Loading...
HomeMy WebLinkAboutMinutesPRESUBMISSION CONFERENCE REPORT March 2, 1995 TO: Michael McClure,. McClure Engineering 1722 Broadmoor, Suite 210, Bryan, TX 77802 Paul Darmitzel, TAC Realty, Inc. 1111 Briarcrest Drive, Suite 300, Bryan, TX 77802 FROM: Project Review Committee Jane Kee, City Planner Veronica Morgan, Assistant City Engineer Kyle Hawthorne, P & Z Chairman Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Brett McCully, Project Engineer Ray Crow, Assistant County Engineer George McLean, CSISD Representative SUBJECT: Preliminary Plat & Master Plan Woodcreek Phase Seven; proposed planned unit development to be located in the southwest quadrant of the Stonebrook Drive and Stonebridge Drive intersection near the Rock Prairie Road intersection; proposed 23 single family lots totaling 6.71 acres. (95-104 & 95-306) A Presubmission Conference Meeting was held Wednesday, March 1, 1995 to discuss the; above mentioned preliminary .plat and master plan. Assistant City Engineer Morgan moved to recommend approval of the preliminary plat and master plan with the following discretionary item: CONDITIONS OF APPROVAL: Discretionary Item: Some screening must be provided along the existing portion of Stonebridge Drive consisting of brick, wood or vegetation so that it screens the proposed development from Stonebridge Drive. PRC Report WoodcYeek Phase 7 Case #95-306 Page 2 of 2 The following is a list of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: An off-site drainage easement is required to cover the proposed storm drain outfall area at the time of final plat. Show the proposed drainage channel cross-section and easement to be dedicated by separate instrument. Because the utility service lines will extend through the common area and the individual lots, it will be the responsibility of the individual homeowners or homeowners association to maintain these private service lines. _ Change the notation to reflect that a P.U.D. #2 is requested and show the revised ratio calculations. Square footage restrictions can also be noted on the plat. Comments/Concerns: At the time of final plat, note that the appropriate parking spaces are being provided for each individual lot, and as visitor parking. _ There are easement requirements that are needed to serve this development that will be determined out in the field with the engineer due to the existing vegetation. If rear telephone service is requested, easements must be provided. The cable across lots 8, 9 and 10 of Woodcreek Section South must be reinforced. Coordinate service details with G.T.E. Representative Laverne Akin at (409) 821-4723.. The developer is responsible to supply lighting for the private street which must be metered and maintained by the developer/homeowner's association. Conduit nnust be provided per City design throughout the development. The developer is responsible for 20% of the total cost of electrical service. Coordinate details with Line Designer Don Lusk at (409) 764-3660. SUBMIT 15 COPIES OF THE REVISED PRELIlVIINARY PLAT AND MASTER PLAN BY FRIDAY MARCH 10, 1995 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, MARCH 16, 1995. THE CITY COUNCIL WILL CONSIDER THE PLAT ON THURSDAY, APRIL 13, 1995. BOTH MEETINGS WILL BE HELD IN THE CITY HALL TAG ROOM AT 1101 TEXAS AVENUE AT 7:00 P:M. Discretionary Items: /~ _ Is a subdivision fence proposed along Stonebridge Drive? C ` ~~ /U ~ Ordinance Requirements: _ An offsite drainage easement is required to cover the proposed storm drain outfall area at the time of final plat. Show the proposed drainage channel cross-section and easement to be dedicated by separate instrument. _ How will water and sanitary service be provided to each individual lot? The City will not extend the line through the common area and connect the public utility easement and the individual lots. ~ ~ ~,,~ f( ) ~ _ How will ost rading work and will it get to the pond? Comments/Concerns: ~'-~L _ There are easement requirements that are needed to serve this development that will be determined out in the field with the engineer due to the existing vegetation. If rear telephone service is requested, easements must be provided. The cable across lots 8, 9 and 10 of Woodcreek Section South must be reinforced. Coordinate service details with G.T.E. Representative Laverne Akin at (409) 821-4723. _ The developer is responsible to supply lighting for the private street which must be metered and maintained by the developer/homeowner's association. Conduit must be provided per City design throughout the development. The developer is responsible for 20% of the total cost of electrical service. Coordinate details with L'ne Designer Don Lusk at (409) 764-3660. b " " Y./ ~ (~~~ ^°) _ Z ~~ _ `~ ~- ~ ~ ~-- ~~~~__. ~~~~ d