Loading...
HomeMy WebLinkAboutMiscellaneous_-® -~ :;~ E GI EttING ®I SI® Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-0960 (409) 764-3570 MEMORANDUM TO: Planning and Zoning Commission FROM: Steve Homeyer, Graduate Civil Engineer DATE: November 16, 1995 RE: Final Plat of Harvey Road East and Gateway Park Replat. (95-242) The above referenced final plat, located at the corner of Harvey Road and State Highway 6, was reviewed at a Presubmission Conference on Wednesday, November 1, 1995. This final amending plat of Lot 1R of the Harvey Road East Subdivision and Lot 2, Block 2 of Gateway Park Subdivision reflects the as built conditions of the 30 foot private access easement. This easement provides access from the public alley to the Furrow Building Materials expansion. In addition to the Presubmission Conference comments, staff would request to have the private drainage easement designated as public with the condition. that all unimproved channel sections be maintained by the property owner. This designation gives the City the authority to enter the property during emergency situations to correct drainage problems. This concern however, was not discussed during the .Presubmission Conference but is considered to be of high importance, due to the. existing conditions of other private drainage easements. Staff would recommend approval of the final plat with the comments identified at the Presubmission Conference and the condition of making the drainage easement public. ~ - ~~. Plat Engineering Drawings (with ALL details) • water • sewer • streets • drainage (including detention, if applicable) • erosion control L~1 Drainage report per drainage ordinance ~ ~ ~ ~~'~ ~^~ Starting July 15th - an acceptance letter from TNRCC for sewer and water (if applicable) Engineer's Estimates Formal Oversize Participation Request Figures based on Engineer's Estimate (if applicable) $300.00 Subdivision Inspection Fee $100.00 Drainage Development Permit Fee & Completed Application Soil Testing Fee Schedule (as established by~Engineer of Record) & Fee