Loading...
HomeMy WebLinkAboutStaff ReportCase No.: 95-304 Applicant: Lacour Investments STAFF REPORT ITEM SUNIlVIARY AND STAFF RECOIVIlVIENDATION This preliminary plat contains 12.23 acres and is located in the Wolf Pen Creek Distxict along the south side of SH 30 (Harvey Rd.). It is approximately 1050 feet east of the Texas Ave./SH 30 intersection, adjacent and east of the existing Taco Bell. The property is being divided into two lots, a 4.339 acre lot along SH 30 and the remainder as a reserve lot to the south. Wolf Pen Creek runs through the property and by ordinance, property dedication is required if the developer chooses not to develop the park area at this time. The developer intends to sell the 4.339 acre lot and wishes to defer the Wolf Pen Creek property dedication until such time as the City has funds available to develop that portion of the creek and park area. During the CIP Advisory Committee process thE; extension of Kyle south through this property was discussed and recommended. Staff would recommend this extension as well. Since the Kyle extension is not on the City's thoroughfare plan, staff is working on a development agreement with Lacour that wial defer the Wolf Pen Creek property dedication while dedicating the right-of--way for Kyle Street. This development agreement and all its elements will be presented at tl-e time the final plat is processed. Additionally staff will be negotiating the closing of the Taco Bell most easterly driveway while providing access through this property for Taco Bell traffic. Staff recommends approval of the preluninary plat with the Kyle Street extension and the provision of an access easement for Taco Bell. COUNCIL POLICY ENDS STATEMENTS -The following Ends Statements that are in bold are relevant to this particular case. Transportation/Mobility Parks & Recreation Health & Public Safety Education/Information Quality Service Cultural Arts Employment/Prosperity Civic Pride COMPREHENSIVE PLAN -The following are Goals and Objectives from the City's adopted Comprehensive Plan.. Applicable ones are in bold. Complies with Future Land Use Plan Map?: YES Development Goals and Objectives: LAND USE Protection of residential uses: Encourage use of vacant land w/services: Avoid strip commercial: Size and depth of property meets policies regarding strip commercial and Kyle extension will provide frontage on two streets TRANSPORTATION Provide major arterials to prevent congestion: Adequate pedestrian/bike movement: Ensure safety and ease of maintenance: Location of streets based on function: Includes Kyle ROW dedication Driveway access: Easement will be provided for Taco Bell so that driveway access can be relocated ECONOMIC DEVELOPMENT Compatible with environment: Encourage retirees: Encourage tourism: PARKS AND RECREATION Link parks by pathways:, and natural features: This property has WPC dedication area Combine parks with schools: HOUSING Maintain integrity of existing supply: Encourage diversified housing: C011~IlVI[TNITY APPEARANCE Promote good site design: Good appearance, minimize drainage; impacts, and increase pedestrian safety Prevent and eliminate unsightly conditions:. HISTORICAL OVERVIEW -There is a previous development agreement in the WPC area that deferred property dedication. It was at the time that Wolf Nursery was developing. That deferment was due to the fact that property ownership lines ran down the center of the creek and the City did not want to own only half of the area for park development and drainage improvement. This case is different in that one owner has both sides of the creek. However, there are advantages to deferring dedication in this case. The area is inaccessible as the City has no property or easement on either side: of it. There are other advantages that will be outlined in the development agreement that will be presented with the final plat. ENGINEERING COMI~IENT5 AND IMPACT STUDIES - Water -Water is available to Lot 1 through an existing line in SH 30. Water is not currently available to the reserve tract. Demands generated from the anticipated use on Lot 1 can be handled by the waterline along SH 30. Impacts for the reserve tract were not addressed in the impact study because of unknowns with possible development of the tract. The applicant has requested that they supplement the impact studies at the time of final platting of the reserve tract. Sewer -Available and adequate to Lot 1. Reserve tract has access to an 8" sewerline, upgrades may be necessary at the time of platting of the reserve tract. This will be addressed in the impact study supplement. Streets -Access to Lot l is to SH 30 which is adequate to handle anticipated traffic. The reserve tract will have access via the Kyle Street extension, which also should be adequate. n, Drainage -Drainage is currently overland toward the creek. Improvements made on both Lot 1 and the Reserve tract will have to comply with the Drainage Ordinance and the Wolf Pen Creek portion of the zoning ordinance at the time of site development. Flood Plain - Floodplain is located on both Lot 1 and the Reserve tract Sidewalks -Sidewalks will be required along SH 30 and along the Kyle extension at the time of platting or site development. Parkland Dedication -Not applicable to .commercial. If multifamily develops, parkland will be obtained at building permit. SUBDIVISION ORDINANCE COMPLIANCE Variance Requested - Delay impact studies and provision of water service to reserve tract until final platting of that tract. Oversize Request -Not applicable as Kyle is not on T-fare plan. Easement Dedications - As shown on the plat. ZONING ORDINANCE COMPLIANCE Applicant is requesting deferment of WPC property dedication through development agreement. Proposed Use -Commercial development. NOTIFICATION: Legal Notice Publication(s): Advertised Commission Hearing Date(s): 3-2-95 Advertised Council Hearing Dates: 3-23-95 Number of Notices Mailed to Property Owners Within 200' N/A