HomeMy WebLinkAboutMiscellaneousMEMORANDUM
TO: Planning & Zoning Commission c
~~
~~ a~
FROM: Veronica 7.B. Morgan, Asst. City Engineer ~ .~,~~~'~~~-~
DATE: November 8, 1995
RE: FINAL PLAT -PEBBLE CREEKPHASE 3C (SPEARMANDRIVE ROW
DEDICATION)
The above referenced plat is located in the Pebble Creek Subdivision, east of the proposed
Pebble Creek Elementary School site and city park. This plat will close the gap in
Spearman Drive created when Phase 5 platted using access from Lakeway Drive. A
Presubmission Conference meeting was held on Wednesday, November 1, 1995 to discuss
this plat.. At that time there were only a few minor comments. Staff has worked with the
applicant to achieve the goal of providing a through street from the main portion of Pebble
Creek to the proposed school and neighborhood park facility, while trying to
accommodate future development plans adjacent to this thoroughfare. With that in mind,
the applicant has requested to waive the construction of the sidewalks along the west side
of Spearman Drive until the development of that property or May 1996, whichever occurs
first. The May 1996 date was established to assure that pedestrian access along
Spearman, to the school and park, would exist by the anticipated August 1996 opening of
the school. The applicant also requested to construct a temporary open channel from
Spearman Drive to the creek system downstream. This would avoid the reconstruction of
underground storm sewer when the new phases west of Spearman develop. Staffwould
concur with this request as long there is assurance that Pebble Creek Development
company will be responsible for the maintenance of this drainage facility. The applicant
has agreed to provide this assurance in their covenants. and restriction documents for the
subdivision. Staff recommends approval with the Presubmission conference comments.