRC, and accompanied by a written explanation of those items being appealed. Until said copies
are on file, no further development approval shall occur, and no further action by the Commission
shall take place. An applicant may appeal only certain aspects of site plan review, and in the
absence of discretionary review by the Commission, or review pursuant to a petition, all other
aspects of the site plan shall be final. Any notice of appeal shall state with particularity the aspects
which are to be appealed. Coordinate appeal process through Development Coordinator Shirley
Volk at (409) 764-3741.