Loading...
HomeMy WebLinkAboutMiscellaneousJuly 11, 1995 Mr. Steve Utley First Worthing Company 8144 Walnut Hill Lane Suite 550 LB-6 Dallas, TX 75231 Dear Steve: Sorry for the delay in getting this letter prepared. We°ve been totally swamped. Instead of trying to estimate what amount of time your architects and engineers will need to make revisions, etc. on your plans, I have decided the best way for me to address your questions is to include our flow chart which depicts the building permit process, and I will identify the amount of time each step which takes place in City Hall will take. Of course, the number of times a set of plans is returned for revisions will have a great deal of bearing on the total amount of time it takes to review the plans, so the flow chart depicts the best-case- scenario. I hope this will help to answer your questions. If you have others, please do not hesitate to contact me. We look forward to the receipt of your plans so the review process can begin. Yours very truly, Shirley J. Volk Development Coordinator July 12, 1995 Mr. Steve Utley First Worthing Company 8144 Walnut Hill Lane Suite 550 LB-6 Dallas, TX 75231 Dear Steve: I seem to be apologizing for something each time I write, but I would like to clarify one point that I neglected to include in the letter I faxed to you yesterday. That point being that platting this property is not required by the City since there is actually no subdivision of land taking place. Because platting is not a requirement, it will not be an impediment to issuance of a building permit. We would, however, urge you to plat this property for purposes of official documentation, as well as to convey certain easements to cover City infrastructure and the dedication of the right-of-way for South Kyle street. Prior to issuance of a building permit, the City will require that you dedicate a "temporary blanket easement" to cover the entire tract and will give coverage to infrastructure being built and City personnel inspecting and doing work on the property during construction. This "temporary blanket easement" can be released with the filing of the final plat or with submission and filing of an "easement dedication plat" which would show the actual locations of required easements to cover the infrastructure which will be dedicated to the City, rather than to try to install the infrastructure in specific locations already covered by easements. Whatever vehicle is chosen to accomplish the release of the temporary blanket easement should be processed after completion of the project and issuance of the Certificate of Occupancy. I am enclosing "Easement Information Sheets" which explains what is required for preparation of the temporary blanket easement. I hope this will help to answer your questions. If you have others, please do not hesitate to contact me. Yours very truly, Shirley J. Volk Development Coordinator CITY OF COLLEGI/ STATIOI`I Post ®ffice Box 9960 1101 Texas Avenue College Station, Texas 77842-9960 (409) 7643500 October C, 1995 Mr. Bart Munro 6480 Waterway College Station, TX 77845 Dear Mr. Munro: In response to Mr. Utley's request of October 5th for a letter to be sent to you addressing the impact of a drainage easement on a tract of land, I offer the following: In reference to drainage easements, the Subdivision Regulations for the City state that "...Such easement shall not be considered a part of the lot area for purposes of minimum lot size requirements of the zoning ordinance...". Therefore, a drainage easement. would reduce the "size" of the lot. The .proposed location and width of the utility easement carrying the underground storm sewer, as shown on the attachment, will not affect the density calculation for the Munroe property. To include this easement as part of the overall lot for density purposes does not violate the intent of the section quoted from the Subdivision Regulations. In the ins#ance where a drainage easement encumbers a large portion of a property it should be excluded from any density calculation. Placing your storm sewer in a pipe underground will allow you to also utilize the easement area for other paved surfaces such as parking. The Commercial uses allowed in -the Wolf Pen Creek zoning district require front setbacks of 25 feet, rear setbacks of 15 feet and side setbacks of 7.5 feet. Multi-family uses typically require a front setback of 25 feet, rear setback of 20 feet and side setback of 7.5 feet. If a drainage easement is located in one of the areas where a setback is required, the setback and the drainage easement can' overlap. We hope this information will help you. If you have any other questions, please do not hesitate to contact us. Yours very truly, ~, Ja a R. Kee, AICP ity Planner cc: File Home off Texas A>;t~ university i~;~~n~ ~# ct1rC, `~ CITY OF COLLEGE STATIOI`I Post Office Box 9960. 1101 Texas Avenue College Station, Texas 77842-9960 (409) 7643500 1VIay 23, 1995 J. C. Noonan 3106 Stonybrook Houston, Texas 77063 VIA FACSIlViII,E AND REGULAR MAIL re: 8.0 ac. tract, Morgan Rector Tr. 97. Dear 1VIr. Noonan: I have reviewed your proposal to address the Kyle Street southern extension issue by dedicating athirty-five (35) foot wide right-of--way along the western boundary of your property. This will leave an additional thirty-five foot right-of--way on the adjacent tract for the City to acquire through dedication at development or other acquisition method. After review and consideration we have decided to recommend that right-of--way for the future Kyle extension is centered along your western boundary (consistent with your proposal above). We will present and support this recommendation to the City Council as part of the normal development review process for the project proposed on your tract. incerel , o~.. James M. Callaway Asst. Dir., Economic and Development Services :jc cc: Tom Brymer, Interim City Manager Elrey Ash, Director of Economic and Development Services Jane Kee, City Planner Kent Laza, City Engineer Home of Texas A&M Qniversity