Loading...
HomeMy WebLinkAboutMinutesD~°aft P&Z Minutes December 7, 1995 AGENDA ITEM NO. 5: .Consideration of a final plat for the Edelweiss Estates Phase 10-A subdivision of 16 single family lots and the. extension of Mint Avenue; also includes a revised Master Plan for the entire subdivision. (95-213) Graduate Civil Engineer Homeyer presented the staff report and stated that the revised Master Plan incorporates the Rock Prairie Estates into Edelweiss Estates so they function as one name, Edelweiss Estates. The applicant has had numerous discussions with the staff regarding the extension of Rock Prairie Road. It is their desire to build Rock Prairie through to Wellborn this next year but does not wish to "tie" this plat to the construction of that road. The development agreement executed on January 18, 1993 between the City of College Station and Begonia Corporation states "Begonia agrees and understands that City will not approve a final plat for any phase of Rock Prairie Estates until Begonia completes the extension of Rock Prairie Road from the eastern boundary of the Begonia property to Wellborn Road". Although the applicant is requesting approval of a final plat of a phase of Rock Prairie Estates, staff believes that these sixteen lots, which will take access from Mint Avenue, should not mandate the extension of Rock Prairie Road. Instead, staff recommended that this requirement be waived for Phase 10-A and be imposed on any future phase north of Rock Prairie Road. Staff is encouraging the Rock Prairie extension and has been working with the developer toward a mutually agreeable monetary participation agreement. Staff recommended approval of the final plat and master development plan with the conditions identified by the Presubmission Conference and the removal of the requirement for Phase 10-A to extend Rock Prairie Road to Wellborn Road. Staff further recommended that the City enter into a development agreement at this time with the applicant establishing participation levels and construction timing of the Rock Prairie extension. Applicant Steve Arden approached the Commission and offered to answer any questions pertaining to the development. He stated that this plat is the first step in accelerating the construction of Rock Prairie Road. Mr. Arden stated that he anticipates Rock Prairie will be constructed very soon with or without the proposed 10-A development. Commissioner Smith moved to recommend approval of the final plat of Edelweiss Estates Phase 10-A subdivision with staff recommendations. Commissioner Lightfoot seconded the motion which passed unopposed (5 - 0). ~: PRESUBMISSION CONFERENCE REPORT November 22, 1995 TO: Jim Crowell, Begonia Corporation 1901 San Jacinto, Houston, TX 77002 Steve Arden, Brazosland Realty 4103 Texas Avenue, Bryan, TX 77802 Michael McClure, McClure Engineering, Inc. 1722 Broadmoor, Suite 210, Bryan, TX 7780 FROM: Project Review Committee Sabine Kuenzel, Senior Planner Veronica Morgan, Assistant City Enginee Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator George McLean, CSISD Representative 2 ~ i ,, , -.9 . ~ ~ (; a, ~f'_ '~~ _ ..J ~' '~ C ~j CT`s _-.~ r ~~~ I~ ~ jB ~~ 'i.,.4 SUBJECT: Final Plat -Edelweiss Estates Phase 10 A; proposed subdivision totaling 5.225 acres divided into 16 single family lots located southwest of the Elm Crest Subdivision along the extension of Mint Avenue. (95-243) A Presubmission Conference meeting was held Wednesday, November 22, 1995 to discuss the above mentioned final plat. The following is a list of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: Submit the completed Drainage Development Permit application and $100 fee prior to any site work. (A $300 subdivision inspection fee is also required prior to construction.) _ Submit information concerning the maintenance of the shared detention pond with the Elm Crest Subdivision prior to City Council consideration of the plat. Note the volume and page number of the off-site "public utility .and drainage easement" adjacent to lot 9 of block L (Designate the entire 20' easement as a "public utility and public drainage easement".) Add the word "public" to the easement abbreviations section. PRC Report Edelweiss 10 A Case #95-243 Page 2 of 2 Comments/Concerns: _ A Notice of Intent must be submitted to the Environmental Protection Agency prior to construction. _ Staff is researching the possibility of a temporary construction easement for the temporary turnaround at the end of Innsbruck Circle. Provide the following easements for telephone service: _ Along the rear of lots 1 through. 7 of block 2; _ Along the northeast side of lot 7, block 2; _ Along the northeast and southeast sides of lot 9, block 1; and, Along the southeast side of lot 8, block 1. G.T.E. will provide and place conduit in two locations on Innsbruck Circle. Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. Underground electrical service and 20% of the total. cost of service is required. The developer is responsible for installing all conduit per City design and requirements including street lights. Several 5' street light easements will be required once the design for the subdivision is completed. Coordinate electrical service and off-site easement details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. SUBMIT 15 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, DECEMBER 1, 1995 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, DECEMBER 7, 1995. THE CITY COUNCIL WILL CONSIDER THE FINAL PLAT ON THURSDAY, DECEMBER 14, 1995. BOTH MEETINGS WILL BE HELD AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION CITY HALL LOCATED AT 1101 TEXAS AVENUE SOUTH. Regular Item Consent Item Statutory Item Item Submitted By: Steve Homeyer, Graduate Civil Engineer For Council Meeting Of: December 14, 1995 Director Approval: Executive Member Approval: Ends Statements /Strategic Issues: Civic Pride -Citizens benefit from well planned, attractive residential and commercial areas. .Item: Consideration of a final plat for 5.23 acres of Edelweiss Estates Phase 10-A. (95-243) Item Summary: The subject property is located southwest of the. Elm Crest Subdivision along the extension of Mint Avenue. This plat will subdivide the property into 16 single family lots. The approval of this final plat also includes a revised Master Development Plan for Edelweiss Estates. This revised master plan incorporates the Rock Prairie Estates into Edelweiss Estates so that they function under one name, Edelweiss Estates. The applicant has had numerous discussion with the staff regarding the extension of Rock Prairie Road. It is their desire to build Rock Prairie through to Wellborn this next year but does not wish to "tie" this plat to the construction of Rock Prairie Road. The Development Agreement executed on January 18, 1993 between the City of College Station and Begonia Corporation states "BEGONIA agrees and understands that CITY will not approve a final plat for any phase of Rock Prairie Estates until BEGONIA completes the extension of Rock Prairie Road from the eastern. boundary of the Begonia property to Wellborn Road." Although the applicant is requesting approval of a final plat of a phase of Rock Prairie Estates, staff believes that these 16 lots, which will take access from Mint Avenue, should not mandate the extension of Rock Prairie Road. Instead, staff recommends that this requirement be waived for Phase 10-A and be imposed on any future phase north of Rock Prairie Road. Staff is encouraging the Rock Prairie extension and has been working with the developer toward a mutually agreeable monetary participation agreement. Staff recommends approval of the final plat and the master development plan with the conditions identified by the Presubmission Conference on November 22, 1995 and the removal of the requirement for Phase 40-A to extend Rock Prairie Road to Wellborn Road. Staff would further recommend that the City enter into a development agreement at this time with this applicant establishing participation levels and construction timing of the Rock Prairie extension. The Planning and Zoning Commission will hear this item at their December 7, 1995 meeting and the minutes of that meeting will be forwarded to you as soon as they become available. o:dev serv/cvsht/95-243sh Financial Summary: Funding for the City's share of this project will be provided using funds from the 1995 General Obligation Bonds. It will require a revision to the original schedule by moving the Rock Prairie Road project ($495,000) forward one year and moving the Kyle Right-of-Way acquisition ($550,000) back one year. This adjustment will allow funds to be available for Rock Prairie Road in September 1996. Staff Recommendation: Staff recommends approval with the Presubmission Conference comments and the removal of the requirement for Phase 10-A to extend Rock Prairie Road to Wellborn Road. Staff would further recommend that the City enter into a development agreement at this time with this applicant establishing participation levels and construction timing of the Rock Prairie extension. City Attorney Recommendation: N/A Council Action Desired: Approval of the final plat and the Master Development Plan. Supporting Materials: 1. Location Map 2. Staff Report 3. Application 4. P&Z Minutes when Available 5. Copy of Plat 6. Participation Tables o:dev sere/cvsht/95-243sh