Planning & Zoning Commission
CITY OF COLLEGE STATION, TEXAS
November 16, 1995
7:00 P.M.
COMMISSIONERS PRESENT Chairman Hawthorne and Commissioners Gribou, Smith, Hall,
Garner and Lane.
COMMISSIONERS ABSENT: Commissioner Lightfoot
STAFF PRESENT: City Planner Kee, Assistant City Engineer Morgan, Senior Planner
Kuenzel, Graduate Civil Engineer Homeyer, Planning Technician
Thomas and Transportation Planner Hard.
AGENDA ITEM NO. 1: The Consent Agenda consists of non-controversial or
"housekeeping" items required by law. Items may be removed from the Consent Agenda by any
citizen, City staff member, or Commissioner by making such a request prior to a motion and
vote on the Consent Agenda.
(l.l) Approval of minutes from the meeting of November 2, 1995.
(1.2) Consideration of a final E.T.7. plat of Willow Run Subdivision Phase One. (95-230)
(1.3) Consideration of a final plat of Pebble Creek Phase 3C Subdivision. (95-241)
(1.4) Consideration of a final plat of Harvey Road East and Gateway Park Subdivisions.
(95-242)
Consent agenda items 1.1, 1.2, 1.3 and 1.4 were approved unanimously by consent.
AGENDA ITEM NO. 2: Consideration of a previously tabled conditional use permit request
to allow the Kanon Bible Church facility to be located at 317 Dominik in the Culpepper Plaza
Phase II Center. (95-712)
Commissioner Gribou moved to remove the conditional use permit request from the table for
consideration. Commissioner Lane seconded the motion which passed unopposed (6 - 0).
Senior Planner Kuenzel stated that the request was tabled to answer the following three questions:
(1) If the church is approved, how would existing sites that currently sell alcohol be affected
upon future repermitting?
(2) Is there a variance procedure to the 300' distance limitation?
(3) Will the Bentley House be restricted from placing refrigerators offering alcoholic
beverages in each room if the conditional use permit is granted?
Regular Item
x~ Consent Item
Statutory Item
Item Submitted By:
For Council Melting Of
Director Approval:
.Veronica J.B. Moraan. Asst. City Engineer
December 14. 1995
Executive Member Approval:
Ends Statements /Strategic Issues:#8 -Civic Pride
Item:Consideration of a Final Plat (Replat) of Pebble Creek Phase 3C, a right-
of-way dedication plat for a portion of Spearman Drive, located between Putter
Court and St. Andrews Street.(95-241)
Item Summary: This plat is a right-of-way dedication plat for Spearman Drive.
The purpose is to correct some existing drainage problE:ms in the area and
provide a better connection between a large portion of i;he Pebble Creek
Development and the Phase 5 sections where the new Pebble Creek
elementary school will be located. The applicant is requesting to delay the
installation of the sidewalk along the west side of Spearman, as portions would
have to be removed as new phases, with street intersections, come in on that
side. Because development on the east side of Spearman is complete,
installation of that sidewalk does not pose a problem. Staff is concerned with
the delay of the sidewalk on the west because of the anticipated August 1996
opening of the elementary school and the adjacent City park. Staff and the
applicant have agreed that the sidewalk could safely be delayed until May
1996, in the hopes that construction plans for the futurE: west phases would be
completed prior to that and construction would begin ar~d incorporate the
sidewalk. In the event that this does not occur, staff is recommending that the
applicant begin construction on this sidewalk in May so it will be complete
when school opens. In addition, the drainage from this street is being
designed to outfall into an open channel, which does not meet all of the City's
drainage criteria. Because this is a temporary measure, again awaiting
construction of the west phases, staff recommends thafi. the developer not
dedicate a public drainage easement across this section, and instead maintain
this section on private .property with assurances of maintenance. The
applicant is agreeable to these recommendations. The P&Z heard this item at
their November 16, 1995 meeting and recommended approval by consent.
Financial Summary:N/A
Staff Recommer-dation:Staff recommends approval of the plat with the
conditions as outlined above and at the PRC meeting.
City Attorney Recommendation: N/A
Council Action Desired:Approve or deny the plat.
Supporting Materials:
1. Application
2. Location Map
3. Staff Report
4. PRC Report
5. P&Z Minutes
6. Plat
PRESiJBMISSION CONFERENCE REPORT
November 2, 1995
TO: David Mayo
2167 Post Oak Circle, College Station, 77840
Davis Young, Pebble Creek De elopment Company
2167 Post Oak Circle, College S~ation, TX 77845
FROM: Project Review Committ ~"~
SUBJECT: Final Plat -Pebble Creek Phase 3C; subdivisiion dedication of Spearman Drive
totaling 1.9 acres adjoining the south line of Peblble Creek Phase 3B. (95-241)
A Presubmission Conference meeting was held Wednesday, ]November 1, 1995 to discuss the
above mentioned final plat.. The following is a list of ordinance requirements identified by
the Presubmission Conference. This list does not relieve tlhe applicant of total compliance
with alt current ordinance requirements.
Ordinance Requirements:
Provide a vicinity map.
Note that there is no floodplain on the subject property.
The applicant has requested to waive the construction of the sidewalk along the west side
( of Spearman Drive until the development of that propperty or May of 1996, whichever
comes first. Staff will recommend approval of this request with the condition that a
~ uarantee is posted for the design and construction of that sidewalk or the sidewalk is
r constructed and accepted prior to filing the plat for record.
Work with staff on the maintenance details of the temporary open channel drainage from
® Spearman Drive to the area west of that extension. Staff must be assured that the Pebble
Creek Development Company will be responsible for thhat drainage on their property and
any erosion or drainage problems resulting from this open channel on the adjacent
,to~~y,S• Business Center property.
Cf~
~ _
Jane Kee, City Pla
Veronica Morgan, Assis ant City Engineer
Julius Gribou, P&Z Re re ntative
Others Attending
__ Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
Laverne Akin, G.T.E. Representative
PRESUBMISSION CONFERENCE REPORT
November 2, 1995
TO: David Mayo
2167 Post Oak Circle, College Station, 77840
Davis Young, Pebble Creek De elopment Company
2167 Post Oak Circle, College tation, TX 77845
FROM: Project Review Committ~~ee~~
Jane Kee, City Planfier
Veronica Morgan, Assis ant~City Engineer
Julius Gribou, P&Z Re~res~~ntative
Others Attending //
Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
Laverne Akin, G.T.E. Representative
SUBJECT: Final Plat -Pebble Creek Phase 3C; subdivision dedication of Spearman Drive
totaling 1.9 acres adjoining the south line of Pebble Creek Phase 3B. (95-241)
A Presubmission Conference meeting was held Wednesday, November 1, 1995 to discuss the
above mentioned final plat. The following is a list of ordinance requirements identified by
the Presubmission Conference. This list does not relieve the applicant of total compliance
with all current ordinance requirements.
Ordinance Requirements:
_ Provide a vicinity map.
Note that. there is no floodplain on the subject property.
_ The applicant has requested to waive the construction of the sidewalk along the west side
of Spearman Drive until the development of that property or May of 1996, whichever
comes first. Staff will recommend approval of this request with the condition that a
guarantee is posted for the design and construction of that sidewalk or the sidewalk is
constructed and .accepted prior to filing the plat for record.
Work with staff on the maintenance details of the temporary open channel drainage from
Spearman Drive to the area west of that extension. Staff must be assured that the Pebble
Creek Development Company will be responsible for that drainage on their property and
any erosion or drainage problems resulting from this open channel on the adjacent
Business Center property.
PRC Report
Pebble Creek 3C
Case #95-241
Page 2 of 2
Comments/Concerns:
_ Coordinate telephone service details with G.T.E. Representative La Verne. Akin at (409)
821-4723.
Coordinate electrical service requirements with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
SUBMIT 13 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, NOVEMBER 10, 1995
TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR
THE MEETING OF NOVEMBER 16, 1995. THE CITY COUNCIL WILL CONSIDER THE
FINAL PLAT ON THURSDAY, DECEMBER 14, 1995. BOTH MEETINGS WILL BE HELD
AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION CITY HALL
LOCATED AT 1101 TEXAS AVENUE SOUTH.
STAFF PRC REPORT
Pebble Creek Please 3C
Case #95-241
Ordinance Requirements:
Provide a vicinity map.
Note the total acreage of the subject property.
_ The applicant has requested to waive the construction of the sidewalk along the west side
of Spearman Drive until the development of that property or May of 1996, whichever
comes first. Staff will recommend approval of this request with the condition that a
guarantee is posted for the design and construction of that sidewalk prior. to filing the plat
for record.
_ Work with staff on the maintenance details of the open channel drainage from Spearman
Drive to the area west of that extension. Staff must be assured that the Pebble Creek
Development Company will be responsible for that drainage on their .property and any
erosion or drainage problems resulting from this open channel on the adjacent Business
Center property.
Comments/Concerns:
_ Coordinate telephone service details with G.T.E. Representative La Verne Akin at (409)
821-4723..
_ Coordinate electrical service requirements with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.